This is a Geotechnical Engineering Report Addendum prepared by Shannon & Wilson, Inc. for HDR Engineering, Inc., addressing subsurface conditions and foundation design recommendations for the City of Ashland's 7.5 MGD Water Treatment Plant project in Ashland, Oregon. The addendum documents five geotechnical borings (B-18 through B-22) drilled between December 2019 and April 2020 to depths ranging from 21.5 to 61 feet below ground surface, utilizing mud-rotary drilling and HQ3-wireline rock coring techniques. Subsurface explorations identified four primary geotechnical units: fill materials (varying sand and clay compositions), residual soil (dense to very dense sand and clay), alluvium (gravel and sand with silt), and Mount Ashland Pluton bedrock (quartz monzodiorite ranging from extremely weak to very strong). Laboratory testing included moisture content and particle size analyses conducted per ASTM standards.
The report provides detailed foundation recommendations for multiple structures including the Operations Building wet well, Backwash Recovery Basin, clear well, Pretreatment Building, and precast culvert at Horn Creek Road. For deep embedded structures bearing on bedrock, an allowable bearing pressure of 6,000 pounds per square foot (psf) is recommended with potential 1/3 increase under seismic loading and anticipated maximum differential settlements of 0.5 inch. For shallowly founded on-grade structures with compacted crushed rock structural fill, the recommended allowable bearing pressure is 4,000 psf with estimated total settlement less than 1 inch and differential settlements less than 0.5 inches over 50 feet. The report addresses subgrade preparation requirements, including specifications for recompaction, removal of loose rock pieces, and use of controlled low strength material (CLSM) with 28-day compressive strength of 1,500 to 2,000 psi for leveling. Retaining wall recommendations include use of modular block systems such as gabion baskets or proprietary Ultrablock walls for both cut and fill applications, designed with active earth pressures and minimum traffic surcharges of 250 psf. Groundwater was not observed in installed vibrating wire piezometers; however, provisions for surface water infiltration and drainage systems with pressure relief valves are recommended for embedded structure walls.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTED TO:
HDR Engineering, Inc.
1050 SW 6th Avenue, Suite
Portland, Oregon 97204
BY:
Shannon & Wilson, Inc.
3990 Collins Way, Suite 100
Lake Oswego, OR 97035
(503) 210-4750 www.shannonwilson.com
GEOTECHNICAL ENGINEERING REPORT ADDENDUM
Ashland 7.5 MGD WTP
ASHLAND, OREGON
O
May 2020
Shannon & Wilson No: 100329
Ashland 7.5 MGD WTP Geotechnical Engineering Report Addendum
100329 May 2020
PAGE INTENTIONALLY LEFT BLANK FOR DOUBLE-SIDED PRINTING
100329 May 2020 ii
C O
N T
E N
T S
CONTENTS
1 General
1.1 Project Overview
1.2 Scope of Services
2 Site and Project Description
2.1 Site Description
2.2 Project Description
3 Subsurface Explorations
4 Laboratory Testing
5 Subsurface Conditions
5.1 Geotechnical Units
5.2 Groundwater
6 Conclusions and Recommendations
6.1 Deep Embedded Structures
6.1.1 General
6.1.2 Operations Building Wet Well
6.1.3 Backwash Recovery Basin
6.2 On-Grade Structures
6.2.1 General
6.2.2 Operations Building First Floor
6.2.3 Clear well
6.2.4 Pretreatment Building
6.3 Retaining Walls
6.3.1 General
6.3.2 Fill Walls
6.3.3 Cut Walls
6.3.4 Modular Block Wall Design Recommendations
7 Construction Considerations
DRAFT Geotechnical Engineering Report Addendum
100329 May 2020 iii
C O
N T
E N
T
Exhibits
Exhibit 6-1: Lateral Earth Pressures for Permanent Embedded Structure Walls
Exhibit 6-2: Lateral Earth Pressures for Modular Block Walls
Figures
Figure 1: Vicinity Map
Figure 2: Site and Exploration Plan
Figure 3: Subsurface Profile A-A’
Figure 4: Subsurface Profile B-B’
Figure 5: Subsurface Profile C-C’
Figure 6: Subsurface Profile D-D’
Figure 7: Subsurface Profile E-E’
Appendices
Appendix A: Field Explorations
Appendix B: Laboratory Test Results
Important Information
100329 May 2020
1 GENERAL
1.1 Project Overview
The City of Ashland (City) currently owns and operates a water treatment plant (WTP) which was constructed in Ashland Canyon in 1928. Because the WTP is surrounded by the steep walls of the canyon, it is at risk of damage from flooding, fire, and landslides. The
WTP was damaged during flood events of 1963, 1974, and 1997 when the City's water supply was disrupted. Additionally, the age of the WTP makes it extremely difficult to seismically retrofit it against the design seismic event. The City previously completed a siting study and approved a location that is less susceptible to flooding and has retained the help of HDR to assist them in designing a new WTP. Shannon & Wilson is subcontracted to provide geotechnical support to HDR for the project
1.2 Scope of Services
The purpose of our geotechnical services is to provide additional site characterization during a single mobilization to the site, prepare recommendations for the new clear well location, and prepare updated recommendations on other structures such as the clear well.
Specifically, we performed the following services:
▪ Performed a site reconnaissance to observe the drilling site, marked boring locations, called in utility locates, and prepared a field exploration plan.
▪ As part of the exploration program, we conducted three geotechnical borings to the depths of between 21.5 and 50 feet below ground surface using mud-rotary drilling and
HQ-wireline coring techniques at the proposed Treatment Plant and two borings at the proposed new cast in place culvert to depths of 51 to 61 feet.
▪ Performed laboratory testing to refine the field descriptions.
▪ Evaluate the subsurface conditions and subsoil properties.
▪ Performed an evaluation and development of shallow foundation recommendations.
▪ Determined the allowable bearing pressure and settlement of the clear well.
▪ Provided updated recommendations for on grade and deep buried structures.
