Septum FFT Drawing Package.pdf.pdf
PDF 339 KB Posted
- Attached to
- Septum Cham Weld & Field Free Tube Assy
- Solicitation number
- 4-B138-Q-00576-00
- Issued by
-
Department of Energy Office of Science
About this file
This document appears to be a drawing package for the construction of a pulsed septum magnet for the Advanced Photon Source Upgrade (APS-U) Project.
The pulsed septum magnet is used to steer an injected 6 GeV electron beam into the stored beam of the Storage Ring (SR). The magnet creates a high magnetic field in the injection chamber for a short period of time while maintaining negligible field in the adjacent stored beam chamber, allowing the injected beam to merge with the stored beam with minimal impact. This drawing package is related to a federal contract opportunity with Solicitation Number 4-B138-Q-00576-00, issued by the Department of Energy Office of Science, a civilian agency. The opportunity is for the fabrication and installation of the Septum Chamber Weld and Field Free Tube Assembly required for this pulsed septum magnet system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| APPENDIX D-8-C.pdf | ||
| Septum Chamber Weldment Drawing.pdf | ||
| Appendix A-71COM-13-FEB-2023 (002).pdf | ||
| Pulsed_Septum_FFT_AD_SOW.docx | DOCX document | |
| Pulsed_Septum_Inconel_AD_SOW.docx | DOCX document | |
| APS Upgrade Project Quality Assurance.pdf | ||
| Reps Certs ANL 70A.doc | DOC document | |
| APS Upgrade Project ANL-407.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR CONSTRUCTION
FOR CONSTRUCTION
File details come from the government source that posted it. Updated .