This is a bid schedule cost submittal form for the UDOT Region 2 Pioneer Trail Improvements project issued by the Utah Department of Transportation (UDOT). The project involves the removal of existing concrete curb and gutter, pedestrian ramps, and sidewalk, along with the installation of new concrete curb and gutter, pedestrian ramps, and related infrastructure at NB & SB I-80 at mile posts 191.5 and 195. The scope includes 44 line items with estimated quantities, including pavecut (2,080 inch feet), removal of concrete curb and gutter (1,340 feet), removal of concrete flatwork at varying depths (705 square yards combined), removal of asphalt pavement (900 square yards), installation of concrete sidewalk (3,565 square feet), pedestrian access ramps (1,365 square feet), concrete curb and gutter (1,360 feet), drainage improvements, pavement markings, and sign installation and relocation. A mandatory virtual prebid meeting is scheduled for Wednesday, August 4, 2026, at 10:00 AM Mountain Time, with attendance required for bid eligibility and site visit participation. The project must be completed by November 20, 2026, and the awarded contractor will be required to submit a performance and payment bond.
Bidders must enter unit costs in the designated blue fields for each of the 44 line items, with the total project cost automatically calculated. Award will be based on the lowest overall cost from the total project costs summary table. Quantities listed are estimates only, with actual quantities to be determined in the field and payment rendered based on actual quantities performed. The bid schedule form is currently blank with all cost fields showing zero, requiring bidders to complete their pricing analysis. The Solicitation Number UDOT270027CN must be referenced on all submissions. This is a one-time purchase order contract awarded to the lowest responsive and responsible bidder in accordance with the State of Utah Procurement Code and Utah Administrative Code.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Insert Company Name Here | |||
| Cost submittal-Pioneer Trail Improvement Curb Extensions | Enter Bid Values in Blue Fields Only | ||
| Table 1: Locations of Installation, Upgrade, or Repair | |||
| Location | Type (Installation, upgrade. Or Repair) | General Scope | |
| NB & SB I-80 @ MP 191.5 & 195 | Installation | Pioneer Trail Improvement Curb Extensions |
| Table 2: Items & Estimated Quantities | Unit | Quantity | Unit cost | Total | |
| 1 | Pavecut | Inch Foot | 2080 | $ - 0 | |
| 2 | Remove Concrete Curb and Gutter | Ft | 1340 | $ - 0 | |
| 3 | Remove Concrete Flatwork (0- to 5-inch Depth) | Sq Yd | 480 | $ - 0 | |
| 4 | Remove Concrete Flatwork (5- to 9-inch Depth) | Sq Yd | 225 | $ - 0 | |
| 5 | Remove Asphalt Pavement | Sq Yd | 900 | $ - 0 | |
| 6 | Landfill Dump Fee | TON | 1200 | $ - 0 | |
| 7 | Granular Borrow | TON | 26 | $ - 0 | |
| 8 | Untreated Base Course | TON | 150 | $ - 0 | |
| 9 | Flowable Fill | Cu Yd | 2 | $ - 0 | |
| 10 | Hot Mix Asphalt - 1/2 inch | TON | 145 | $ - 0 | |
| 11 | Concrete Sidewalk | Sq Ft | 3565 | $ - 0 | |
| 12 | Concrete Driveway | Sq Ft | 785 | $ - 0 | |
| 13 | Detectable Warning Surface (Polymer Composite Installation) | Sq Ft | 160 | $ - 0 | |
| 14 | Pedestrian Access Ramp | Sq Ft | 1365 | $ - 0 | |
| 15 | Concrete Curb and Gutter Type B1 – Greater Than 50 Feet | Ft | 1360 | $ - 0 | |
| 16 | Drainage Excavation and Backfill | Cu Yd | 25 | $ - 0 | |
| 17 | Solid Cover or Bicycle-Safe Frame and Grate | Each | 3 | $ - 0 | |
| 18 | Remove Catch Basin | Each | 2 | $ - 0 | |
| 19 | Mobilization - Pioneer Trail Project | Lump | 1 | $ - 0 | |
| 20 | Traffic Control - Pioneer Trail Project | Lump | 1 | $ - 0 | |
| 21 | Survey | Lump | 1 | $ - 0 | |
| 22 | Stone Check Dam - Gravel Bag | Ft | 60 | $ - 0 | |
| 23 | Gutter-Inlet Barrier | Each | 6 | $ - 0 | |
| 24 | Remove Pipe | Ft | 39 | $ - 0 | |
| 25 | Cast-in-Place Concrete Drainage Box Up to 5 Ft Deep | Each | 3 | $ - 0 | |
| 26 | Drainage Pipe - 12 inch, Ductile Iron, Class 53 | Ft | 38 | $ - 0 | |
| 27 | Loop/Relocate Buried Electric (Contingent Item) | Each | 4 | $ - 0 | |
| 28 | Loop/Relocate Buried Fiber (Contingent Item) | Each | 6 | $ - 0 | |
| 29 | Remove Pavement Message | Ft | 200 | $ - 0 | |
| 30 | Pavement Marking Paint | Ft | 20 | $ - 0 | |
| 31 | Pavement Marking Paint (Stop Line Crosswalk - 12 inch) | Ft | 620 | $ - 0 | |
| 32 | Concrete Valley Gutter | Sq Ft | 2000 | $ - 0 | |
| 33 | Relocate Underground Junction Box | Each | 1 | $ - 0 | |
| 34 | Relocate Light Pole | Each | 1 | $ - 0 | |
| 35 | Sign Type A-1 | Sq Ft | 29 | $ - 0 | |
| 36 | Sign Type A-2 | Sq Ft | 83 | $ - 0 | |
| 37 | Remove Sign Less Than 20 Square Feet | Each | 26 | $ - 0 | |
| 38 | Relocate Sign Less Than 20 Square Feet | Each | 5 | $ - 0 | |
| 39 | Relocate Sign Greater Than or Equal to 20 Square Feet | Each | 1 | $ - 0 | |
| 40 | Small Sign Tubular Steel Post Base (B1) | Each | 7 | $ - 0 | |
| 41 | Slipbase Sign Base (B3) | Each | 9 | $ - 0 | |
| 42 | Sign Post P2 | Each | 7 | $ - 0 | |
| 43 | Sign Post P3 | Each | 9 | $ - 0 | |
| 44 | Test Hole (Contingent Item) | Each | 10 | $ - 0 | |
| Table 2 cost | $ - 0 | ||||
| Total Project Cost Summary Table | Total | ||||
| Base Bid (Items 1-44 on table 2) | $ - 0 | ||||
| Fields in this table will automatically populate based on bids. |
| Basis of Award |
| Award will be given to contractor with the overall lowest cost from the total project costs summary table. Quantities listed are for estimate purposes only, actual quantities may be more or less and will be determined in the field. Contractor will be paid based on actual quantities |