2 SITE AND PROJECT DESCRIPTION
2.1 Site Description
The proposed site for the new WTP is located north of Horn Creek Road and west of
Granite Street Swim Reservoir (see Figure 1, Vicinity Map). The proposed site consists of a
100329 May 2020 former quarry and the surrounding mountainside. The quarry was used to mine weathered granite for roadway construction material. The rock removed from the quarry was used for roadway construction and met the criteria for general borrow as defined by Oregon
Standard Specifications for Construction (OSSC) 00330.12; however, the rock was not hard enough for the mined material to meet the requirements for select stone backfill (OSSC
0033.15). After mining activities were terminated at the site, the site was used as a haul site for fill material generated from a variety of construction projects across the city. The volume and nature of the fill material changed with time as material was added and removed up until the summer of 2018. The range of excavated depths, extents, and age of the fill material are unknown, but it is anticipated that excavations and uncontrolled backfilling has been ongoing for several decades with variable fill material that includes some construction debris, organic material, and soil. The Site and Exploration Plan showing the location of the proposed water treatment plant is presented in Figure 2. The revised site layout of the proposed water treatment plan was provided by HDR on January 15, 2020.
2.2 Project Description
Based on the information provided by the design team, we understand that the plant will consist of both treatment and operation structures, a backwash waste (BWW) equalization basin, a recirculation pump house, a clear well and pump house, and a power house. The
WTP facility is anticipated to have a water treating capacity of about 7.5 MGD.
The majority of the site development, including the treatment and operation structures will occur in a flat area around elevation 2285 feet that was created through the process of mining and backfilling. Figures 3 to 6 present subsurface profiles at the proposed water treatment plant site, relative to the existing site grades and geotechnical information.
Also included in the project is a new cast-in-place culvert bridging over Ashland Creek and approximately 1,500 feet of roadway between the treatment plant (assumed to be located in the fill area at the base of the slope and the intersection of Granite Street and Glenview
Road). The proposed culvert will be approximately 52 feet long with a single 40-foot span over the creek and will replace an existing smaller culvert. The culvert is planned to be of pre-cast concrete construction and will carry road traffic. Figure 7 presents the subsurface profile at the proposed new culvert location.
3 SUBSURFACE EXPLORATIONS
Five geotechnical borings, designated B-18 through B-22 were drilled near the new clear well and culvert locations to depths of between 21.5 and 61.0 feet below ground surface
(bgs) using a combination of mud rotary and HQ3-wireline rock coring techniques. Borings
Ashland 7.5 MGD WTP Geotechnical Engineering Report Addendum
100329 May 2020
B-18 through B-20 were drilled near the new clear well location between December 16 and
18, 2019. Borings B-21 and B-22 were drilled on the east and west sides of the proposed culvert on April 23, 2020. Completed borings were measured in the field and approximate locations are shown on the Site and Exploration Plan, Figure 2. A Shannon & Wilson geology staff member was present during drilling to locate the borings, log the material encountered, and collect disturbed soil samples and rock cores for laboratory testing. A detailed description of the drilling and completed boring logs are included in Appendix A, Field Explorations.
4 LABORATORY TESTING
Samples obtained during field explorations were transported to the Shannon & Wilson laboratory for further examination. Representative samples were selected for further geotechnical characterization through laboratory testing. The testing program included moisture content and particle size analyses. All testing was performed by Shannon &
Wilson in accordance with applicable ASTM International standards. Results of the laboratory tests are presented in Appendix B, Laboratory Test Results.
5 SUBSURFACE CONDITIONS
5.1 Geotechnical Units
We grouped the material encountered in our field explorations into three geotechnical units presented in our original geotechnical engineering report, and as described below. Our interpretation of the subsurface conditions is based on data from our subsurface explorations and regional geologic information from published sources. The geotechnical units are as follows:
▪ Fill: hard, Sandy Fat Clay (CH), and medium dense to very dense, Clayey Sand with
Gravel (SC); dense, Poorly Graded Sand with Clay (SP-SC); dense, Silty Sand with
Gravel (SM); dense to very dense, Poorly Graded Sand with Silt (SP-SM).
▪ Residual Soil: medium dense to dense, Clayey Sand (SC), dense to very dense, Poorly Graded Sand with Clay (SP-SC), very dense, Poorly Graded Sand with Silt (SP-SM), and very stiff, Sandy Fat Clay (CH); very dense, Silty Sand (SM)
▪ Alluvium: very dense, Poorly Graded Gravel with Sand and Silt (GP-GM); very dense, Silty Sand with Gravel (SM); and
▪ Mount Ashland Pluton: Slightly weathered to predominately decomposed, extremely weak to very strong (R0-R5), Quartz monzodiorite.
100329 May 2020
These generalized geotechnical units have been defined by their geologic and material properties and their distribution in the subsurface. Variations in subsurface conditions exist between the locations of the borings. Contacts between the units may be more gradational than shown in the boring logs presented in Appendix A.
5.2 Groundwater
Groundwater levels were not noted during drilling because the borings were drilled using mud rotary and HQ3-wireline drilling techniques. These techniques can make the depth to groundwater difficult and/or not possible to discern during drilling due to the introduction of drilling fluids into the borehole to flush the drill cuttings to the surface.
During previous explorations, Shannon & Wilson installed four vibrating wire piezometers in borings B-1, B-5, B-13, and B-15 for ongoing measurements of groundwater levels.
Groundwater readings were taken at B-1, B-13, and B-15 on December 11, 2019, and at B-5 on December 18, 2019. All groundwater readings from the VWPs from each of the borings were "dry" readings, indicating that groundwater levels were below the installed depth of the VWPs. However, it is possible that formations may contain isolated zones of perched water above the piezometer. Additionally, while no groundwater was recorded in the VWP installed in boring B-1, but it should be noted that ponding water is frequently observed at the ground surface at this location.
Groundwater levels throughout the site should be expected to vary with changes in topography and precipitation. Locally, groundwater highs typically occur in the late fall to spring and groundwater lows typically occur in the late summer and early fall.
6 CONCLUSIONS AND RECOMMENDATIONS
6.1 Deep Embedded Structures
6.1.1 General
We understand that some of the proposed structures will require deep excavations greater than 10 feet below the top of the residual soil surface and will likely require some amount of rock excavation. These deep embedded structures are described below in this section. In addition to the deep embedded portion, these structures will have shallow foundations attached on the rock surface. For these shallow foundations, the existing fill under the shallow foundation zone of influence will need to be removed and replaced with structural fill. The zone of influence is defined as a slope line extending away from the outer most edge of the shallow foundations at a downward slope of 0.5 Horizontal:1 Vertical (0.5H:1V).
