5_-_APPENDIX_D_-_US_ARMY_CORPS_GUIDLINES_VIDEO_INSPECTION_OF_CONDUITS.pdf

PDF 627 KB Posted

Attached to
Scranton Levee Storm Pipe Inspection
Solicitation number
2026-ITB-144
Issued by
Lackawanna County, Pennsylvania

About this file

This document is the U.S. Army Corps of Engineers Guidelines for Video Inspection of Conduits, issued by the Baltimore District Levee Safety Program on March 21, 2012. The guidelines establish standards for video inspection of pipes that penetrate or underlie flood protection systems, including gravity pipes and pump station discharge pipes. The scope requires that inspectors verify pipe condition using television camera video taping or visual inspection methods, with reports made available for review by inspectors. Inspections must be conducted by or under the supervision of a registered professional engineer. The guidelines specify minimum equipment requirements, including bright high-intensity light sources, remote pan/zoom/tilt/focus capabilities, color display with minimum 640 x 480 resolution, maximum speed of 30 feet per minute, and the ability to capture still-picture documentation of significant defects in color JPEG format. The inspection process includes detailed documentation of inspection details, deficiency details organized by structural condition and service defects, and an executive summary with pipe condition ratings categorized as Acceptable (A), Minimally Acceptable (M), or Unacceptable (U).

Inspection requirements vary by pipe location: pipes within levee embankment sections must be inspected headwall to headwall; pipes beneath levee embankments and T-Wall sections require a minimum 8 to 15 horizontal feet of inspection perpendicular from the structure toe or face, with continuation to the riverside headwall if the pipe does not daylight within the specified distance; and discharge pipes from pump stations must be inspected between pump discharge and the end of the discharge line at the headwall or gatewell. For third-party high-pressure pipes regulated by other agencies, local sponsors must obtain inspection documentation and perform assessment using the same process. All inspection materials, including electronic videos on CD or DVD configured for Windows Media Player compatibility, still-capture pictures of defects, and printed inspection logs, must be submitted within one month of completion, labeled with contractor information, project name, pipe identification, disk numbering, section references, and inspection dates.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX D

GUIDLINES FOR VIDEO INSPECTION

OF CONDUITS

US ARMY CORPS OF ENGINEERS

MARCH 21 2012

Last Updated: 21 March 2012 -T

U.S. Army Corps of Engineers ► Levee Safety Program ◄ Baltimore District

Guidelines for Conduit Inspection 1/4

Guidelines for Video Inspection of Conduits

1. SCOPE

The work described below fulfills the requirements stated in the inspection checklist that “Condition of pipes has been verified using television camera video taping or visual inspection methods within the past five years, and the report for every pipe is available for review by the inspector.” Inspection should be performed on all gravity pipes that penetrate under or through the flood protection system and discharge pipes from pump stations. Although not specifically required by this guidance, pipes may also be coded using the National Association of Sewer Service Companies (NASSCO) Pipeline Assessment Certification Program (PACP) in addition to the requirements herein. Third-party high-pressure pipelines (TPHPP) are regulated by other agencies and USACE recognizes those inspection methods as appropriate on a case-by-by case basis. Further information in relation to TPHPP can be found in Section 3.

2. INSPECTION

A. Inspectors: Individuals carrying out inspection of pipes should be working under the supervision of, or be qualified as, a registered professional engineer.

B. Cleaning: As defined by the registered professional engineer supervising the inspection, any pipe which exhibits a level of buildup of a substance that inhibits the inspection of the pipe shall be cleaned and then re-inspected.

C. Equipment:

1) The camera moves through the pipe at a constant rate, stopping when necessary to permit proper documentation of the pipe's condition for assessment.

2) Inspection equipment should have at the minimum:

a) Bright, high intensity light source, preferably capable of controlling the intensity

b) Ability to pan, zoom, tilt, and focus remotely

c) Capable to function in 100% humidity environment

d) Color display, with a minimum resolution of 640 x 480

e) Maximum speed of 30 feet per minute.

f) Obtain a still picture (color jpeg format) of all significant defects observed during inspection.

g) Ability to record distance measurements to the nearest 0.1 foot

h) During the inspection, clearly and continuously display the following information on the periphery of the screen, monitor and video recording:

i. Starting Location ID

ii. Ending Location ID

iii. Distance from Starting Location

D. Assessment: Pipe condition assessment should be carried out and noted in a similar fashion to the sample provided on the attached form. The information listed on the form should include, but is not limited to the following:

1) Inspection Details

a) Date of inspection

b) Inspector

c) Nearest station number (referring to the flood risk management project’s historical alignment) to pipe that is being inspected

d) GPS coordinates of the inlet and outlet along with estimated accuracy

e) Manhole depth (invert to top of casting to nearest 0.1’)

f) Segment length (from inside wall of adjacent manholes to nearest 0.1’)

g) Description of Purpose of Pipe

2/4

h) Type of Pipe (material, diameter, shape)

i) Inspection Method

2) Deficiency Details (Including but not limited too)

a) Record location along conduit (Reference all distance measurements to the nearest 0.1 foot, using a readily identifiable baseline, preferably near point of entry, such as a headwall, manhole, or sluice gate.), clock position (deficiency location in relation to the position of the hour hand of a clock) and defect for each picture.

