5-04 Vendor Analysis Form Slides.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Aquatic Amenities for Indoor Waterpark
Solicitation number
RFP-26-010
Issued by
Polk County, Texas

About this file

This is a vendor analysis form for Reeves County, Texas, evaluating proposals for the design, engineering, supply, and installation of aquatic amenities for an indoor waterpark facility in Pacos, Texas. The analysis form serves as an evaluation template to systematically assess vendor proposals against specified criteria. The project involves three primary water slide complexes with varying configurations, including a complex side-by-side inner tube slide, an open/enclosed body slide, and additional slide features, along with associated support infrastructure such as a slide tower with dispatch systems and queuing areas. Vendors must demonstrate a commissioning target date of December 2027 and provide detailed project schedules including milestones from agreement signing through testing completion and final commissioning.

The evaluation criteria encompass technical specifications for fiberglass materials, thickness, gelcoat and UV coating requirements, manufacturing processes and location, and design capabilities including BIM and CAD formats. Vendors must document experience with similarly scaled projects and provide key personnel information. The analysis form requires vendors to specify pricing components including import duties, material import taxes, VAT, material delivery to port and site, job site construction and installation, installation supervision, crew travel, and provision of necessary equipment. Additional requirements include vendor licensing in Pacos, Texas; permit acquisition; PE-stamped drawings prepared by licensed professionals in the jurisdiction; indemnification; anchor bolt testing responsibility; and laydown area specifications. The form also captures detailed ride specifications such as length, height, duration, capacity, minimum rider heights, and maximum weights for each slide feature.

