Technical Specifications for Levee Inspection
This document is a technical specification for the Scranton Levee Storm Pipe Inspection project prepared for the City of Scranton, Pennsylvania, by Reilly Associates. The project consists of closed-circuit television (CCTV) inspection and documentation of City of Scranton-owned stormwater pipes penetrating through or beneath the Lackawanna River flood protection levee system. The scope includes inspection of pipe penetrations using CCTV as the primary inspection method, with sonar or alternate methods only where required by field conditions or USACE requirements; human entry or walk-through visual inspection is prohibited unless specifically authorized by the Owner and Engineer. The contractor must furnish all labor, supervision, equipment, materials, tools, transportation, access equipment, traffic control, and incidentals necessary to complete the work, including coordination with the Owner, Engineer, applicable property owners, utility owners, and governmental agencies. Pipe sizes range from approximately 12 inches through 60 inches in diameter. Sealed bids are due by 10:00 a.m. on Thursday, December 3, 2026, to the City of Scranton via the City's e-Procurement Portal, with bid opening occurring in City Council Chambers. The contract requires completion of all work within timeframes specified in the Form of Agreement, with a Final Inspection Report due within 21 calendar days following completion of field inspection activities.
This is a unit price contract with actual quantities of work performed at the sole discretion of the Owner. The contractor must provide unit prices for CCTV inspection classified by nominal pipe diameter ranges: 12-inch to 15-inch, 18-inch, 24-inch, 30-inch to 36-inch, 42-inch to 48-inch, and 60-inch pipes, measured in linear feet of completed and accepted inspection. Add Alternate No. 1 addresses Storm Infrastructure Cleaning with similar pipe diameter classifications, to be performed only where sediment, debris, roots, deposits, or obstructions prevent or materially interfere with CCTV inspection and when specifically authorized by the Engineer. The contractor is responsible for all mobilization, demobilization, flow control, traffic control, debris handling and disposal, protection of existing facilities, and restoration costs, which are included in the applicable unit prices. A separate Lump Sum payment item covers preparation and submission of the Final Inspection Report and project-wide deliverables. The contractor must obtain insurance and bonding consistent with requirements in the Instruction to Bidders and must comply with all applicable OSHA requirements, including those governing confined space entry. No separate payment will be made for work performed without prior authorization, work exceeding authorized limits, or duplicate or overlapping work.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
LEVEE INSPECTION
City of Scranton
Lackawanna County, Pennsylvania
October 2026
Prepared for:
City of Scranton
340 N. Washington Ave
Scranton, PA 18503
Prepared By:
Reilly Associated
49 South Main Street, Suite 200
Pittston, PA 18640
(570) 654-2473
RA # 22010.62
Table of Contents
Page 00010-1 of 00010-1
SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 1 – GENERAL REQUIREMENTS
01000 Summary of Work 01000-1 to 01000-5
01270 Unit Prices 01270-1 to 01271-2
01300 Submittals 01300-1 to 01300-6
01570 Maintenance and Protection of Traffic 01570-1 to 01570-6
DIVISION 33 – SITE UTILITIES
33100 Storm Infrastructure Cleaning 33100-1 to 33100-8
33200 CCTC Inspection of Storm Lines 33200-1 to 33200-12
APPENDICES
Appendix A – USACE Guidance for CCTV and Sonar Inspection of Pipes Penetrating Levees
Appendix B – USACE Guidance for Visual Inspection of Pipes Penetrating Levees
Appendix C – USACE Guidelines for Human/Visual Inspection of Conduits
Appendix D – USACE Guidelines for Video Inspection of Conduits
Appendix E – USACE Conduits, Pipes, and Culverts Associated with Dams and Levee Systems
Engineering Manual
Appendix F – City-Owned Stormwater Pipe Penetration Inventory
SUMMARY OF WORK 01010-1
SECTION 01010 – SUMMARY OF WORK
PART 1: GENERAL
1.01 CONTRACTOR SERVICES
Single Prime
The Owner will let a single prime Contract for all Work as described in the Project Drawings, Specifications, Contract Documents, and referenced United States Army Corps of Engineers
(USACE) inspection guidance. The Contractor shall be fully responsible for coordination of all subcontractor work.
The descriptions below are general summaries of the major Work tasks and shall in no way limit or reduce the Work required by the Contract Documents. Contractor shall furnish all labor, supervision, equipment, materials, tools, transportation, access equipment, traffic control, and incidentals necessary to complete the Work.
Levee Pipe Penetration Inspection
The Work generally consists of inspection and documentation of City of Scranton-owned stormwater pipes penetrating through or beneath the Lackawanna River flood protection levee system.
The Work shall include inspection of the pipe penetrations identified on the Project Drawings and in the Contract Documents utilizing CCTV inspection as the primary inspection method. Sonar or another alternate inspection method shall be utilized only where required by field conditions, applicable USACE requirements, or as specifically authorized in writing by the Engineer. Human-entry or walk-through visual inspection shall not be utilized unless specifically authorized in writing by the Owner and Engineer.
The Work shall include all necessary coordination, access, equipment setup, inspection, documentation, photographs, videos, condition assessment, reporting, traffic control, and restoration necessary to complete the required inspections.
Where cleaning, removal of debris, flow control, dewatering, or other preparatory work is necessary to complete an inspection, such Work shall be performed only as required by the Contract
Documents or as authorized by the Owner or Engineer.
Coordination of Work
The Contractor shall coordinate all Work with the Owner, Engineer, applicable property owners, utility owners, governmental agencies, and other parties as necessary.
The Contractor shall notify the Engineer immediately if field conditions differ from the Contract
Documents, if an identified pipe cannot be located or accessed, if an inspection cannot be completed, or if an unidentified pipe or conduit penetrating the levee is encountered.