100329 May 2020
Based on the recommendations provided in the Final GER, temporary excavations or cuts into the underlying rock should be sloped at 1H:1V for plane shear failure modes and
0.5H:1V for wedge failure modes. Where permanent rock cuts cannot be sloped back at a
1H:1V, or temporary cut slopes cannot be cut back at a 0.5H:1V, retaining wall support will be required to maintain the stability of the rock face. Discussions related to construction of a rock dowel wall was provided previously in Section 8.3 of the Final GER. During construction, rock cuts and excavations should be observed by a qualified engineer or geologist and rock dowels should be placed in locations where adverse jointing patterns are observed to prevent rock blocks from failing.
Based on our understanding of the subsurface condition, it is possible that the excavation could encounter surfaces of fractured, weathered, or sound (non-rippable) bedrock resulting in an excavation surface that is uneven and may possibly contain loose rock pieces at the subgrade elevation. A discussion regarding the rippability of the rock was presented in
Section 8.2 of the Final GER.
We recommend that this subgrade surface either be recompacted, loose pieces or unsatisfactory material be removed, or the material be grouted in-place; however, whichever method is chosen, the final subgrade should be in a firm and unyielding condition without voids. In addition, if cobbles, boulders, or portions of the sound rock layer extends vertically beyond a specified grade elevation, the protruding material should be removed to eliminate any “hard” spots in the subgrade. The maximum tolerance of a particle above specific subgrade should not be more than 2 inches.
If removal causes a hole or depression in the subgrade, these holes should be filled with either crushed rock, controlled low strength material (CLSM) or lean concrete to create a relatively uniform foundation support subgrade. Lean concrete or CLSM used for this purpose should have a 28-day compressive strength in the range of 1,500 to 2,000 pounds per square inch. A representative of the Geotechnical Engineer of Record should determine the depth of removal and appropriate material for filling and leveling. For recompaction, due to the likely oversized nature of the material, a procedural compaction/proof rolling method should be utilized with specified and approved compaction equipment. We recommend that a minimum of two passes be performed in the vibratory mode and two passes be performed in the static mode. If crushed rock is used for a leveling course, then we recommend that the crushed rock be a minimum of 12-inches thick.
Based on the boring logs and rock core photos, we anticipate portions of the excavated subgrade will be loose or fractured, which should be treated as described above. However, if pieces or blocks of rock are too large to be feasibly over-excavated, a stabilizing option
GALVARAD
Highlight If removal causes a hole or depression in the subgrade, these holes should be filled with either crushed rock, controlled low strength material (CLSM) or lean concrete to create a relatively uniform foundation support subgrade. Lean concrete or CLSM used for this purpose should have a 28-day compressive strength in the range of 1,500 to 2,000 pounds per square inch. A representative of the Geotechnical Engineer of Record should determine the depth of removal and appropriate material for filling and leveling. For recompaction, due to the likely oversized nature of the material, a procedural compaction/proof rolling method should be utilized with specified and approved compaction equipment. We recommend that a minimum of two passes be performed in the vibratory mode and two passes be performed in the static mode. If crushed rock is used for a leveling course, then we recommend that the crushed rock be a minimum of 12-inches thick.
GALVARAD
Highlight Based on our understanding of the subsurface condition, it is possible that the excavation could encounter surfaces of fractured, weathered, or sound (non-rippable) bedrock resulting in an excavation surface that is uneven and may possibly contain loose rock pieces at the subgrade elevation. A discussion regarding the rippability of the rock was presented in Section 8.2 of the Final GER.
We recommend that this subgrade surface either be recompacted, loose pieces or unsatisfactory material be removed, or the material be grouted in-place; however, whichever method is chosen, the final subgrade should be in a firm and unyielding condition without voids. In addition, if cobbles, boulders, or portions of the sound rock layer extends vertically beyond a specified grade elevation, the protruding material should be removed to eliminate any “hard” spots in the subgrade. The maximum tolerance of a particle above specific subgrade should not be more than 2 inches.
100329 May 2020 would be placement of a thin cement slurry grout layer, such as 1 to 2 inches thick, on the fractured rock surface to allow slurry infiltration to “lock up” the rock pieces.
For deep embedded structures bearing on the underlying bedrock, we recommend an allowable bearing pressure of 6,000 pounds per square foot (psf). The bearing capacity may be increased by 1/3 under seismic loading. The maximum differential settlements on opposite sides of the structures is anticipated to be less than 0.5 inch.
6.1.2 Operations Building Wet Well
Based on our understanding, the operations building will include both an on-grade portion and a wet well that will be embedded beneath the ground surface. The on-grade portion will have a first-floor finish floor elevation of 2285 feet and the wet well will have a finish floor elevation of 2260.50 feet approximately 25 feet of difference between foundations.
Based on the explorations performed near the proposed operations building, up to 10 to 15 feet of rock excavations may be necessary.
To minimize impacts to the overlying structure due to potential difficulties in backfilling and compacting crushed rock around the wet well, we recommend that CLSM be utilized to backfill the portion of the wet well excavation that is embedded into the rock layer. CLSM placed as backfill around the wetwell should have a 28-day compressive strength in the range of 100 to 200 psi. CLSM should be placed in lifts as the wet CLSM will impart a lateral pressure to the structure walls prior to setting up. Typical maximum lift thicknesses for the wet CLSM are on the order of five feet. However, the required maximum lift thickness may be determined by assuming the wet CLSM applies a lateral pressure equal to 130H, which is based on the average typical unit weight of CLSM. After the CLSM reaches initial set
(typically at least 24 hours after placement), the CLSM becomes self-supporting and induces negligible lateral loading on the wall of the wet well. Backfill above the rock layer should be completed using structural fill consisting of densely compacted, well-graded crushed rock fill.
As an alternative to backfilling the portion of the structure embedded into the rock layer with CLSM, compacted crushed rock backfill may be used. However, there is some risk of differential movement at the joint between the first-floor slab and the wet well wall due to potential difficulties in placing and compacting the crushed rock backfill around the portion of the structure embedded into the rock layer. If compacted crushed rock backfill is utilized around the portion of the structure embedded into the rock layer, then we recommend designing the wet well walls to resist the lateral earth pressures presented in Exhibit 6-1.
