5-6 - Items Requested for Submission.pdf

PDF 96 KB Posted

Attached to
IFB - CANYONS SOFTBALL COMPLEX LED SPORTS LIGHTING
Solicitation number
26-260
Issued by
Washington County, Utah

About this file

This is a bid submission requirements document issued by the City of St. George, Utah, for the Canyons Softball Complex LED Sports Lighting project (Bid Inquiry #26-261). The project involves the complete installation of a new energy-efficient LED sports lighting system for seven softball fields. Bidders must submit proposals for LED fixtures for poles designated A1-A8, B1-B8, and C1-C14, with all technical specifications referenced in the 1997 plans, specifically sections 2.2 Structural Parameters and 2.3 LED Luminaire. The submission must include demolition work as described in section 1.2 of the specifications, installation services per Part 3 Execution, and a control system meeting section 2.4 requirements. All proposals must address warranty provisions outlined in sections 1.4 and 3.3 of the specifications.

Bidders are required to verify compliance with all specifications beyond the itemized list provided, as the enumerated items are for convenience only and not exhaustive. The City of St. George reserves the right to reject any or all submissions or waive any formality or technicality in the bid process in its discretion. No specific pricing terms, response deadlines, site visit requirements, bidder's conferences, award dates, or contract terms are identified in this submission requirements document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Canyons Softball Complex LED Sports Lighting

Bid Inquiry #26-261

Items Requested for Submission:

1. LED fixtures for Poles A1-A8, B1-B8, and C1-C14 (see 1997 plans, 2.2 Structural Parameters & 2.3 LED Luminaire, etc. in specifications for details)

2. Demolition (1.2 Description of work in specifications)

3. Installation (Part 3 Execution in specifications)

4. Control System (see 2.4 Control Systems in specifications)

5. Warranty (1.4 Warranty & 3.3 Warranty and Guarantee in specifications)

*Read through the specifications and verify all requirements are met. The list above is for convenience and is not all inclusive.