SUMMARY OF WORK 01010-2
1.02 DEFINITIONS
Contractor – the individual, contracted by the Owner and responsible for the performance of the work. The Owner will let one contract for all work.
Engineer – Reilly Associates.
Owner – City of Scranton.
Pipe Penetration – A stormwater pipe, conduit, culvert, or similar facility passing through or beneath the flood protection levee system and identified in the Contract Documents for inspection.
Project Drawings – Selected historical U.S. Army Corps of Engineers record drawings and other drawings annotated by the Engineer to identify City of Scranton-owned stormwater facilities included in the Work.
Stormwater Facilities – City of Scranton-owned stormwater pipes, conduits, structures, and associated appurtenances included in the Work.
1.03 SCOPE OF WORK
The Project consists of inspection and documentation of City of Scranton-owned stormwater pipe penetrations associated with the Lackawanna River flood protection levee system.
The purpose of the Project is to document the existing condition of the identified pipe penetrations and provide inspection records suitable for use by the City of Scranton, Engineer, and United States
Army Corps of Engineers in evaluating the condition of the facilities and determining future maintenance or repair needs.
The locations, approximate sizes, materials, configurations, and other available information pertaining to the pipe penetrations are shown on the Project Drawings and/or included in the
Contract Documents. This information is based upon historical record drawings, available records, and field investigations and shall be considered approximate unless specifically indicated otherwise.
The Project Drawings may depict stormwater, sanitary sewer, combined sewer, water, and other utility facilities. Only City of Scranton-owned stormwater facilities specifically identified in the
Contract Documents as being included in the Work shall be inspected under the Base Bid unless otherwise authorized in writing by the Owner or Engineer.
The Contractor shall perform the required inspections in accordance with the Contract Documents and applicable USACE inspection requirements and shall provide complete inspection records, videos, photographs, condition documentation, and reports for each pipe penetration inspected.
Where an identified pipe cannot be fully inspected due to obstruction, flow conditions, accessibility, pipe condition, or other field conditions, the Contractor shall document the condition encountered and immediately notify the Engineer before proceeding with additional work.
Work shall be completed within the time requirements specified in Section 00520 – Form of
Agreement.
SUMMARY OF WORK 01010-3
Work shall be completed within the time requirements shown on the Form of Agreement Section
00520.
This is a unit price contract with the amount of work performed at the sole discretion of the Owner.
1.04 CONTRACTOR INSURANCE & BONDING REQUIREMENTS
The Contractor shall submit written evidence that it has obtained insurance no less than ten (10) days after receiving the Notice of Award. Contractor’s insurance and bonding shall be consistent with the requirements listed in Section 00200 Instruction to Bidders, Article 20.
1.05 CONFINED SPACES
Certain pipes, manholes, structures, and other facilities associated with the Work may constitute permit-required confined spaces. Contractor shall be solely responsible for determining whether confined-space entry is required and for providing all supervision, personnel, equipment, testing, ventilation, retrieval systems, permits, procedures, and other measures necessary to comply with applicable OSHA requirements.
Owner and Engineer shall not be responsible for Contractor's confined-space entry means, methods, procedures, or safety program. Human entry into any pipe, conduit, manhole, or structure shall not be performed unless permitted by the Contract Documents and performed in full compliance with applicable Laws and Regulations.
1.06 EXISTING INFORMATION AND RECORD DRAWINGS
Historical USACE record drawings and other available existing-condition information are included in or referenced by the Contract Documents. Selected historical drawings have been annotated by the
Engineer to identify City of Scranton-owned stormwater pipe penetrations included in the Work.
Historical drawings and records may depict facilities that are not owned by the City of Scranton and are not included in this Contract. Existing locations, dimensions, materials, elevations, configurations, ownership information, and accessibility shown on historical drawings shall be considered approximate and shall be verified by the Contractor as necessary to perform the Work.
The Contractor shall promptly notify the Engineer of discrepancies between the Contract Documents and actual field conditions.
1.07 REFERENCE INFORMATION
a. Existing drawings, inventories, photographs, inspection records, and other reference information furnished by the Owner or Engineer are provided for the Contractor's information and are not represented to be complete or to depict current field conditions.
Contractor shall make its own examination of the Site and shall consider observable conditions affecting performance of the Work when preparing its Bid and planning its operations.
SUMMARY OF WORK 01010-4
1.08 MISCELLANEOUS SITE REQUIREMENTS
A. Contractor shall coordinate its daily inspection activities with the Owner and Engineer and shall provide reasonable advance notice of the locations proposed for inspection.
B. Contractor shall maintain access to existing properties, roadways, levee facilities, utility facilities, and other active areas throughout performance of the Work.
C. Contractor shall provide maintenance and protection of traffic where Work affects vehicular or pedestrian traffic. Refer to Section 01570 – Maintenance and Protection of Traffic.
D. Contractor shall not operate valves, gates, pumps, or other facilities owned by the City, Pennsylvania American Water, or other utility owners without prior authorization from the applicable facility owner.
E. Contractor shall protect the levee, flood protection facilities, utilities, structures, pavement, vegetation, and other existing improvements from damage resulting from its operations.
F. Areas disturbed by Contractor's operations shall be restored to a condition equal to or better than the condition existing prior to the Work.
G. No excavation, alteration of the levee, removal of flood protection features, or other intrusive work shall be performed unless specifically shown in the Contract Documents or authorized in writing by the Owner and Engineer.
PART 2: PRODUCTS
Not Used
PART 3: EXECUTION
3.01 GENERAL REQUIREMENTS
1. Contractor shall examine each inspection location and verify access and observable existing conditions prior to beginning inspection activities.