100329 May 2020
Exhibit 6-1: Lateral Earth Pressures for Permanent Embedded Structure Walls
Drainage
Condition
Active Condition1 At-Rest Condition1
Static
Active Pressure
(psf)
Hydrostatic
Pressure (psf)
Surcharge
Active Pressure
(psf)
Seismic
Active Pressure
(psf)
Static
At-Rest Pressure
(psf)
Hydrostatic
Pressure (psf)
Surcharge
At-Rest Pressure
(psf)
Seismic
At-Rest Pressure
(psf)
Drained 34H N/A 0.26q 12H 54H N/A 0.41q 32H
Undrained 34H+17D 62.4D 0.26q 12H 54H+28D 62.4D 0.41q 32H
NOTES:
1 These values assume crushed rock backfill
2 H is the height of drained crushed rock backfill; D is the height of undrained crushed rock backfill
If the wall can move at least 0.002 times the wall height, the wall is considered flexible and active earth pressures can be used. If the wall is considered to be inflexible, then at-rest earth pressures must be used.
Also, while groundwater was not observed in the piezometers installed at the site, we have included the undrained earth pressures in Exhibit 6-1 based on the assumption that surface water, layers of perched subsurface water, or water from leaking pipes or basins may infiltrate into the backfill for the embedded structure walls and that some sort of wall drainage has not been included.
If drainage is included, then we recommend using the drained earth pressures presented in
Exhibit 6-1. Typically, drainage could consist of wall drain board along the outside face of the wall and an underdrain system that are connected to pressure relief valves. As an alternative to pressure relief valves, the drainage system could be connected to a manhole.
6.1.3 Backwash Recovery Basin
Based on our understanding, the backwash recovery basin will be primarily embedded beneath the ground surface. Based on the plan provided to us, the backwash recovery basin will have a shallow founded structure attached to one side of the basin. The finish floor elevation of the shallow structure will be 2280 feet and the slab will be 1 foot thick. The backwash recovery basin itself will have a finish floor elevation of 2259 feet and the slab will be 2 feet 8 inches thick, approximately 22 to 23 feet of difference between foundation bearing subgrades.
Therefore, the base of the backwash recovery basin will be at an elevation of approximately
2256.3 feet. Based on the explorations performed near the proposed backwash recovery basin, up to approximately 20 to 25 feet of rock excavation may be necessary.
DRAFT Geotechnical Engineering Report Addendum
100329 May 2020
To minimize impacts to the overlying shallow founded structure due to potential difficulties in backfilling and compacting crushed rock around the basin, we recommend that CLSM be utilized to backfill the portion of the basin excavation that is embedded into the rock layer and underlying the shallow founded structure. For areas that are not underlying the shallow founded structure, the foundation support should consist of the crushed rock structural fill described above.
As an alternative to backfilling the portion of the structure embedded into the rock layer, compacted crushed rock backfill may be used. However, there is some risk of differential movement at the joint between the shallow vault and the backwash recovery basin wall due to potential difficulties in placing and compacting the crushed rock backfill around the portion of the structure embedded into the rock layer. If compacted crushed rock backfill is utilized around the portion of the structure embedded into the rock layer, then we recommend designing the backwash recovery basin walls to resist the lateral earth pressures presented previously in Exhibit 6-1.
6.1.4 Precast Culvert
We understand that the existing culvert along Horn Creek Road will be replaced with a pre-cast bottomless arch culvert bridge. Based on design drawings including, “Proposed
Culvert, Horn Creek Rd at Ashland Creek (Draft),” prepared by HDR and dated April 24, 2020, the arch culvert will have a total width of approximately 56 feet, and a single span of approximately 40 feet in length. The proposed culvert will be constructed with cast-in-place concrete wingwalls at each abutment with lengths ranging from 11 to 25 feet. As currently planned, the proposed wingwalls will be constructed in areas presently outside of the ordinary high water limits for Ashland Creek.
We understand that the proposed culvert abutments and wingwalls be supported on shallow spread foundations bearing directly on rock. Borings B-21 and B-22, performed on each side of the culvert, encountered coreable, extremely weak to strong (R0 to R4) rock at elevations of approximately 2196 to 2198 feet, while highly weathered rock (soil-like in consistency) was encountered at shallower depths, beginning at elevations of approximately
2205 to 2207 feet. The stronger rock was on the east side of the culvert. As currently depicted on project drawings, spread footings for the culvert are planned with a bottom elevation near El. 2199 feet, which is approximately 5 to 6 feet below the proposed channel bottom and 1 to 3 feet above the coreable rock contacts at borings B-21 and B-22. We recommend that spread footings bearing on rock be designed with an allowable bearing pressure of 6,000 pounds per square foot. The bearing capacity may be increased by 1/3 under seismic loading. We estimate that total settlement of the culvert footings will be less
GALVARAD
Highlight We understand that the proposed culvert abutments and wingwalls be supported on shallow spread foundations bearing directly on rock.
GALVARAD
Highlight We recommend that spread footings bearing on rock be designed with an allowable bearing pressure of 6,000 pounds per square foot.
100329 May 2020 than 0.5-inch with differential settlements less than 0.5-inches over 50 feet. The allowable frictional base sliding resistance may be computed using a coefficient of friction of 0.5.
The culvert will be designed with cast-in-place concrete wingwalls to retain new and existing fill for culvert approaches on each side of the creek. We assume that the wingwalls will be designed as rigid structures using at-rest earth pressures; however, if the walls are permitted to yield, active earth pressures may be used for design. Recommended lateral earth pressures for culvert wingwalls are shown in Exhibit 6-2.
Exhibit 6-2: Lateral Earth Pressures for Culvert Wingwalls
Drainage Condition
Active Condition At-Rest Condition
Static
Active Pressure
(psf)2
Hydrostatic Pressure
(psf) 2
Surcharge
Active Pressure
(psf)3
Seismic
Active Pressure
(psf) 2
Static
At-Rest Pressure
(psf) 2
Hydrostatic Pressure
(psf) 2
Surcharge
At-Rest Pressure
(psf) 3
Seismic
At-Rest Pressure
(psf) 2
Drained 34 D1 N/A 0.26q 8 Hw 54 D1 N/A 0.41q 25 Hw
Undrained 34D1 +
17D2
62.4 D2 0.26q 8 Hw 54D1 +
28D2
62.4 D2 0.41q 25 Hw
1 D1 is the height of drained crushed rock backfill (in feet); D2 is the height of undrained crushed rock backfill (in feet); q is the surcharge load (in pounds); Hw is the exposed wall height (in feet)
2 Triangular pressure distribution
3 Uniform (rectangular) pressure distribution
Lateral passive earth pressures are dependent on ground conditions present in front of the walls and footings. For level ground conditions, we recommend an allowable partial soil passive pressure of 250d psf (where d is depth of the embedment of the bottom of footing below the creek channel bottom) be used for design of sliding and overturning resistance.