b) Structural condition and deformation of the pipe walls

i. Cracked, fractured, torn, displaced, or offset joints

ii. Holes or perforations, as well as movement of soil through voids

iii. Deviations from horizontal or vertical alignment

iv. Cracking, flaking, erosion, or exposed reinforcing steel

v. Corrosion, rusting, flaking, or delamination of steel pipe

vi. Condition of joints and pipe walls

vii. Cracking of clay, fiberglass, or plastic pipe

viii. Standing water/sag conditions

c) Service Defects and Features

i. Roots

ii. Infiltration/exfiltration

iii. Encrustation (accumulation of sand, silt, or other material in the pipe as described by loss of cross-sectional area)

a. Light= 0-5%

b. Medium= 5-20%

c. Heavy= 20-100%

iv. Debris

v. Obstruction (Large object creating loss of cross-section)

vi. Fluctuations in water level

d) Construction Features and Defects

i. Size, location and condition of pipe laterals w/clock position

ii. Defective, intruding, or recessed connections

iii. Defective junctions

3) Executive Summary

a) Summary of deficiencies found in pipe

b) Rating (given in accordance with section 11 under the “Levee

Embankments” category, as found in the USACE Levee Inspection Checklist)

i. A (Acceptable) - There are no breaks, holes, cracks in the discharge pipes/ culverts that would result in significant water leakage. The pipe shape is still essentially circular. All joints appear to be closed and the soil tight. Corrugated metal pipes, if present, are in good condition with 100% of the original coating still in place (either asphalt or galvanizing) or have been relined with appropriate material, which is still in good condition.

ii. M (Minimally Acceptable) - There are a small number of corrosion pinholes or cracks that could leak water and need to be repaired, but the entire length of pipe is still structurally sound and is not in danger of collapsing. Pipe shape may be ovalized in some locations but does not appear to be approaching a curvature reversal. A limited number of joints may have opened and soil loss may be beginning. Any open joints should be repaired prior to the next inspection. Corrugated metal pipes, if present, may be

3/4 showing corrosion and pinholes but there are no areas with total section loss.

iii. U (Unacceptable) - Culvert has deterioration and/or has significant leakage; it is in danger of collapsing or as already begun to collapse. Corrugated metal pipes have suffered 100% section loss in the invert.

E. Obstruction of Pipe: If inspection of an entire pipe segment cannot be completed due to a collapse, excessive deformation, debris, intruding connections, obstructions or large displaced joints, move equipment to the downstream manhole/headwall and attempt inspection in the upstream direction. Track all locations where a complete inspection is not obtained and clearly document the length of pipe not inspected, location, segment, distance from adjacent manholes, etc.

F. Limits of Video Inspection:

1. Within Levee Embankment Sections - Pipes penetrating the levee embankment cross section are video inspected from headwall to headwall.

2. Beneath Levee Embankment Sections - Pipes underlying levee embankments which do not daylight at the levee toes are video inspected a minimum distance of 15 horizontal feet as measured perpendicular from either toe; however, the video inspection continues to the riverside headwall if the pipe does not daylight within the 15 horizontal feet.

3. T-Wall Sections – Pipes underlying T-Walls are video inspected a minimum distance of 8 horizontal feet as measured perpendicular from either side of the base; however, the video inspection continues to the riverside headwall if the pipe does not daylight within the 8 horizontal feet.

4. I-Wall Sections - Pipes underlying I-Walls are video inspected a minimum distance of 15 horizontal feet as measured perpendicular from either face of the wall; however, the video inspection continues to the riverside headwall if the pipe does not daylight within the 15 horizontal feet.

5. Discharge Pipes from Pump Stations - Discharge pipes from the pump stations are video-inspected between the pump discharge and the end of the discharge line at the headwall/gatewell. If the discharge pipe ends in a gatewell, video-inspection from the gatewell to the headwall at the river is required. In this case, pipe access may be possible through an air vent and a push camera with adequate lighting may be used.

6. Third Party High Pressure Pipes (TPHPP)

a. High-pressure water distribution pipes are not federally regulated and may have a pipe inspection program in place. If so, the local Sponsor shall obtain the TPHPP documentation and shall perform an assessment using the same process highlighted in Section 2.

b. Natural gas pipeline safety is regulated under 49 CFR 192, Part 192.

Reports shall be obtained by the Sponsor and shall perform an assessment using the same process highlighted in Section 2.

c. Hazardous waste pipelines are regulated under 49 CFR 195, Part 195.

Reports shall be obtained by the Sponsor and shall perform an assessment using the same process highlighted in Section 2.

3. REPORTS AND SUBMITTALS

A. Submit two copies of the following items within one month following completion of all required video inspection activities:

4/4

1. Electronic inspection videos recorded and organized on CD or DVD.

2. Electronic still-capture pictures of significant defects on CD or DVD.

3. Printed inspection logs (USACE realizes that there are a multitude of reporting programs available for these types of inspections, a sample of one version is attached)

4. While this guidance does not stipulate that a registered professional engineer must seal and sign for the inspections, the Sponsor must provide verification that the inspections and assessments were carried out in accordance with Section 2.

B. All inspection videos are either:

1. Configured for viewing using the last version of Windows Media Player, or,

2. The appropriate viewing software must be submitted on each CD or DVD. Files are configured to have the ability to use all features of the video player including fast forward capability.

C. Label each CD or DVD with the following information:

1. Name of Inspection Contractor w/address

2. Flood Risk Management Project/ System

3. Pipe IDs by Station and Drainage Structure Number

4. Disk ___ of ____

5. Section _____ to Section ____

6. Date of Inspection

Guidance Last Updated 21 March 2012 by Joe Reed, Baltimore District USACE, joseph.c.reed@usace.army.mil.