2. Contractor shall perform inspections utilizing the equipment and methods required by the
Contract Documents and applicable USACE requirements.
3. Contractor shall provide all equipment, power, lighting, cameras, sonar equipment, access equipment, vehicles, traffic control devices, communications equipment, and other equipment necessary to complete the Work.
4. Contractor shall perform each inspection for the full accessible length of the pipe penetration unless conditions prevent completion of the inspection.
5. If an inspection cannot be completed due to debris, obstruction, excessive flow, structural condition, access limitations, or other conditions, Contractor shall stop Work at that location as necessary and notify the Engineer. Contractor shall document the condition preventing completion of the inspection.
6. Contractor shall not perform cleaning, obstruction removal, excavation, dewatering, bypass pumping, human entry, or other additional work beyond that included in the Contract
Documents without prior authorization from the Owner or Engineer.
7. Contractor shall document existing damage observed prior to beginning Work at each location when such damage could reasonably be affected by Contractor's operations.
8. Contractor shall be responsible for damage to existing facilities caused by its operations.
SUMMARY OF WORK 01010-5
9. Contractor shall install, maintain, relocate, and remove traffic-control devices as necessary for performance of the Work. Refer to Section 01570 – Maintenance and Protection of
Traffic.
10. Contractor shall comply with all applicable safety requirements, including OSHA requirements governing confined spaces where applicable.
11. Inspection videos, photographs, logs, observations, and other field documentation shall clearly identify the corresponding pipe penetration identification number shown in the
Contract Documents.
12. Detailed equipment, inspection, documentation, and reporting requirements are specified in the applicable Technical Specifications and USACE guidance included with the Contract
Documents.
3.02 REPORTING REQUIREMENTS
a. Contractor shall provide complete written and electronic documentation of all inspection Work in accordance with the Contract Documents.
Inspection documentation shall be organized by the unique pipe penetration identification number shown on the Project Drawings and shall include, as applicable, inspection reports, field logs, condition observations, photographs, videos, defect documentation, inspection limits, identification of portions that could not be inspected, and other information required by the Technical Specifications and applicable USACE inspection requirements.
Contractor shall submit draft inspection documentation to the Owner and Engineer for review and shall address review comments prior to submission of the final inspection records. Final electronic files shall be clearly named, indexed, and organized to permit direct correlation between each pipe penetration shown on the
Project Drawings and its corresponding inspection documentation.
3.03 BID REQUIREMENTS
All Bids shall be submitted in accordance the following:
1. Section 00200 Instruction to Bidders
The successful Bidder will be submitted in accordance with Section 00200 Instruction to
Bidders. It also states the method of selecting the Successful Bidder.
2. Bid Form – Pricing, also referred to in this project manual as the Bid Form
Bidder shall complete the Bid Form on the PennBid website.
a. Unit Price Work: Unit prices shall be provided in the Bid Form. Payments to the
Contractor for unit price work will be based on actual quantities experienced in the field. The Contractor shall not exceed the estimated quantities without prior approval. The contractor shall promptly report to the engineer should there be discovered a difference between the estimated and proposed work as soon as it is discovered by the contractor.
3. Bid Form – Questions (RFI), also referred to in this project manual as the Bid RFI.
Bidder shall complete the Bid RFI on the Electronic website.
SUMMARY OF WORK 01010-6
4. Sections 00400 Series of the project manual
Sections 00430 through 00472 of the project manual shall be completed and uploaded to the
PennBid website.
3.04 SCHEDULE OF WORK
Prior to commencement of field activities, the Successful Bidder shall submit a proposed Schedule of Work identifying anticipated mobilization, inspection sequence, inspection dates, and final report submission date. The Schedule shall demonstrate completion of all Work within the Contract Times specified in Section 00520 – Form of Agreement.
Contractor shall coordinate modifications to the inspection sequence or schedule with the Owner and
Engineer when required by access restrictions, weather, river conditions, traffic, utility operations, or other field conditions.
END OF SECTION
UNIT PRICES 01270-1
SECTION 01270 – UNIT PRICES
1.01 DEFINITIONS
A. Unit Price is an amount proposed by Bidders, stated on the Bid Form, as a price per unit of measurement for each separately identified item of Unit Price Work. The Contract Price for Unit
Price Work will be based upon the actual quantities of authorized Work performed and accepted, subject to the requirements of the Contract Documents.
1.02 PROCEDURES
A. Unit Prices shall include all Work, labor, supervision, equipment, materials, testing, transportation, insurance, overhead, profit, applicable taxes, and all other costs necessary to complete the applicable item of Unit Price Work in accordance with the Contract Documents.
Unless a required item of Work is separately identified on the Bid Form as an item of Unit Price
Work or other separate Pay Item, it will not be paid for separately and shall be included in the applicable Unit Price as incidental.
B. Work, materials, equipment, and incidentals not specifically described in the Drawings or
Specifications but reasonably necessary to complete the applicable item of Unit Price Work shall be included in the Unit Price as incidental.
C. Work required by the Contract Terms and Conditions, including but not limited to the General
Conditions of the Construction Contract, Supplementary Conditions, Additional State, Federal or
Funding Agency Requirements, permits, safety requirements, coordination, traffic control, mobilization, and other general Project requirements may not be assignable in whole or in part to any particular item of Unit Price Work but shall be considered part of the entire Work. Payment for such Work shall be included proportionally in the applicable Bid prices unless specifically identified for separate payment.
D. Work required by the individual Specification Sections and associated with an item of Unit
Price Work, but not separately identified on the Bid Form as a Pay Item, shall be included in the applicable Unit Price as incidental.
E. The cost of Work noted or specified as included in or incidental to an item of Unit Price Work separately identified on the Bid Form shall be included in the applicable Unit Price. No separate payment will be made for such Work even where another Specification Section describes the
Work in greater detail.