Also, for sloping ground conditions as steep as 2H:1V, the allowable partial soil passive pressure should be reduced to 120d psf.
A scour analysis was not performed for this study, and the recommendations presented in this section assume that scour is not anticipated to impact undermine the proposed footings.
If channel scour is a possibility, we recommend lowering the footing elevation below the design scour depth, and also recommend consideration of using revised passive pressure values with the depth being below the potential scour elevation. Revised passive pressure values can be provided if needed.
Seismic design of the culvert for 475-year and 975-year return period events may be performed using the seismic design guidelines presented in Exhibit 6-2 of the GER.
100329 May 2020
6.1.4.1 Rippability and Excavation
Rock encountered during excavation for the culvert is typically expected to consist of extremely weak to very weak rock, based on exploration data. However, the probability of encountering strong, fresh, unaltered bedrock corestones within the weathered granite will increase with depth. Rock excavation in the areas of strong rock will need to be performed using mechanical methods of rock removal, such as pneumatic-hammers (breakers) and saw cutting.
Strong rock was first encountered at a depth of 22.5 feet bgs at boring B-22, approximately 1 foot below the conceptual footing bottom elevation of 2199 feet. Rock was typically encountered at deeper elevations in other borings in this area, as shown on the Figure 7 -
Interpretive Subsurface Profile Section E-E’. In our opinion, significant volumes of strong rock are not anticipated to be present at or above the conceptual footing elevation of 2199 feet on either side of the culvert, and foundation excavations should be largely achievable through use of appropriately sized rock-excavation equipment.
6.2 On-Grade Structures
6.2.1 General
We understand that some of the structures will have foundations bearing on new fill or embedded 10 feet or less below the top of the residual soil surface and are thus considered shallowly founded. These structures are described below in this Section. Based on the explorations performed at the site, much of the site is underlain by a surficial layer of existing fill. For shallowly founded on-grade structures, we recommend that the existing fill be removed within the foundation zone of influence to the residual soil or bedrock contact and replaced with the crushed rock structural fill described previously to the proposed subgrade elevation for the individual structure. The zone of influence is defined as slope line extending away from the outer most edge of the foundations at a downward slope of
0.5H:1V. Depending on where you are on the site, existing fill may range from 3 to 18 feet thick with an average of 9 feet thick across the site. Existing fill thicknesses encountered near specific structure locations are discussed in the following sections.
If the existing fill is removed to the top of the underlying residual soil or rock layer and replaced with compacted crushed rock structural fill, then the recommended allowable bearing pressure is 4,000 psf. The bearing capacity may be increased by 1/3 under seismic loading. We estimate that total settlement of the shallow founded structures will be less than 1-inch with differential settlements less than 0.5-inches in 50 feet. Support for on-grade slabs can be obtained from properly constructed structural fill, and a subgrade modulus of
250 pounds per cubic inch (pci) can be used in the design. The allowable frictional
100329 May 2020 resistance may be computed using a coefficient of friction of 0.4. On level ground, we recommend an allowable partial soil passive pressure of 250d psf (where d is depth of the embedment of the bottom of footing) be used for design of sliding and overturning resistance. For the new reservoir, the top 12 inches of soil should not be used in calculating passive resistance, as construction and post-construction activities often disturb this upper material. We recommend that exterior footings have a minimum embedment depth of 18 inches below grade and that interior footings have a minimum embedment depth of 12 inches.
Below all structural slabs and foundations, a minimum of 3-inch thick leveling course should be placed over 9-inches of open-graded crushed rock (i.e. gradation that is considered “free-draining”), unless otherwise specified in this section. The open-graded layer is recommended as a capillary moisture break at buildings and slabs receiving floor coatings. If additional protection against moisture vapor is desired, a vapor-retarding membrane could be incorporated into the design as specified by the structural engineer or architect.
6.2.2 Operations Building First Floor
Based on our understanding, the on-grade portion of the operations building will have a first-floor finish floor elevation of 2285 feet. Based on the existing topography provided to us, the existing grade will need to be raised to reach the finish floor elevation of 2285 feet.
Based on approximate surface elevations of the explorations, the contact between the existing fill and underlying residual soil/rock layer may be approximately elevation 2270 to
2279.5 feet. Therefore, if the existing fill is removed to the contact with the underlying residual soil or rock and replaced, then this will require approximately 6 to 15 feet of compacted crushed rock structural fill placement.
6.2.3 Clear well
Based on our understanding of the clear well, the finish floor elevation will be at an elevation of 2325 feet. The exterior ring footing will be 3 feet thick placing the bottom of the ring footing at an elevation of 2322 feet. We recommend that a minimum 12-inch-thick layer of compacted crushed rock be used beneath the proposed clear well ring footings, column footings and slab. Therefore, the anticipated subgrade elevation for the clear well is at 2321 feet.
Based on approximate surface elevations of the explorations, the contact between the existing fill and underlying residual soil may be approximately elevation 2319.5 to 2321 feet.
We recommend that existing fill be removed down to the residual soil contact and replaced with compacted crushed rock structural fill. Therefore, approximately 1 to 2 feet of over-
100329 May 2020 excavation below the anticipated subgrade elevation could be required to remove the existing fill.
Further, we recommend that the outside edge of the exterior ring footing should be a minimum of 15 feet horizontally away from the closest crest of slope.
6.2.4 Pretreatment Building
Based on our understanding of the pretreatment building, the finish floor elevation is 2248 feet. However, a portion of the pretreatment building includes a narrow (i.e. approximately
6.5-feet wide) depressed floor 4.5-feet lower than the finish floor elevation for piping. Based on the explorations performed near the proposed pretreatment building, excavations for the depressed floor may require rock excavations up to 4 feet. If rock excavations are required to reach the bottom of the depressed floor, then we recommend that the portion of the structure embedded below rock be backfilled with CLSM. The subsurface conditions at the finish floor elevation of 2248 feet may be residual soil.
6.3 Retaining Walls
6.3.1 General
We understand that up to three retaining walls are currently proposed for the project site and are identified as Retaining Walls 1 through 3. Based on existing surface grades, Retaining Walls 1 and 3 will likely be cut walls and Retaining Wall 2 will be a fill wall.
