About this file

This document is US Army Corps of Engineers guidance for visual inspection of pipes penetrating levees, issued in February 2018. The guidance establishes standardized procedures for inspecting gravity pipes, pump station discharge pipes, and third-party high-pressure pipelines that penetrate or underlie flood protection systems. The inspection process must be conducted during periods of low or no flow, with all debris removed prior to inspection. Inspectors must be qualified professionals working under the direction of or as registered professional engineers, possessing knowledge of pipe design, construction, potential defects, failure modes, and project-specific history. Entry/walk-through inspections require adherence to confined space entry procedures and comprehensive safety protocols. Documentation must be submitted to USACE within two weeks of field inspection in a bound report format.

The guidance specifies minimum inspection limits based on structural type: pipes within levee embankments are inspected headwall to headwall; pipes beneath levee embankments are inspected a minimum of 15 horizontal feet from either toe; pipes underlying T-Walls require inspection of a minimum 8 horizontal feet; and pipes underlying I-Walls require a minimum 15 horizontal feet. Discharge pipes from pump stations must be inspected between the pump discharge and the end of the discharge line at the headwall or gate well. Inspection documentation must include comprehensive details on pipe characteristics, defect measurements with clock position notation, structural condition, joint integrity, service defects such as roots and infiltration, construction features, and any segments where complete inspection could not be obtained. The guidance emphasizes that heavily corroded or structurally damaged culverts are unsafe to enter and inspection frequency is established on a five-year cycle, with either visual or CCTV television camera methods acceptable.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX B

GUIDANCE FOR VISUAL INSPECTION

PIPES PENETRATING LEVEES (DRAFT)

US ARMY CORPS OF ENGINEERS

FEBRUARY 2018

GUIDANCE FOR VISUAL INSPECTION

PIPES PENETRATING LEVEES

FEBRUARY 2013

SECTION 1 - BACKGROUND

Inspection of the interior of gravity pipes that penetrate under or through flood protection systems, discharge pipes from pump stations, and other third-party high-pressure pipelines (e.g., water distribution lines, petroleum product transmission lines) is necessary during pipe condition evaluation.

This assists in developing an understanding of the need to replace or rehabilitate a pipe, and selecting appropriate and economical solutions for deteriorated pipes. Pipes are also inspected after replacement or rehabilitation to document the new baseline condition for the pipe.

The current inspection checklist allows for either visual or television camera video-taping (CCTV) with a report of the findings provided to USACE on a 5 year frequency. When the visual method is employed, pipes shall be inspected using the methods described in this guidance.

Entry/walking-through a pipe should only be done when size (diameter) permits, it is safe to do so, and only when appropriate confined space entry procedures are followed. Examples of unsafe conditions include the potential for fire and explosion, heat stress, asphyxiation, drowning, and engulfment or entrapment. It should also be noted that a heavily corroded or structurally damaged culvert could collapse at any time and is not safe to enter.

Third-party high-pressure pipelines are regulated by other agencies and USACE recognizes those inspection methods as appropriate on a case-by-case basis.

SECTION 2 – GRAVITY PIPES AND PUMP STATION DISCHARGE PIPES

VISUAL INSPECTION PROCEDURES

Pipe inspections are most efficient when planned and executed so that fieldwork is performed during periods of low or no flow in the pipe. Removal of small roots and debris is required prior to inspection.

All debris shall be removed from the sewer system and properly disposed of with no debris passing downstream.

The process described below includes the minimum requirements for entry/walk-through inspections and documentation.

Inspector qualification Individuals carrying out inspection of pipes should be working under the direction or, or be qualified as, a registered professional engineer. Inspectors shall be knowledgeable about pipe design and construction, potential pipe defects, modes of failure and pipe joint details. The inspector shall also be familiar with project-specific plans, issues and history. All inspectors utilizing the entry/walk-through method of inspection shall work under the highest standard of safety.

Equipment The following equipment is required for entry/walk-through pipe inspection:

All appropriate permits (if applicable), air monitoring, communication, and rescue equipment required for safe entry

Bright, high intensity light source, preferably capable of controlling the intensity to provide visual clarity of defects

Camera to document all defects with digital video and/or still photos

Method for determining the distance from the entry point (headwall, manhole or sluice gate) to the nearest 0.1 foot for accurate location of defects within the pipe.

Limits of visual inspection

Within Levee Embankment Sections. Pipes penetrating the levee embankment cross section are inspected from headwall to headwall.

Beneath Levee Embankment Sections. Pipes underlying levee embankments which do not daylight at the levee toes are inspected a minimum distance of 15 horizontal feet as measured perpendicular from either toe;

however, the inspection continues to the riverside headwall if the pipe does not daylight within the 15 horizontal feet.

T-Wall Sections. Pipes underlying T-Walls are inspected a minimum distance of 8 horizontal feet as measured perpendicular from either side of the base; however, the inspection continues to the riverside headwall if the pipe does not daylight within the 8 horizontal feet.

I-Wall Sections. Pipes underlying I-Walls are inspected a minimum distance of 15 horizontal feet as measured perpendicular from either face of the wall; however, the inspection continues to the riverside headwall if the pipe does not daylight within the 15 horizontal feet.

Discharge Pipes from Pump Stations. Discharge pipes from the pump stations are inspected between the pump discharge and the end of the discharge line at the headwall/gate well. If the discharge pipe ends in a gate well, inspection from the gate well to the headwall at the river is required. In this case, pipe access may be possible through an air vent and a push camera with adequate lighting may be used.

Inspection documentation Pipe inspection documentation shall be accomplished by including, as a minimum, the following written information in a bound report for submittal to USACE within two (2) weeks of the field inspection:

a. Inspection details Date of inspection

Inspector name Nearest as-built station number to the pipe that is being inspected Manhole depth (invert to top of casting to nearest 0.1 ft) Segment length (from inside wall of adjacent manholes to nearest 0.1 ft) Description of purpose for the pipe Type of pipe (material, diameter, shape, segment length) Inspection method Inner diameter of pipe

b. Defect details Clock position of defect relative to the position of the hour hand of a clock Distance from reference end of pipe Defect measurements to establish height, width, depth, if possible Picture of each defect Structural condition and deformation of the pipe walls Cracked, fractured, torn, displaced or offset joints Holes or perforations, as well as movement of soil through voids Deviations from horizontal or vertical alignment Cracking, flaking (scaling), erosion, or exposed reinforcing steel or concrete pipe Corrosion, rusting, flaking, or delamination of steel pipe Condition of joints and pipe walls Cracking of clay, fiberglass, or plastic pipe Standing water/sag conditions

c. Service defects and features Roots Infiltration/exfiltration Encrustation (accumulation of sand, silt or other material in the pipe as described by loss of cross-sectional area)

Debris/sedimentation Obstruction (large object creating loss of cross-section) Fluctuations in water level

d. Construction features and defects Size, location and condition of pipe laterals or defects w/ clock position

Defective, intruding, or recessed connections

Defective junctions

If inspection of an entire sewer segment cannot be completed due to a collapse, excessive deformation, debris, intruding connections, obstructions or large displaced joints, move equipment to the downstream manhole/headwall and attempt inspection in the upstream direction.

Advise the Owner’s Representative on a daily basis if the complete sewer segment cannot be inspected.

Track all locations where a complete inspection is not obtained and clearly document the length of sewer not inspected, location, segment, distance from adjacent manholes, etc.