For example, the Unit Price for CCTV inspection shall include the field labor, CCTV equipment, normal mobilization and remobilization, field inspection documentation, PACP coding, video
UNIT PRICES 01270-2
files, still photographs, normal flow-control measures, traffic control, and other incidental Work identified in Section 33200, except Work specifically identified as a separate Pay Item.
Similarly, where Add Alternate No. 1 is accepted, the Unit Price for Storm Infrastructure
Cleaning shall include the labor, equipment, mobilization and demobilization, water, vacuum equipment, debris handling and disposal, traffic control, and other incidental Work identified in
Section 33100, except Work specifically identified as a separate Pay Item.
F. No payment will be made for the correction, replacement, repetition, or removal of defective or unacceptable Work.
G. No payment will be made for Work in excess of that indicated, shown, specified, or authorized unless such additional Work is ordered or authorized by Owner in accordance with the Contract Documents.
H. Work, material, equipment, or labor measured and paid under one item of Unit Price Work will not be measured or paid again under another item of Unit Price Work.
I. Estimated quantities shown on the Bid Form are provided for bidding and evaluation purposes and are not a guarantee of the actual quantities of Work that will be required. Actual quantities may increase or decrease in accordance with field conditions and the requirements of the
Contract Documents.
J. Contractor shall promptly notify Engineer when actual field conditions indicate that the quantity or classification of Unit Price Work may differ substantially from the estimated quantity shown on the Bid Form. Contractor shall not perform Work beyond authorized limits solely for the purpose of increasing payable quantities.
1.03 MEASUREMENT AND PAYMENT
A. Measurement and Payment: Refer to the individual Specification Sections for Work requiring establishment of Unit Prices. Methods of measurement and payment are specified in those Sections.
1. Section 33100 – Storm Infrastructure Cleaning.
2. Section 33200 – CCTV Inspection of Levee Storm Lines.
B. Determinations of the actual quantities and classifications of Unit Price Work performed by
Contractor will be made by Engineer, subject to the provisions of the General Conditions of the
Construction Contract as modified by the Supplementary Conditions.
C. Unless otherwise specified in the applicable Measurement and Payment provisions, quantities shall be determined from actual field measurements of completed and accepted Work.
D. Linear-foot quantities for CCTV inspection shall be measured in accordance with Section
33200 based upon the actual length successfully inspected and accepted by Engineer.
UNIT PRICES 01270-3
E. Where Add Alternate No. 1 is accepted, linear-foot quantities for Storm Infrastructure
Cleaning shall be measured in accordance with Section 33100 based upon the actual length of pipe cleaning authorized, completed, and accepted by Engineer.
F. No measurement or payment will be made for duplicate or overlapping Work. Where a pipe is inspected from opposite directions, overlapping CCTV footage shall not be measured or paid twice.
G. No measurement or payment will be made for Work performed outside the authorized limits or for Work that does not comply with the Contract Documents.
H. Unit Price Work shall be classified according to the applicable pipe-diameter ranges and Pay
Items identified on the Bid Form.
PART 2: PRODUCTS
Not Used.
PART 3: EXECUTION
Not Used.
SUBMITTALS 01300-1
SECTION 01300 – SUBMITTALS
PART 1: GENERAL
1.01 BEFORE STARTING WORK
A. Record of Existing Conditions: Prior to beginning field activities, Contractor shall document existing conditions at locations where Contractor's operations could reasonably affect existing facilities or property.
1. Documentation shall include photographs, as applicable, of pipe access locations, manholes, headwalls, gate structures, levee features, pavement, curbing, landscaping, fencing, visible utilities, and other features that could be affected by Contractor's equipment or operations.
2. Photographs shall clearly identify existing deterioration, damage, or other conditions that could later be attributed to Contractor's operations.
3. Contractor shall submit photographs to Engineer when requested and shall maintain the original documentation for the duration of the Project.
4. Extensive preconstruction photography of areas not affected by Contractor's operations is not required.
1.02 PROPOSED ADJUSTMENTS IN THE PROGRESS SCHEDULE
A. If, in the opinion of Engineer, Contractor falls behind the Progress Schedule, Contractor shall submit to Engineer for acceptance proposed adjustments in the Progress Schedule that will not result in changing the Contract Times in accordance with the General Conditions and as follows:
1. Adjustments shall include such steps as necessary to improve progress. Engineer may require Contractor to adjust the sequence of Work, increase personnel or equipment, or utilize additional working hours, all without additional cost to Owner, provided such adjustments are consistent with the Contract Documents.
2. Contractor shall account for anticipated limitations associated with weather, rainfall, stormwater flow, river conditions, access, and other conditions affecting the scheduling of CCTV inspection and cleaning operations.
3. Adjustments to the Work sequence may be required so inspections can be performed during suitable low-flow conditions.
1.03 SHOP DRAWINGS, PRODUCT DATA, AND OTHER SUBMITTALS
A. Contractor shall submit Shop Drawings, Product Data, equipment information, qualifications, proposed procedures, and other submittals to Engineer for review in accordance with the General
Conditions and the individual Specification Sections.
B. Each submittal shall clearly identify:
SUBMITTALS 01300-2
1. Project name.
2. Contractor's name.
3. Applicable Specification Section.
4. Applicable equipment, procedure, or Work activity.
5. Manufacturer and model number, where applicable.
6. Deviations, if any, from the requirements of the Contract Documents.
C. Electronic submittals in PDF format are acceptable unless otherwise required by the Contract
Documents. Drawings, schedules, brochures, certifications, equipment data, and other information shall be legible and complete.