Based on the preliminary profiles provided to us by HDR and the existing grade, Retaining
Walls 1 and 3 may be up to 10 to 15 feet in height and Retaining Wall 2 may be up to 10 to 12 feet in height at its tallest point. Recommendations for wing walls for the proposed Horn
Creek Road culvert are discussed in Section 6.1.4.
6.3.2 Fill Walls
We understand that underground utilities may be installed ancillary to the operations building and other structures on the main part of the site. Therefore, the use of a
Mechanically Stabilize Earth (MSE) wall or other anchored wall system (with anchors or horizontal reinforcement layers in the backfill zone) should be avoided if planned utilities may be located within or below the reinforced backfill. Utilities that are within the reinforcement zone for a retaining wall will not be accessible for future replacement or maintenance. Removal of anchors or reinforcement for new utility construction could result in future wall failure.
If utilities cannot be routed around the reinforced zone of an MSE wall, then we recommend using some sort of modular block or gravity wall system such as a gabion basket, 100329 May 2020
Ultrablock© wall, or bin wall. Ultrablock© and bin walls are proprietary wall systems.
Gabion basket walls would be cost effective so long as the properly sized rock is readily available near the site or can be manufactured near the site. Consideration of the appearance and maintenance of the final wall facing can also be factors in selecting the wall type.
6.3.3 Cut Walls
For the two cut walls, retaining walls 1 and 3, we recommend using a modular block retaining wall system such as a gabion basket, Ultrablock© wall, crib wall or bin wall.
Ultrablock© and bin walls are proprietary wall systems. Gabion basket walls would be cost effective so long as the properly sized rock is readily available near the site or can be manufactured near the site. Again, consideration of the appearance and maintenance of the final wall facing can be factors in selecting the wall type.
6.3.4 Modular Block Wall Design Recommendations
If a modular block wall is the preferred wall type, we have provided design recommendations that can be utilized for design of either fill or cut wall applications, which can provide the same facing appearance for both. Prefabricated modular walls are typically battered between approximately 3 degrees (1H:19V) and 10 degrees (1H:6V).
In the locations of the proposed retaining walls there may be existing fill below the base of the wall. We recommend that existing fill be removed to the top of the residual soil and replaced with compacted crushed rock structural fill. Based on explorations near the three proposed retaining walls, existing fill may be 3 to 4 feet below the base of the wall. If the existing fill is removed and replaced with structural fill, then the modular block walls may be designed for an allowable bearing pressure of 2,000 psf. The allowable frictional resistance may be computed using a coefficient of friction of 0.4. Retaining walls should be designed for a minimum traffic surcharge of 250 psf along the top of the crushed rock backfill zones. Lateral earth pressures to be used for modular block walls is presented in
Exhibit 6-3.
Exhibit 6-3: Lateral Earth Pressures for Modular Block Walls
Backfill Surface Behind Wall
Static Active Pressure (psf)2
Surcharge Active Pressure (psf)2
Seismic Active Pressure (psf)2
Horizontal 34H 0.26q 12H
Sloping (3H:1V)1 40H 0.3q 27H
NOTES:
1 Sloping backslope of 3H:1V is assumed to be representative of steepest condition for Retaining Wall 3
2 These values assume drained crushed rock backfill
100329 May 2020
In Exhibit 6-3, H is defined as the total height of the cut or fill wall and q is the surcharge load, with q in units of pounds per square foot. For the static lateral earth pressures, we recommend active earth pressure be used in the design for modular block walls as they are typically considered as flexible wall systems. For the seismic loading condition, the seismic pressure can be applied as a triangular distribution and is additive to the static soil pressures. Therefore, the total combined resultant force from the static and seismic loading acts at a point one third above the base of the wall.
We recommend that global stability of the retaining walls be evaluated once the final wall layout, heights and grades are known. There is potential that the cut walls, retaining walls 1 and 3, could be founded on rock. If the walls are founded on rock, then global stability is not likely an issue.
Although groundwater was not measured, some amount of seepage from surface water or other perched sources may still impact the retaining walls. Therefore, we recommend that consideration be given to the inclusion of wall base subdrain system. The wall base subdrain system would be behind the base of the wall and could convey any collected seepage to the end of the wall and daylight at low spots below the wall elevation.
7 CONSTRUCTION CONSIDERATIONS
General construction considerations were discussed in the Final GER related to earthwork, subgrade preparation, wet weather construction, and fill materials. Unless noted otherwise in this addendum, the construction considerations presented in the Final GER are still valid.
SITE
LOCATION
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, © OpenStreetMap contributors, and the GIS User Community, Sources:
Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, © OpenStreetMap contributors, and the GIS User Community
Ashland 7.5 MGD WTP (#10136851) Ashland, Oregon
FIG. 1
VICINITY MAP
May 2020 100329 0 1 20.5
Scale in Miles
F ile n a m e T
P ro je c ts
\P D
X \1 s \1
A s h la n d
W W
T P
\A v m x d \V ic in it y M a p
.m x d
D a te
/4
/2
L o g in a th
Site Location
Idaho
Washington
NevadaCalifornia
/@A
@A
ED
ED
ED
ED
ED
ED
/@A @A
ED@A
@A
ED @A
@A
@A
@A
@A @A
/@A
@A
/@A
@A
@A
ED
ED
ED
ED
@A
@A
@A
@A
@A @A
Gr an ite St ree t
Glenview Drive
A'
C'
C
A
B
B'
D
D'
Oper atio ns Build ing
Pretreatment Building
Backwash and Recovery Basins
Clearwell Retaining Wall 1
Retaining Wall 3
Retaining Wall 2
E
E'
B-01
B-02
TP-08
TP-01
TP-05
TP-02
TP-03
TP-04
B-05
B-04
TP-06B-03
B-12 TP-07
B-06
B-07
B-10
B-09
B-11 B-08
B-13
B-14
B-15
B-16
B-17
TP-09
TP-12TP-11
TP-10
B-06A
B-18
B-19
B-20
B-21 B-22
Ashland 7.5 MGD WTP (#10136851) Ashland, Oregon
SITE AND EXPLORATION PLAN
FIG. 2
May 2020 100329
Filename: T:\Projects\PDX\100000s\100329_Ashland WWTP\Avmxd\Addendum SitePlan_10.6 (February 2020).mxd Date: 5/12/2020 Login: AEH
0 100 20050
Scale in Feet
FIG. 2
LEGEND
@A Designation and Approximate Location of Boring
/@A Designation and Approximate Location of Boring with Piezometer
ED Designation and Approximate Location of Test Pit Approximate Location of Proposed Retaining Walls Approximate Location of Proposed Site Layout
