About this file

This document is the U.S. Army Corps of Engineers Guidelines for Human/Visual Inspection of Conduits, issued by the Baltimore District on March 21, 2012. The guidelines establish standards for visual and human inspection of gravity pipes and discharge pipes from pump stations that penetrate under or through flood protection systems, including levees. The scope of work requires inspections to be completed within five years and encompasses all pipes discharging from pump stations, with optional coding using the National Association of Sewer Service Companies Pipeline Assessment Certification Program. Inspections must be conducted by individuals working under the supervision of or qualified as registered professional engineers, with all work adhering to safety standards outlined in EM 385-1-1. The guidelines require submission of two copies of inspection materials within one month following completion of all inspection activities, including electronic still-capture pictures of significant defects on CD or DVD and printed inspection logs.

The guidelines specify detailed assessment requirements including inspection details such as date, inspector name, GPS coordinates, manhole depth, segment length, pipe type, and inspection method. Deficiency documentation must include location along the conduit referenced to the nearest 0.1 foot with clock position notation, structural condition evaluations addressing cracks, holes, joint conditions, and corrosion, and service defects including roots, infiltration/exfiltration, encrustation levels, and obstructions. Inspection ratings follow the USACE Levee Inspection Checklist categories: Acceptable (A) for pipes with no significant breaks or leakage; Minimally Acceptable (M) for pipes with limited corrosion or cracks requiring repair; and Unacceptable (U) for pipes with significant deterioration and collapse risk. Inspection limits vary by location type, ranging from 8 to 15 horizontal feet from levee or wall sections, with extensions to headwalls as necessary. The document does not address pricing, set-asides, or funding sources.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX C

GUIDLINES FOR HUMAN/VISUAL INSPECTION

OF CONDUITS

US ARMY CORPS OF ENGINEERS

MARCH 21 2012

Last Updated: 21 March 2012-T

U.S. Army Corps of Engineers ► Levee Safety Program ◄ Baltimore District

Guidelines for Conduit Inspection 1/3

Guidelines for Human/Visual Inspection of Conduits

1. SCOPE

The work described below fulfills the requirements stated in the inspection checklist that “Condition of pipes has been verified using television camera video taping or visual inspection methods within the past five years, and the report for every pipe is available for review by the inspector.” Inspection should be performed on all gravity pipes that penetrate under or through the flood protection system and discharge pipes from pump stations. Although not specifically required by this guidance, pipes may also be coded using the National Association of Sewer Service Companies (NASSCO) Pipeline Assessment Certification Program (PACP) in addition to the requirements herein. Third-party high-pressure pipelines (TPHPP) are regulated by other agencies and USACE recognizes those inspection methods as appropriate on a case-by-by case basis. Further information in relation to TPHPP can be found in Section 3 of the accompanying “Guidelines for Video Inspection of Conduits”.

2. INSPECTION

A. Inspectors: Individuals carrying out inspection of pipes should be working under the supervision of, or be qualified as, a registered professional engineer. All inspections utilizing a human/ visual means to complete the inspection should work under the highest standard of safety including those listed in EM 385-1- 1.

B. Cleaning: As defined by the registered professional engineer supervising the inspection, any pipe which exhibits a level of buildup of a substance that inhibits the inspection of the pipe shall be cleaned and then re-inspected.

C. Equipment:

1) All appropriate permits (if applicable), air monitoring, communication, and rescue equipment required for safe entry

2) Other inspection equipment:

a) Bright, high intensity light source, preferably capable of controlling the intensity

b) Camera, with a minimum resolution of 640 x 480

c) Device to record distance measurements to the nearest 0.1 foot

D. Assessment: Pipe condition assessment should be carried out and noted in a similar fashion to the sample provided on the attached form. The information listed on the form should include, but is not limited to the following:

1) Inspection Details

a) Date of inspection

b) Inspector

c) Nearest station number to pipe that is being inspected

d) GPS coordinates of the inlet and outlet along with the estimated accuracy

e) Manhole depth (invert to top of casting to nearest 0.1’)

f) Segment length (from inside wall of adjacent manholes to nearest 0.1’)

g) Description of Purpose of Pipe

h) Type of Pipe (material, diameter, shape, segment length)

i) Inspection Method

2) Deficiency Details (Including but not limited too)

a) Record location along conduit (Reference all distance measurements to the nearest 0.1 foot, using a readily identifiable baseline, preferably near point of entry, such as a headwall, manhole, or sluice gate.), clock position (deficiency location in relation to the position of the hour hand of a clock)

2/3 and defect for each picture.