D. Contractor shall review and approve each submittal prior to submission to Engineer and shall verify that the submittal is complete and complies with the requirements of the Contract
Documents.
E. Submittals may include, but are not limited to, the following:
1. CCTV inspection equipment information.
2. Camera system specifications and capabilities.
3. Camera pan, tilt, zoom, lighting, and recording capabilities.
4. Distance-measurement system information.
5. Proposed electronic video and photograph formats.
6. Proposed file-naming and data-organization procedures.
7. CCTV inspection firm qualifications.
8. Inspection team leader qualifications.
9. NASSCO PACP certification or other required qualification information.
10. Proposed CCTV inspection schedule and sequence.
11. Cleaning equipment information, when Add Alternate No. 1 is accepted.
12. Proposed cleaning methods and equipment when required by Section 33100.
13. Proposed alternate or specialized cleaning methods requiring Engineer approval.
14. Proposed flow-control methods where conditions require measures beyond normal inspection operations.
15. Sonar equipment and proposed procedures, if sonar inspection is subsequently authorized.
16. Traffic-control information where required by Section 01570.
17. Disposal documentation or proposed disposal information when requested by Engineer.
18. Other submittals specifically required by Sections 33100 and 33200.
F. Submittals will be returned with one of the following classifications:
a. "Approved" – There are no notations or comments on the submittal and, in Engineer's opinion, the submittal appears to generally conform to the requirements of the Contract
Documents. Contractor may proceed with the applicable Work.
SUBMITTALS 01300-3
b. "Approved as Noted" – Notations have been made on the submittal for conformance with the
Contract Documents. Contractor may proceed with the applicable Work in accordance with the notations.
c. "Not Approved" – The submittal does not meet the requirements of the Contract Documents.
Contractor shall submit information or equipment conforming to the Contract Documents.
d. "Revise and Resubmit" – The information submitted is incorrect, incomplete, or insufficient for review and a revised complete submittal is required.
G. Where a submittal indicates a departure from the requirements of the Contract Documents which Engineer determines to be a minor adjustment in the interest of Owner and which does not involve a change in Contract Price or Contract Times, Engineer may approve the submittal subject to the following:
"The modification indicated on the attached submittal is approved in the interest of the Owner and is accepted with the understanding that it does not involve any change in the Contract Price or Contract Times; that it is subject generally to all Contract stipulations and covenants; and that it is without prejudice to any and all rights of the Owner under the Contract."
H. Engineer's review of Contractor's submitted data is for general conformance with the
Drawings and Specifications and does not relieve Contractor of responsibility for complying with the detailed requirements of the Contract Documents.
Contractor remains solely responsible for:
1. Accuracy and completeness of submittals.
2. Equipment selection.
3. Means and methods.
4. Coordination of Work.
5. Equipment suitability for actual field conditions.
6. Compliance with applicable safety requirements.
7. Correction or replacement of Work or equipment that does not comply with the Contract
Documents.
Engineer review shall not constitute approval of Contractor's safety procedures, means, methods, techniques, sequences, or procedures.
1.04 CONTRACTOR'S DAILY REPORTS
A. Contractor shall prepare and submit daily reports to Engineer during field inspection or cleaning activities when requested by Engineer or the Owner's representative.
B. Daily reports shall include, as applicable:
1. Date and location of Work.
SUBMITTALS 01300-4
2. Personnel and major equipment utilized.
3. Pipe Identification Numbers worked on that day.
4. Approximate footage inspected.
5. Approximate footage cleaned, where authorized.
6. Direction of CCTV inspection.
7. Access points utilized.
8. Description of Work activities performed.
9. Existing flow and water-level conditions.
10. Weather conditions and recent rainfall affecting the Work.
11. Obstructions, debris, inaccessible locations, or other conditions encountered.
12. Pipes for which complete inspection could not be obtained.
13. Cleaning requested or authorized by Engineer.
14. Equipment problems or delays.
15. Traffic-control activities, where applicable.
16. Significant communications or directions received from Owner or Engineer.
17. Other information requested by Engineer.
C. Daily reports shall be submitted no later than the end of the next business day unless otherwise directed by Engineer.
D. Information provided in a daily report shall not constitute notice of a delay, differing condition, claim, request for additional compensation, or other notice required by the Contract
Documents. Such notice shall be submitted separately in accordance with the Contract
Documents.
1.05 PROJECT-SPECIFIC SUBMITTALS AND FINAL DELIVERABLES
A. General
Contractor shall provide all inspection, cleaning, qualification, field documentation, and final deliverable submittals required by the Contract Documents, including Sections 33100 and 33200.
Submission requirements contained in the individual Specification Sections are in addition to the general requirements of this Section.
B. Storm Infrastructure Cleaning Submittals
Where Add Alternate No. 1 is accepted, provide submittals required by Section 33100, including, as applicable:
1. Description of proposed cleaning equipment.
2. Proposed cleaning methods.
3. Information regarding specialized or alternate cleaning equipment where proposed.
4. Proposed extraordinary flow-control measures where required.
5. Documentation of conditions encountered that prevent or interfere with CCTV inspection.
SUBMITTALS 01300-5
6. Photographs or CCTV documentation supporting requests for authorized cleaning.
7. Disposal documentation when requested by Engineer.
8. Other information required by Section 33100.
Contractor shall obtain authorization from Engineer prior to performing cleaning where required by Section 33100. Approval of equipment or cleaning methods does not constitute authorization to perform cleaning at any specific pipe location.