B-01
TP-01
NOTES
1. Aerial imagery obtained through Google Maps Satellite.
2. Proposed features adapted from file x_00C-SP01.dwg, provided by HDR, Inc., on January 15, 2020.
B-05
Designation and Location of Subsurface Profile or Analysis Model
A A'
A p p r o x i m a t e
E l e v a t i o n i n
F e t
N
G V
D
Distance in Feet
0+00 1+00 2+00 3+00 4+00 5+00
A p p r o x i m a e v a t i o n e t
N
G V
D
A A'
6+00 7+00
50/1st 5''
50/1st 5''
50/1st 4''
0/99
0/100
10-31-18
B-01
50/2nd 3''
50/1st 2''
0/87
0/96
0/100
0/100
(Proj. 21' NE)
11-01-18
B-02
95/8''
50/1st 2.5''
(Proj. 7' SW)
11-01-18
B-04
50/1st 3''
50/1st 1''
11-02-18
B-06
50/1st 5''
50/1st 4.5
(Proj. 42' NE)
11-05-18
B-07
82/10''
50/1st 4''
50/1st 2''
20/80
0/100
0/100
32/100
88/100
90/100
77/100
(Proj. 6' NE)
12-17-19
B-18
50/1st 4''
50/1st 4''
0/100
0/22
0/92
12-17-19
B-19
Existing Ground Surface
Interpreted Top of Rock or
Boring / Test Pit Refusal, See Note 4
10-09-18
TP-06
(Proj. 30' NE)
10-09-18
TP-07
10-09-18
TP-08
03-21-19
TP-12
Clearwell
Backwash
Recovery
Basins
Operations Building
Pretreatment
Building
Operations Building Wet Well
(Finish Floor El 2260.50 feet)
Pretreatment Building
(Finish Floor El 2248 feet;
Depressed Floor El 2243.50 feet)
Clearwell
(Bottom of Ring Footing El 2322 feet)
Backwash Recovery Basin
(Bottom of Foundation El 2256.33 feet)
SUBSURFACE PROFILE A-A'
FIG. 3
Geotechnical and Environmental Consultants
SHANNON & WILSON, INC.
F i l e
I E
F P
D X s
C i t y o f
A s h l a n d D
R A
F T
I N
G S u b s u r f a c e
P r o f i l e s S u b s u r f a c e
P r o f i l e s
F e b d w g t e u t h o r
A
E H
NOTES
1. Existing ground surface generated from 1213 TOPO
OR_SP_SZ.dwg, provided by HDR on January 15, 2020.
2. Proposed structure elevations provided by HDR.
3. Approximate building footprints based on file x_00C-SP-01.dwg, provided by HDR on January 15, 2020.
4. Boring and test pit refusal indicates the depth at which drilling / excavation techniques and equipment, used at the time of the exploration, could not penetrate feasibly.
5. See Appendix A for complete exploration logs and explanations of symbols.
6. See Figure 2 for profile location.
25 50
Vertical Scale in Feet
50 100
Horizontal Scale in Feet
Vertical Exaggeration = 2x
Designation and Projection of
Exploration to Profile Line
Soil or Rock Type Symbol
Sample and Penetration
Resistance in Blows/Foot or
Blows/Inches Driven
Bag Sample
Core Sample
Core RQD/Recovery
Bottom of Exploration
Date of Completion
LEGEND
100329
Ashland 7.5 MGD WTP (#10136851)
Ashland, Oregon
May 2020
50/1st 5''
50/1st 4''
91/99
100/100
10-31-18
B-01
(Proj. 22' SW)
AutoCAD SHX Text
FILL
AutoCAD SHX Text
FILL
AutoCAD SHX Text
FILL
AutoCAD SHX Text
FILL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text p r o x i m a e v a t i o n e t
N
G V
D
Distance in Feet
0+00 1+00 2+00 3+00 4+00
A p p r o x i m a e v a t i o n e t
N
G V
D
B B'
Existing Ground Surface
Interpreted Top of Rock or
Boring / Test Pit Refusal, See Note 4
50/2nd 3''
50/1st 2''
0/87
0/96
0/100
0/100
(Proj. 62' SE)
11-01-18
B-02
50/1st 5.5''
50/1st 2''
10/40
42/52
40/100
44/100
(Proj. 28' SE)
11-01-18
B-03
(Proj. 39' SE)
10-09-18
TP-01
10-09-18
TP-02
(Proj. 6' NW)
10-09-18
TP-05
(Proj. 43' SE)
10-09-18
TP-07
(Proj. 62' SE)
03-21-19
TP-10
Road
Crowson
Pump Station
Backwash
Recovery
Basins
Ozone
Generator
Lox
Storage and
Vaporizers
Backwash Recovery Basin
(Bottom of Foundation El 2256.33 feet)
SUBSURFACE PROFILE B-B'
FIG. 4
Geotechnical and Environmental Consultants
SHANNON & WILSON, INC.
F i l e
I E
F P
D X s
C i t y o f
A s h l a n d D
R A
F T
I N
G S u b s u r f a c e
P r o f i l e s S u b s u r f a c e
P r o f i l e s
F e b d t e t h o r
A
E H
NOTES
1. Existing ground surface generated from 1213 TOPO
OR_SP_SZ.dwg, provided by HDR on January 15, 2020.
2. Proposed structure elevations provided by HDR.
3. Approximate building footprints based on file x_00C-SP-01.dwg, provided by HDR on January 15, 2020.
4. Boring and test pit refusal indicates the depth at which drilling / excavation techniques and equipment, used at the time of the exploration, could not penetrate feasibly.
