5-CONCRETE 90%-SGC DEV SRCS Stamped.pdf
PDF 4 MB Posted
- Attached to
- IFB - SLICK ROCK SUBSTATION CONSTRUCTION
- Solicitation number
- 26-283
- Issued by
- Washington County, Utah
About this file
This is a concrete construction drawing set prepared by St. George Energy Services for the Slick Rock Substation project in St. George, Utah. The document set consists of detailed architectural and engineering plans dated March 31, 2026, showing concrete foundations, drilled pier details, transformer foundations, recloser and breaker foundations, control enclosure foundations with masonry plans and elevations, fence and precast wall details, and transmission structure specifications. The drawings are stamped "Not for Construction – For Approval Only" and include thirteen sheets (C001 through C110 and C200) containing design criteria, general notes, abbreviations, drilled pier schedules, anchor bolt schedules, plan views, and detailed elevation drawings for all major structural components of the substation.
The project involves comprehensive site preparation and construction work including excavation, grading, installation of concrete foundations, transformer containment pads, a control building, access gates, and a precast perimeter wall. Bidders are required to submit a bid bond equal to 5% of their bid amount, issued by a surety company licensed in Utah, with 100% payment and performance bonds required upon award. The City of St. George reserves the right to reject any or all proposals and waive any formality or technicality. The drawings provide specific technical specifications for all concrete work, foundation systems, and structural requirements necessary for contractors to prepare accurate bids and execute the construction work in accordance with the project specifications and site restoration requirements.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ST
. G
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
CO
N
CR
ET
E G
EN
ER
A L
N O
TE
S
C001
DESIGN CRITERIA
GENERAL NOTES
ABBREVIATIONS
03/31/26
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
CO
N
CR
ET
E G
EN
ER
A L
N O
TE
S
C002
DRILLED PIER NOTES
GENERAL CONCRETE NOTES
GENERAL MASONRY NOTES
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
CO
N
CR
ET
E
PL
A N
V
IE
W
C100
NORTH
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
CO
N
CR
ET
E D
RI
LL
ED
P
IE
R
D
ET
A
IL
S
C101
DRILLED PIER SCHEDULE
ANCHOR BOLT SCHEDULE
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
CO
N
CR
ET
E
RE
CL
O
SE
R
A N
D B
RE
A
K
ER
F O
U N
D A
TI
O
N S
C102
NORTH
NORTH
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
CO
N
CR
ET
E
TR
A N
SF
O
RM
ER
F O
U N
D A
TI
O
N S
C103
NORTH
ANCHOR BOLT SCHEDULE
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
CO
N
CR
ET
E
TR
A N
SF
O
RM
ER
F O
U N
D A
TI
O
N S
C10403/31/26
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
CO
N
CR
ET
E
CO
N
TR
O L
EN
CL
O
SU
RE
F
O U
N D
A
TI
O N
C105
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
CO
N
CR
ET
E
CO
N
TR
O L
EN
CL
O
SU
RE
F
O U
N D
A
TI
O N
C106
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
CO
N
CR
ET
E
CO
N
TR
O L
EN
CL
O
SU
RE
F
O U
N D
A
TI
O N
C107
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
CO
N
TR
O
L
EN
CL
O
SU
RE
M A
SO
N
RY
PL
A N
A N
D E
LE
V
A
TI
O N
S
C108
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
CO
N
TR
O
L
EN
CL
O
SU
RE
M A
SO
N
RY
PL
A N
A N
D E
LE
V
A
TI
O N
S
C109
C
ST
. G
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
FE
N
CE
P
RE
CA
ST
W A
LL
D
ET
A
IL
S
C110 A
EO
RG
E
EN
ER
G
Y S
ER
V
IC
ES
(4
) 6
-4
EA
ST
R
ED
H
IL
LS
P
KW
Y.
ST
. G
EO
R
G E, U
TA
H
SL
IC
K
RO
CK
S
U
BS
TA
TI
O N
TR
A
N
SM
IS
SI
O N
S
TR
U
CT
U
RE
P P#
A
CO
N
CR
ET
E N
O
TE
S A
N D
D
RI
LL
ED
P
IE
R D
ET
A
IL
S
C200
NOT FOR CONSTRUCTION
FOR APPROVAL ONLY
| Sheets and Views |
| 067-080-C001-C001 |
| 067-080-C002-C002 |
| 067-080-C100-C100 |
| 067-080-C101-C101 |
| 067-080-C102-C102 |
| 067-080-C103-C103 |
| 067-080-C104-C104 |
| 067-080-C105-C105 |
| 067-080-C106-C106 |
| 067-080-C107-C107 |
| 067-080-C108-C108 |
| 067-080-C109-C109 |
| 067-080-C110-C110 |
| 067-080-C200-Layout1 |
File details come from the government source that posted it. Updated .