C. CCTV Inspection Submittals
Prior to beginning CCTV inspection activities, provide the submittals required by Section 33200, including, as applicable:
1. CCTV inspection firm qualifications.
2. Inspection team leader qualifications.
3. NASSCO PACP certification or qualification information.
4. CCTV camera and inspection-system technical data.
5. Documentation of camera pan, tilt, zoom, lighting, recording, and distance-measurement capabilities.
6. Proposed inspection schedule and sequence.
7. Proposed electronic video and photograph format.
8. Proposed Pipe Identification Number and file-naming system.
9. Proposed inspection log or reporting format.
10. Other information required by Section 33200.
D. Field Inspection Documentation
Contractor shall maintain and submit field inspection documentation in accordance with Section
33200, including:
1. CCTV videos.
2. Still photographs.
3. Inspection logs.
4. PACP coding and ratings.
5. Pipe Identification Numbers.
6. Inspection direction and limits.
7. Distance measurements.
8. GPS coordinates and estimated accuracy.
9. Water-level and flow conditions.
10. Identification of obstructions and incomplete inspections.
11. Documentation of discrepancies between field conditions and the Contract Documents.
Field inspection records shall be organized so that all information can be readily correlated to the applicable Pipe Identification Number shown on the Project Drawings.
E. Final Inspection Report and Deliverables
SUBMITTALS 01300-6
Contractor shall prepare and submit the Final Inspection Report and project-wide deliverable package in accordance with Section 33200.
The Final Inspection Report and Deliverables shall include, but not necessarily be limited to:
1. Executive summary.
2. Project and inspection-method description.
3. Overall project map.
4. Updated pipe inventory or database.
5. Individual inspection information for each pipe.
6. Inspection logs.
7. PACP condition information and ratings.
8. CCTV videos.
9. Still photographs.
10. GPS information.
11. Marked Project Drawings and historical record drawings.
12. Identification of incomplete inspections.
13. Identification of discrepancies between actual field conditions and available records.
14. Electronic-file index.
15. Other information required by Section 33200 and applicable USACE inspection guidance.
Submit a draft Final Inspection Report for Owner and Engineer review. Contractor shall address review comments and submit the completed Final Report and electronic deliverable package in accordance with the Contract Documents.
PART 2: PRODUCTS
Not Used.
PART 3: EXECUTION
Not Used.
MAINTENANCE AND PROTECTION OF TRAFFIC 01570-1
SECTION 01570 – MAINTENANCE AND PROTECTION OF TRAFFIC
1.01 DESCRIPTION
This Work includes furnishing, installing, maintaining, relocating, and removing traffic-control devices required for vehicular, pedestrian, bicycle, and recreational trail traffic affected by the
Work.
The Work may include signs, cones, drums, barricades, temporary fencing, flagging, traffic directors, temporary pedestrian or bicycle routing, and other measures required to safely guide the public through or around temporary work areas.
All Work shall be performed in accordance with these Specifications, applicable PennDOT requirements, the Federal Highway Administration Manual on Uniform Traffic Control Devices
(MUTCD), applicable local requirements, the Drawings, and as directed by authorities having jurisdiction.
Contractor shall maintain safe access for the public to the greatest extent practicable during performance of the Work.
PART 2: PRODUCTS
2.01 MATERIAL
Traffic-control devices, signs, barricades, drums, cones, fencing, channelizing devices, and other materials shall conform to applicable PennDOT requirements, the MUTCD, the Contract
Documents, and requirements of authorities having jurisdiction.
Materials shall be suitable for the intended use and shall be maintained in a clean, visible, stable, and serviceable condition for the duration of their use.
PART 3: EXECUTION
3.01 GENERAL REQUIREMENTS
Traffic-control measures shall be installed, maintained, relocated, and removed as required by the Contract Documents and applicable Federal, State, and local requirements.
Contractor shall plan and sequence its operations to minimize disruption to vehicular traffic, pedestrians, bicyclists, recreational trail users, adjacent properties, and other users of the Project area.
MAINTENANCE AND PROTECTION OF TRAFFIC 01570-2
Traffic-control devices shall be installed prior to beginning Work affecting an active roadway, walkway, trail, or other public-use area and shall be removed when no longer required.
3.02 GENERAL
Contractor shall furnish and install all traffic barricades, markers, signs, lighted signs, message boards, controls, and other facilities, and provide flaggers, traffic directors, traffic police, or other personnel required by Federal, State, and local authorities or Engineer to protect the general public and maintain existing roads, streets, walkways, trails, and other public-use areas.
Contractor shall be solely and fully responsible for maintenance and protection of traffic and protection of pedestrians, bicyclists, and other members of the public. Direction or lack of direction by Owner or Engineer shall not diminish Contractor's responsibility.
Contractor shall provide traffic directors, flaggers, or other qualified personnel at locations and for periods necessary for safety or as required by applicable regulatory agencies or Engineer.
Traffic-control personnel shall be properly trained, equipped, and readily identifiable.
Traffic directors or flaggers shall be provided where Contractor's equipment is operating immediately adjacent to, entering, leaving, or crossing active vehicular or trail traffic where such control is necessary to maintain public safety.
Special attention shall be given to the protection of pedestrians, bicyclists, children, and other trail users. Ingress and egress shall be maintained for adjacent properties to the extent practicable.
Where daily traffic diversions, temporary closures, or other significant restrictions are necessary, Contractor shall provide required notifications to applicable police, fire, ambulance, emergency services, public agencies, property owners, or other affected parties.
Owner and Engineer make no warranty or representation that Contractor will be permitted to divert or barricade traffic or close a roadway or trail. Contractor shall complete the Work subject to restrictions imposed by authorities having jurisdiction.
Traffic-control details shown in the Contract Documents are general in nature. Contractor remains responsible for providing all signage, barricades, flaggers, temporary fencing, equipment, and other measures necessary for its operations.
If traffic or public-use conditions become unduly congested or unsafe, Owner or Engineer may require Contractor to modify its operations, sequence, or working hours.