View the file

Other files

File Type Posted
1-26-010 Bid Packet.pdf PDF
2-08 Vendor Analysis Form Surf Ride.xlsx XLSX spreadsheet
4-02 Vendor Analysis Form Playstructure.xlsx XLSX spreadsheet
3-06 Vendor Analysis Form Spray Features.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Reeves County Waterpark
Pacos, TX
RFP Analysis - Slides
[Date]
CriteriaAnswerLocation in ProposalNotes
[Vendor Name]
General
Proposal Valid for 120 days[Yes or No]Page #
Standard Terms and Conditions[Yes or No]Page #
Training and commissioning[Yes or No]Page #
Experience with projects of similar size.
[List Park Name & Location]
[List Park Name & Location]
[List Park Name & Location]
[List Park Name & Location]
[List Park Name & Location]
Flume Material
Fiberglass:[thickness in mm]Page #
Gelcoat:[thickness in mm]Page #
UV coating:[Yes or No]Page #
Manufacturing Process:[Type of Process]Page #
Manufacturing Location:[Country]Page #
Key Personnel
[List key personnel and title]
[List key personnel and title]
[List key personnel and title]
[List key personnel and title]
BIM Management CapabilitiesPage #
BIM Software Used
Current Version of Software
Features Supplied in BIM Format[Yes or No]
Features Provided in 3D Cad Format[Yes or No]
Proposed schedule & milestonesPage #
Sign Agreement:[Month Year]
Down Payment:[Month Year]
Owner Provides Site Information:[Month Year]
Sign-Off on Color:[Month Year]
Sign-Off on Design[Month Year]
Engineering Complete :[Month Year]
Fiberglass Pre-production Begins:[Month Year]
Fiberglass Production Begins:[Month Year]
Fiberglass on Site:[Month Year]
Construction Begins:[Month Year]
Construction Ends:[Month Year]
Testing Complete:[Month Year]
Can achieve commissioning date of December 2027[Yes or No]
Additional Project Information
Import Duty[Included or Excluded]Page #
Material Import Tax[Included or Excluded]Page #
VAT[Included or Excluded]Page #
Material Delivery to Port[Included or Excluded]Page #[Location of Port]
Material Delivery to Site[Included or Excluded]Page #
Job Site Construction and Installation[Included or Excluded]Page #
Installation Supervision[Included or Excluded]Page #
Crew travel[Included or Excluded]Page #
Provide Necessary Installation Tools and Equipment[Yes or No]Page #Lifting Equipment provided by Owner
Concrete foundation and column 0'-6" above grade[Yes or No]Page #
Colors bid as premium colors not base options[Yes or No]Page #
Air quality strategy to control the environment inside all exterior slides included[Yes or No]Page #
Licensed to do work in the City of Pacos, Texas USA[Yes or No]Page #
Slide vendor indemnify…[Yes or No]Page #
Vendor obtain permits[Yes or No]Page #
Vendor responsible - anchor bolt testing[Yes or No]Page #
Laydown area requested[In Square Meters]Page #
Vendor responsible - drawings PE in the City of Pacos, Texas USA[Yes or No]Page #
Slides Complex
Side by Side Inner Tube Slide A[Ride Name]Page #
Length:[Length ]
Drop:[Height ]
Ride Duration:[Seconds]
Minimum Rider Height:[Height]
Maximum Rider Weight:[Weight ]
Flow:[Rate ]
RFP Runout[Yes or No]
# Of Tubes Included:[# Single] [# Double]
THRC:[Hourly Ride Capacity]
Number of side by side features along slide path[#]
Special EffectsPage #
Slide A1 - Translucent Sections[Yes or No] [Number of Slide Section]
Slide A2 - Translucent Sections[Yes or No] [Number of Slide Section]
Slide A1 - Translucent Symbols[Yes or No] [Symbols Used] [Number of Slide Section Applied]
Slide A2 - Translucent Symbols[Yes or No] [Symbols Used] [Number of Slide Section Applied]
Display to indicate Winner at end of ride.[Yes or No]
Open/Enclosed Body Slide B[Feature Name]Page #
Length:[Length]
Drop:[Height]
Ride Duration:[Seconds]
Minimum Rider Height:[Height]
Maximum Rider Weight:[Weight ]
Flow:[Rate]
THRC:[Hourly Ride Capacity]
RFP Runout[Yes or No]
Special EffectsPage #
Translucent Sections[Yes or No] [Number of Slide Section]
Translucent Symbols[Yes or No] [Symbols Used] [Number of Slide Section Applied]
Open/Enclosed Body Slide C[Feature Name]Page #
Length:[Length in Meters]
Drop:[Height in Meters]
Minimum Rider Height:[Height]
Maximum Rider Weight:[Weight ]
Flow:[Rate]
THRC:[Hourly Ride Capacity]
RFP Runout[Yes or No]
Special EffectsPage #
Translucent Sections[Yes or No] [Number of Slide Section]
Translucent Symbols[Yes or No] [Symbols Used] [Number of Slide Section Applied]
Complex 03 Slide TowerPage #
Overall Tower Height :[Height ]
Platform Height (Above SWL / Runout Deck):[Height ]
Platform Height above Runout deck/SWL:[Height ]
Platform Area Required for Start Tub and Queuing:[Size ]
RFP Runout[Yes or No]
Start/Stop Intelligent Dispatch System[Yes or No]
Line of Site for Staff from Start Platform to Slide Termination:[Yes or No]
If No, is Video Observation System Included:[Yes or No]
Estimated Time to Construct Ride:[Time in Days]
Number of Staff Needed for Operation of Slide:[#]
Number of Pumps Needed for Operation:[#]
DesignPage #
Anchor Bolts, Templates for Bolt Patterns, and Embedment Plates for foundations Provided[Yes or No]
Steel Components Hot-Dipped Galvanized[Yes or No]
Steel Components Painted two coats, one (1) primer coat and one (1) colored coat of a non corrosive paint[Yes or No]
Stair Stringers Structural Fiberglass Material[Yes or No]
Fiberglass Stair Risers[Yes or No]
Treads Glulam Fiberglass with Non-Skid finish:[Yes or No]
Dedicated Standard Queuing Lane on Tower for Each Slide Type[Yes or No][# of Queuing Lanes]

image1.png

File details come from the government source that posted it. Updated .