b) Structural condition and deformation of the pipe walls

i. Cracked, fractured, torn, displaced, or offset joints

ii. Holes or perforations, as well as movement of soil through voids

iii. Deviations from horizontal or vertical alignment

iv. Cracking, flaking, erosion, or exposed reinforcing steel

v. Corrosion, rusting, flaking, or delamination of steel pipe

vi. Condition of joints and pipe walls

vii. Cracking of clay, fiberglass, or plastic pipe

viii. Standing water/sag conditions

c) Service Defects and Features

i. Roots

ii. Infiltration/exfiltration

iii. Encrustation (accumulation of sand, silt, or other material in the pipe as described by loss of cross-sectional area)

a. Light= 0-5%

b. Medium= 5-20%

c. Heavy= 20-100%

iv. Debris

v. Obstruction (Large object creating loss of cross-section)

vi. Fluctuations in water level

d) Construction Features and Defects

i. Size, location and condition of pipe laterals w/clock position

ii. Defective, intruding, or recessed connections

iii. Defective junctions

3) Executive Summary

a) Summary of deficiencies found in pipe

b) Rating (given in accordance with section 11 under the “Levee

Embankments” category, as found in the USACE Levee Inspection Checklist)

i. A (Acceptable) - There are no breaks, holes, cracks in the discharge pipes/ culverts that would result in significant water leakage. The pipe shape is still essentially circular. All joints appear to be closed and the soil tight. Corrugated metal pipes, if present, are in good condition with 100% of the original coating still in place (either asphalt or galvanizing) or have been relined with appropriate material, which is still in good condition.

ii. M (Minimally Acceptable) - There are a small number of corrosion pinholes or cracks that could leak water and need to be repaired, but the entire length of pipe is still structurally sound and is not in danger of collapsing. Pipe shape may be ovalized in some locations but does not appear to be approaching a curvature reversal. A limited number of joints may have opened and soil loss may be beginning.

Any open joints should be repaired prior to the next inspection.

Corrugated metal pipes, if present, may be showing corrosion and pinholes but there are no areas with total section loss.

iii. U (Unacceptable) - Culvert has deterioration and/or has significant leakage; it is in danger of collapsing or as already begun to collapse.

Corrugated metal pipes have suffered 100% section loss in the invert.

E. Obstruction of Pipe: If inspection of an entire pipe segment cannot be completed due to a collapse, excessive deformation, debris, intruding connections, obstructions or large

3/3 displaced joints, move to the downstream manhole/headwall and attempt inspection in the upstream direction (only if it is safe). Track all locations where a complete inspection is not obtained and clearly document the length of pipe not inspected, location, segment, distance from adjacent manholes, etc.

F. Limits of Inspection:

1. Within Levee Embankment Sections - Pipes penetrating the levee embankment cross section are inspected from headwall to headwall.

2. Beneath Levee Embankment Sections - Pipes underlying levee embankments which do not daylight at the levee toes are inspected a minimum distance of 15 horizontal feet as measured perpendicular from either toe; however, the video inspection continues to the riverside headwall if the pipe does not daylight within the 15 horizontal feet.

3. T-Wall Sections – Pipes underlying T-Walls are video inspected a minimum distance of 8 horizontal feet as measured perpendicular from either side of the base;

however, the inspection continues to the riverside headwall if the pipe does not daylight within the 8 horizontal feet.

4. I-Wall Sections - Pipes underlying I-Walls are video inspected a minimum distance of 15 horizontal feet as measured perpendicular from either face of the wall;

however, the inspection continues to the riverside headwall if the pipe does not daylight within the 15 horizontal feet.

5. Discharge Pipes from Pump Stations - Discharge pipes from the pump stations are video-inspected between the pump discharge and the end of the discharge line at the headwall/gatewell. If the discharge pipe ends in a gatewell, inspection from the gatewell to the headwall at the river is required. In this case, pipe access may be possible through an air vent and a push camera with adequate lighting may be used.

3. REPORTS AND SUBMITTALS

A. Submit two copies of the following items within one month following completion of all required inspection activities:

1. Electronic still-capture pictures of significant defects on CD or DVD.

2. Printed inspection logs (USACE realizes that there are a multitude of reporting programs available for these types of inspections, a sample of one version is attached)

3. While this guidance does not stipulate that a registered professional engineer must seal and sign for the inspections, the Sponsor must provide verification that the inspections and assessments were carried out in accordance with Section 2.

B. Label each CD or DVD with the following information:

1. Name of Inspection Contractor w/address

2. Flood Risk Management Project/ System

3. Pipe IDs by Station and Drainage Structure Number

4. Disk ___ of ____

5. Section _____ to Section ____

6. Date of Inspection

Guidance Last Updated 21 March 2012 by Joe Reed, Baltimore District USACE, joseph.c.reed@usace.army.mil.