3.03 VEHICULAR TRAFFIC
A. Traffic Diversion
MAINTENANCE AND PROTECTION OF TRAFFIC 01570-3
Whenever it is necessary to divert vehicular traffic from its normal travel path, the diversion shall be clearly marked using appropriate cones, drums, barricades, signs, or other approved channelizing devices.
If traffic-control devices remain in place during hours of darkness or reduced visibility, provide appropriate reflectorization, warning lights, or other required visibility measures.
B. One-Way Traffic
Whenever Contractor's operations require establishment of temporary one-way traffic, provide flaggers and traffic-control devices as required by applicable standards and authorities having jurisdiction.
C. Street Closing
Street or roadway closures shall not be implemented without prior approval from authorities having jurisdiction.
Where a closure is authorized, Contractor shall:
1. Keep the duration of the closure to the minimum necessary.
2. Provide required advance warning and detour signage.
3. Provide reasonable notice to affected properties and agencies.
4. Maintain access for police, fire, ambulance, and other emergency vehicles.
5. Maintain access to fire hydrants, valves, utility facilities, and other essential public infrastructure.
6. Restore normal traffic operations as soon as practicable following completion of the affected Work.
3.04 PEDESTRIAN AND BICYCLE TRAFFIC CONTROLS AND FENCING
Contractor shall provide highly visible barricades, channelizing devices, temporary fencing, signs, or other protective measures necessary to establish and delineate safe pedestrian and bicycle travel routes through or around Work areas.
Reset and relocate temporary controls as required by the progress and sequence of the Work.
Install and maintain signs, barricades, temporary detours, crossings, and other facilities necessary to protect pedestrians and bicyclists.
Temporary routing shall be maintained in a safe, stable, and reasonably accessible condition.
Where Contractor's operations temporarily restrict an existing walkway, trail, or access route, Contractor shall provide a safe alternate route where practicable and shall clearly identify the temporary route.
MAINTENANCE AND PROTECTION OF TRAFFIC 01570-4
No pedestrian or bicycle route shall be closed without prior coordination with Owner and approval from the applicable authority having jurisdiction.
3.05 LEVEE AND LACKAWANNA RIVER HERITAGE TRAIL ACCESS
A substantial portion of the Work may occur on, adjacent to, or be accessed from the flood-protection levee and the Lackawanna River Heritage Trail or other shared-use recreational areas.
Contractor shall conduct its operations so that use of the trail and levee by pedestrians, bicyclists, and other authorized users is maintained to the greatest extent practicable.
Contractor shall comply with the following:
1. Equipment, vehicles, hoses, cables, tools, materials, debris, signs, and other items shall not be left unattended in a manner that unnecessarily blocks, obstructs, or creates a hazard to persons walking, running, bicycling, or otherwise using the trail.
2. Contractor shall maintain a clear and safe travel path through or around the Work area whenever practicable.
3. Where equipment, vehicles, hoses, cables, or other Work must temporarily cross the trail, Contractor shall provide appropriate warning devices, barricades, temporary ramps, flaggers, spotters, or other measures necessary to permit safe passage or temporarily control trail traffic.
4. Contractor vehicles and equipment entering, leaving, or crossing the trail shall yield to trail users unless traffic is being temporarily controlled by Contractor personnel.
5. Equipment shall not be parked or stored on the trail overnight unless specifically authorized by Owner and adequate protection and warning devices are provided.
6. At the completion of each workday, the trail shall be left in a neat, stable, unobstructed, and safe condition unless an approved temporary closure remains in effect.
7. Mud, sediment, debris, or other material deposited on the trail by Contractor's operations shall be removed promptly.
8. Contractor shall not damage the trail pavement, shoulders, signs, fencing, gates, levee surface, vegetation, or associated facilities. Damage caused by Contractor shall be repaired at no additional cost to Owner.
9. Temporary closure of any portion of the trail shall be coordinated in advance with Owner and the applicable trail or property authority. Contractor shall provide signs, barricades, and temporary detour routing as required.
10. Contractor shall not restrict access to the trail or levee beyond the area and duration reasonably necessary to safely perform the Work.
3.06 TRAFFIC SIGNALS AND CONTROLS
Installation and operation of traffic signals and traffic-control devices shall conform to requirements of Federal, State, and local authorities having jurisdiction.
MAINTENANCE AND PROTECTION OF TRAFFIC 01570-5
Provide adequate barricades, warning signs, channelizing devices, guards, flaggers, and other protective measures necessary to protect persons from injury and avoid property damage during performance of the Work.
Where Contractor is permitted to close or restrict a street, road, walkway, or other public travel route, Contractor shall furnish, install, maintain, and remove all required advance warning signs, barricades, detour signs, and other traffic-control devices.
3.07 EQUIPMENT AND STORED MATERIALS
The Work area shall be left in a neat and satisfactory condition at the end of each workday.
Equipment, vehicles, hoses, cables, tools, materials, debris, and other items shall not be stored or left in traveled portions of roadways, sidewalks, trails, driveways, or other public-use areas unless specifically authorized and adequately protected.
Where equipment or materials are temporarily stored adjacent to a traveled area, provide barricades, signs, lights, reflectorized devices, fencing, or other warning measures required for the protection of vehicular, pedestrian, and bicycle traffic.
Contractor shall remove temporary equipment and materials when no longer required for the
Work.
The requirements of this Section are in addition to applicable Federal, State, and local laws, rules, regulations, ordinances, permits, and other requirements contained in the Contract
Documents.
3.08 PENNDOT HIGHWAY OCCUPANCY PERMITS (IF APPLICABLE)
Where Work is performed within a PennDOT right-of-way or under a Highway Occupancy
Permit, Contractor shall comply with applicable PennDOT requirements and the conditions of the permit.
