5-Attachment C Bid Shedule Cost submittal-Pioneer Trail Improvement Curb Extensions.xlsx

XLSX spreadsheet 78 KB Posted

Attached to
UDOT Region 2 Pioneer Trail Improvements -
Solicitation number
UDOT270027CN -
Issued by
Utah

About this file

This is a bid schedule cost submittal form for the UDOT Region 2 Pioneer Trail Improvements project issued by the Utah Department of Transportation (UDOT). The project involves the removal of existing concrete curb and gutter, pedestrian ramps, and sidewalk, along with the installation of new concrete curb and gutter, pedestrian ramps, and related infrastructure at NB & SB I-80 at mile posts 191.5 and 195. The scope includes 44 line items with estimated quantities, including pavecut (2,080 inch feet), removal of concrete curb and gutter (1,340 feet), removal of concrete flatwork at varying depths (705 square yards combined), removal of asphalt pavement (900 square yards), installation of concrete sidewalk (3,565 square feet), pedestrian access ramps (1,365 square feet), concrete curb and gutter (1,360 feet), drainage improvements, pavement markings, and sign installation and relocation. A mandatory virtual prebid meeting is scheduled for Wednesday, August 4, 2026, at 10:00 AM Mountain Time, with attendance required for bid eligibility and site visit participation. The project must be completed by November 20, 2026, and the awarded contractor will be required to submit a performance and payment bond.

Bidders must enter unit costs in the designated blue fields for each of the 44 line items, with the total project cost automatically calculated. Award will be based on the lowest overall cost from the total project costs summary table. Quantities listed are estimates only, with actual quantities to be determined in the field and payment rendered based on actual quantities performed. The bid schedule form is currently blank with all cost fields showing zero, requiring bidders to complete their pricing analysis. The Solicitation Number UDOT270027CN must be referenced on all submissions. This is a one-time purchase order contract awarded to the lowest responsive and responsible bidder in accordance with the State of Utah Procurement Code and Utah Administrative Code.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Insert Company Name Here
Cost submittal-Pioneer Trail Improvement Curb ExtensionsEnter Bid Values in Blue Fields Only
Table 1: Locations of Installation, Upgrade, or Repair
LocationType (Installation, upgrade. Or Repair)General Scope
NB & SB I-80 @ MP 191.5 & 195InstallationPioneer Trail Improvement Curb Extensions
Table 2: Items & Estimated QuantitiesUnitQuantityUnit costTotal
1PavecutInch Foot2080$ - 0
2Remove Concrete Curb and GutterFt1340$ - 0
3Remove Concrete Flatwork (0- to 5-inch Depth)Sq Yd480$ - 0
4Remove Concrete Flatwork (5- to 9-inch Depth)Sq Yd225$ - 0
5Remove Asphalt PavementSq Yd900$ - 0
6Landfill Dump FeeTON1200$ - 0
7Granular BorrowTON26$ - 0
8Untreated Base CourseTON150$ - 0
9Flowable FillCu Yd2$ - 0
10Hot Mix Asphalt - 1/2 inchTON145$ - 0
11Concrete SidewalkSq Ft3565$ - 0
12Concrete DrivewaySq Ft785$ - 0
13Detectable Warning Surface (Polymer Composite Installation)Sq Ft160$ - 0
14Pedestrian Access RampSq Ft1365$ - 0
15Concrete Curb and Gutter Type B1 – Greater Than 50 FeetFt1360$ - 0
16Drainage Excavation and BackfillCu Yd25$ - 0
17Solid Cover or Bicycle-Safe Frame and GrateEach3$ - 0
18Remove Catch BasinEach2$ - 0
19Mobilization - Pioneer Trail ProjectLump1$ - 0
20Traffic Control - Pioneer Trail ProjectLump1$ - 0
21SurveyLump1$ - 0
22Stone Check Dam - Gravel BagFt60$ - 0
23Gutter-Inlet BarrierEach6$ - 0
24Remove PipeFt39$ - 0
25Cast-in-Place Concrete Drainage Box Up to 5 Ft DeepEach3$ - 0
26Drainage Pipe - 12 inch, Ductile Iron, Class 53Ft38$ - 0
27Loop/Relocate Buried Electric (Contingent Item)Each4$ - 0
28Loop/Relocate Buried Fiber (Contingent Item)Each6$ - 0
29Remove Pavement MessageFt200$ - 0
30Pavement Marking PaintFt20$ - 0
31Pavement Marking Paint (Stop Line Crosswalk - 12 inch)Ft620$ - 0
32Concrete Valley GutterSq Ft2000$ - 0
33Relocate Underground Junction BoxEach1$ - 0
34Relocate Light PoleEach1$ - 0
35Sign Type A-1Sq Ft29$ - 0
36Sign Type A-2Sq Ft83$ - 0
37Remove Sign Less Than 20 Square FeetEach26$ - 0
38Relocate Sign Less Than 20 Square FeetEach5$ - 0
39Relocate Sign Greater Than or Equal to 20 Square FeetEach1$ - 0
40Small Sign Tubular Steel Post Base (B1)Each7$ - 0
41Slipbase Sign Base (B3)Each9$ - 0
42Sign Post P2Each7$ - 0
43Sign Post P3Each9$ - 0
44Test Hole (Contingent Item)Each10$ - 0
Table 2 cost$ - 0
Total Project Cost Summary TableTotal
Base Bid (Items 1-44 on table 2)$ - 0
Fields in this table will automatically populate based on bids.
Basis of Award
Award will be given to contractor with the overall lowest cost from the total project costs summary table. Quantities listed are for estimate purposes only, actual quantities may be more or less and will be determined in the field. Contractor will be paid based on actual quantities

File details come from the government source that posted it. Updated .