2-08 Vendor Analysis Form Surf Ride.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Aquatic Amenities for Indoor Waterpark
- Solicitation number
- RFP-26-010
- Issued by
- Polk County, Texas
About this file
This is a vendor analysis form for Reeves County's procurement of aquatic amenities for an indoor waterpark facility in Pecos, Texas. The document serves as an evaluation template for assessing proposals related to a Double Surf Machine ride. The form requires vendors to provide comprehensive information across multiple evaluation categories, including proposal validity, standard terms and conditions, training and commissioning plans, and relevant experience with comparable projects. Key evaluation areas include proposed schedules with specific milestones spanning from agreement signature through commissioning, with a target completion date of December 2027, and detailed specifications for the surf attraction including footprint, flow rate in gallons per minute, board quantities, hourly ride capacity, and surface materials.
The analysis form addresses critical project delivery components, including responsibility for import duties, material import taxes, VAT, delivery logistics to port and site, job site construction and installation, and licensing requirements specific to Pecos, Texas. Vendors must demonstrate capabilities in BIM management, provide specifications for stainless steel construction standards, and clarify responsibility for permitting, anchor bolt testing, and professional engineer drawings. The form evaluates whether vendors can supply installation tools and equipment, provide installation supervision, and cover crew travel costs. Additionally, the evaluation framework requires vendors to specify laydown area requirements in square feet and confirm indemnification obligations, establishing a structured assessment methodology for comparing vendor proposals against standardized criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-26-010 Bid Packet.pdf | ||
| 4-02 Vendor Analysis Form Playstructure.xlsx | XLSX spreadsheet | |
| 5-04 Vendor Analysis Form Slides.xlsx | XLSX spreadsheet | |
| 3-06 Vendor Analysis Form Spray Features.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Reeves County Waterpark | |||
| Pacos, TX | |||
| RFP Analysis - Double Surf Machine | |||
| [Date] | |||
| Criteria | Answer | Location in Proposal | Notes |
| [Vendor Name] |
| General | |||
| Proposal Valid for 120 days | [Yes or No] | Page # | |
| Standard Terms and Conditions | [Yes or No] | Page # | |
| Training and commissioning | [Yes or No] | Page # |
| Experience with projects of similar size. | |
| [List Park Name & Location] | |
| [List Park Name & Location] | |
| [List Park Name & Location] | |
| [List Park Name & Location] | |
| [List Park Name & Location] |
| Key Personnel | |
| [List key personnel and title] | |
| [List key personnel and title] | |
| [List key personnel and title] | |
| [List key personnel and title] |
| BIM Management Capabilities | Page # | ||
| BIM Software Used | |||
| Current Version of Software | |||
| Features Supplied in BIM Format | [Yes or No] | ||
| Features Provided in 3D Cad Format | [Yes or No] |
| Proposed schedule & milestones | Page # | ||
| Sign Agreement: | [Month Year] | ||
| Down Payment: | [Month Year] | ||
| Owner Provides Site Information: | [Month Year] | ||
| Sign-Off on Color: | [Month Year] | ||
| Sign-Off on Design | [Month Year] | ||
| Engineering Complete : | [Month Year] | ||
| Fiberglass Pre-production Begins: | [Month Year] | ||
| Fiberglass Production Begins: | [Month Year] | ||
| Fiberglass on Site: | [Month Year] | ||
| Construction Begins: | [Month Year] | ||
| Construction Ends: | [Month Year] | ||
| Testing Complete: | [Month Year] | ||
| Can achieve commissioning date of December 2027 | [Yes or No] |
| Additional Project Information | ||||
| Import Duty | [Included or Excluded] | Page # | ||
| Material Import Tax | [Included or Excluded] | Page # | ||
| VAT | [Included or Excluded] | Page # | ||
| Material Delivery to Port | [Included or Excluded] | Page # | [Location of Port] | |
| Material Delivery to Site | [Included or Excluded] | Page # | ||
| Job Site Construction and Installation | [Included or Excluded] | Page # | ||
| Installation Supervision | [Included or Excluded] | Page # | ||
| Crew travel | [Included or Excluded] | Page # | ||
| Provide Necessary Installation Tools and Equipment | [Yes or No] | Page # | Lifting Equipment provided by Owner | |
| Licensed to do work in the City of Pacos, Texas USA | [Yes or No] | Page # | ||
| Slide vendor indemnify… | [Yes or No] | Page # | ||
| Vendor obtain permits | [Yes or No] | Page # | ||
| Vendor responsible - anchor bolt testing | [Yes or No] | Page # | ||
| Laydown area requested | [In Square Feet] | Page # | ||
| Vendor responsible - drawings PE in the City of Pacos, Texas USA | [Yes or No] | Page # |
| Surf Attraction | |||
| Double Surf Machine | [Ride Name] | Page # | |
| Footprint: | [Area] | ||
| Flow: | [Rate in GPM] | ||
| # Of Body Boards Included: | [#] | ||
| # Of Stand-up Boards Included: | [#] | ||
| THRC: | [Hourly Ride Capacity] | ||
| Includes Removable Divider: | [Yes or No] | ||
| Tensioned fabric ride surface | [Yes or No] | ||
| Surface impact rating | [#] | ||
| Main structure 304 Stainless Steel with 316 Stainless Steel Hardware | [Yes or No] |
image1.png
File details come from the government source that posted it. Updated .