For required revisions to a Highway Occupancy Permit or Traffic Control Plan resulting from
Contractor's proposed means, methods, sequence, or requested changes, Contractor shall be responsible for preparing required information and obtaining approval from PennDOT at no additional cost to Owner.
No additional compensation will be due for traffic-control measures, scheduling restrictions, night work, weekend or holiday work, overtime, temporary lighting, sign boards, temporary traffic signals, or similar requirements resulting from Contractor's means, methods, or applicable permit conditions unless specifically provided for elsewhere in the Contract Documents.
PART 4: MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
MAINTENANCE AND PROTECTION OF TRAFFIC 01570-6
No separate measurement or payment will be made for Maintenance and Protection of Traffic unless a separate Pay Item is specifically provided in the Bid Form.
All costs associated with traffic control, pedestrian and bicycle protection, Lackawanna River
Heritage Trail protection, flaggers, signs, barricades, temporary fencing, temporary routing, and other requirements of this Section shall be considered incidental and included in the applicable
Contract prices.
For CCTV inspection, such costs shall be included in the applicable Base Bid Unit Prices under
Section 33200.
Where Add Alternate No. 1 is accepted, traffic-control costs associated specifically with authorized cleaning operations shall be included in the applicable cleaning Unit Prices under
Section 33100.
SECTION 33100 - STORM INFRASTRUCTURE CLEANING 33100-1
SECTION 33100 – STORM INFRASTRUCTURE CLEANING
PART 1 – GENERAL
1.1 SCOPE OF WORK
A. This Section includes cleaning of City of Scranton-owned stormwater pipes and associated structures identified in the Contract Documents when cleaning is necessary to permit completion of the required CCTV inspection.
B. Storm Infrastructure Cleaning is included as Add Alternate No. 1 to the Base Bid. Work described in this Section shall become part of the Contract only if Add Alternate No. 1 is accepted by the Owner.
C. Acceptance of Add Alternate No. 1 shall establish the applicable Contract Unit Prices for cleaning but shall not constitute authorization to clean all pipes included in the Project.
D. Cleaning shall be performed only where sediment, debris, roots, deposits, obstructions, or other material prevents or materially interferes with completion of an acceptable CCTV inspection and only when specifically authorized by the Engineer.
E. Contractor shall first attempt to complete the required CCTV inspection under existing conditions where an acceptable inspection can be obtained without cleaning.
F. Where cleaning is determined by the Contractor to be necessary, Contractor shall document the condition and notify the Engineer. Contractor shall not begin cleaning until authorized by the
Engineer.
G. The intent of cleaning is to remove sufficient sediment, debris, roots, deposits, obstructions, or other material to permit an acceptable inspection of the pipe interior. Cleaning for general maintenance purposes beyond that necessary to complete the required inspection is not included unless specifically directed by the Engineer.
H. Contractor shall coordinate cleaning activities with CCTV inspection work specified in
Section 33200 – CCTV Inspection of Levee Storm Lines.
I. Contractor shall furnish all labor, supervision, equipment, water, tools, transportation, access equipment, traffic control, vacuum equipment, pumps, hoses, debris handling and disposal, and other incidentals necessary to complete authorized cleaning.
J. Cleaning shall be performed in a manner that protects the existing stormwater pipe, associated structures, levee, flood protection facilities, utilities, and adjacent property from damage.
SECTION 33100 - STORM INFRASTRUCTURE CLEANING 33100-2
K. If Add Alternate No. 1 is not accepted by the Owner, cleaning is not included in the Contract.
Where debris, sediment, roots, deposits, or other material prevents completion of an acceptable
CCTV inspection, Contractor shall document the condition and notify the Engineer. Contractor shall not perform cleaning unless subsequently authorized by an appropriate modification to the
Contract.
1.2 DEFINITIONS
A. Authorized Cleaning: Cleaning specifically approved by the Engineer for payment under
Add Alternate No. 1.
B. Cleaning: Removal of debris or other material from storm infrastructure to the extent necessary to permit completion of an acceptable CCTV inspection.
C. Debris: Sediment, silt, mud, sand, gravel, rocks, roots, vegetation, trash, deposits, loose material, concrete fragments, or other material partially or completely obstructing storm infrastructure or otherwise interfering with the required inspection.
D. Storm Infrastructure: City of Scranton-owned stormwater pipes, conduits, manholes, inlets, headwalls, gate structures, and associated appurtenances included in the Contract Documents.
1.3 REFERENCES
A. Section 01010 – Summary of Work.
B. Section 01570 – Maintenance and Protection of Traffic.
C. Section 33200 – CCTV Inspection of Levee Storm Lines.
D. Applicable United States Army Corps of Engineers inspection guidance included with the
Contract Documents.
E. Applicable Occupational Safety and Health Administration requirements.
1.4 SUBMITTALS
A. Prior to beginning cleaning operations, submit information describing proposed cleaning equipment and methods when requested by the Engineer.
B. Prior approval from the Engineer shall be obtained before utilizing cleaning methods other than conventional hydraulic cleaning, vacuum removal, rodding, or similar trenchless methods.
C. Provide disposal records, receipts, manifests, or other documentation when requested by the
Engineer.
D. Immediately notify the Engineer if cleaning operations encounter or reveal:
SECTION 33100 - STORM INFRASTRUCTURE CLEANING 33100-3
1. Collapsed or severely deteriorated pipe.
2. Significant pipe deformation.
3. Large displaced or separated joints.
4. Fresh soil or other material entering through the pipe wall or joints.
5. An obstruction that cannot reasonably be removed using trenchless cleaning methods.
6. Conditions indicating that continued cleaning could…