5. See Appendix A for complete exploration logs and explanations of symbols.
6. See Figure 2 for profile location.
25 50
Vertical Scale in Feet
50 100
Horizontal Scale in Feet
Vertical Exaggeration = 2x
Designation and Projection of
Exploration to Profile Line
Soil or Rock Type Symbol
Sample and Penetration
Resistance in Blows/Foot or
Blows/Inches Driven
Bag Sample
Core Sample
Core RQD/Recovery
Bottom of Exploration
Date of Completion
LEGEND
100329
Ashland 7.5 MGD WTP (#10136851)
Ashland, Oregon
May 2020
50/1st 5''
50/1st 4''
91/99
100/100
10-31-18
B-01
(Proj. 22' SW)
AutoCAD SHX Text
FILL
AutoCAD SHX Text
FILL
AutoCAD SHX Text
RESIDUAL SOIL
AutoCAD SHX Text
MOUNT ASHLAND PLUTON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text p r o x i m a e v a t i o n e t
N
G V
D
Distance in Feet
0+00 1+00 2+00 3+00
A p p r o x i m a e v a t i o n e t
N
G V
D
C C'
Existing Ground Surface
Interpreted Top of Rock or
Boring / Test Pit Refusal, See Note 4
50/1st 4''
50/1st 2''
0/0
0/44
0/96
0/100
11-02-18
B-05
(Proj. 32' NW)
03-21-19
TP-11
(Proj. 54' NW)
03-21-19
TP-12
Road
Operations Building
Operations Building Wet Well
(Finish Floor El 2260.50 feet)
SUBSURFACE PROFILE C-C'
FIG. 5
Geotechnical and Environmental Consultants
SHANNON & WILSON, INC.
F i l e
I E
F P
D X s
C i t y o f
A s h l a n d D
R A
F T
I N
G S u b s u r f a c e
P r o f i l e s S u b s u r f a c e
P r o f i l e s
F e b d t e t h o r
A
E H
NOTES
1. Existing ground surface generated from 1213 TOPO
OR_SP_SZ.dwg, provided by HDR on January 15, 2020.
2. Proposed structure elevations provided by HDR.
3. Approximate building footprints based on file x_00C-SP-01.dwg, provided by HDR on January 15, 2020.
4. Boring and test pit refusal indicates the depth at which drilling / excavation techniques and equipment, used at the time of the exploration, could not penetrate feasibly.
5. See Appendix A for complete exploration logs and explanations of symbols.
6. See Figure 2 for profile location.
25 50
Vertical Scale in Feet
50 100
Horizontal Scale in Feet
Vertical Exaggeration = 2x
Designation and Projection of
Exploration to Profile Line
Soil or Rock Type Symbol
Sample and Penetration
Resistance in Blows/Foot or
Blows/Inches Driven
Bag Sample
Core Sample
Core RQD/Recovery
Bottom of Exploration
Date of Completion
LEGEND
100329
Ashland 7.5 MGD WTP (#10136851)
Ashland, Oregon
May 2020
50/1st 5''
50/1st 4''
91/99
100/100
10-31-18
B-01
(Proj. 22' SW) p r o x i m a e v a t i o n e t
N
G V
D
Distance in Feet
0+00 1+00 2+00
A p p r o x i m a e v a t i o n e t
N
G V
D
D D'
Existing Ground
Surface
Interpreted Top of Rock or
Boring / Test Pit Refusal, See Note 4
(Proj. 12' SE)
10-31-18
B-01
(Proj. 19' NW)
12-18-19
B-20
Clearwell
Clearwell
(Bottom of Ring
Footing El 2322 feet)
SUBSURFACE PROFILE D-D'
FIG. 6
Geotechnical and Environmental Consultants
SHANNON & WILSON, INC.
F i l e
I E
F P
D X s
C i t y o f
A s h l a n d D
R A
F T
I N
G S u b s u r f a c e
P r o f i l e s S u b s u r f a c e
P r o f i l e s
F e b d t e t h o r
A
E H
NOTES
1. Existing ground surface generated from 1213 TOPO
OR_SP_SZ.dwg, provided by HDR on January 15, 2020.
2. Proposed structure elevations provided by HDR.
3. Approximate building footprints based on file x_00C-SP-01.dwg, provided by HDR on January 15, 2020.
4. Boring and test pit refusal indicates the depth at which drilling / excavation techniques and equipment, used at the time of the exploration, could not penetrate feasibly.
5. See Appendix A for complete exploration logs and explanations of symbols.
6. See Figure 2 for profile location.
25 50
Vertical Scale in Feet
50 100
Horizontal Scale in Feet
Vertical Exaggeration = 2x
Designation and Projection of
Exploration to Profile Line
Soil or Rock Type Symbol
Sample and Penetration
Resistance in Blows/Foot or
Blows/Inches Driven
Bag Sample
Core Sample
Core RQD/Recovery
Bottom of Exploration
Date of Completion
LEGEND
100329
Ashland 7.5 MGD WTP (#10136851)
Ashland, Oregon
May 2020
50/1st 5''
50/1st 4''
91/99
100/100
10-31-18
B-01
(Proj. 22' SW)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 50/1st 5''
AutoCAD SHX Text 50/1st 5''
AutoCAD SHX Text 50/1st 4''
AutoCAD SHX Text 0/99
AutoCAD SHX Text 0/100
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text p r o x i m a e v a t i o n e t
N
G V
D
Distance in Feet
0+00 1+00 2+00
A p p r o x i m a e v a t i o n e t
N
G V
D
E E'
Existing Ground Surface
Proposed Ground Surface
2230 2230
50/3''
50/3''
50/1st 4''
0/23
0/16
0/40
36/76
11-05-18
50/1st 3''
50/1st 0''
100/100
87.5/100
96/100
78/96
11-06-18
50/1st 1"
50/4"
50/1st 2"
50/1st 2"
50/1st 2"
03-28-19
50/1st 5.5''
50/1st 3''
0/40
8/60
50/96
78/100
42/100
42/92
04-23-20
50/5.5''
50/4''
50/1st 1''
0/0
0/70
95/100
94/97
78/100
74/100
52/100
58/100
50/100
04-23-20
B-17
(Proj. 33' SE)
B-11
(Proj. 6' SE)
B-22
(Proj. 11' NW) B-21
(Proj. 15' NW)
B-08
(Proj. 25' SE)
Interpreted
Top of Rock
SUBSURFACE PROFILE E-E'
FIG. 7
Geotechnical and Environmental Consultants
SHANNON & WILSON, INC.
F i l e
I E
F P
D X s
C i t y o f
A s h l a n d D
R A
F T
I N
G S u b s u r f a c e
P r o f i l e s S u b s u r f a c e
P r o f i l e s
F e b d t e t h o r
M
X H
NOTES
1. Ground surfaces generated from…
This is the start of the file's text. The full file is on GovTribe.