1. Addendum No. 4.pdf
PDF 468 KB Posted
- Attached to
- Ashland Water Treatment Plant
- Solicitation number
- S-KA0010-00018090
- Issued by
- Jackson County, Amity City, Oregon
About this file
Addendum No. 4 is a modification document issued by the City of Ashland, Oregon on October 29, 2026, for the construction of a new water treatment plant (City Project No. 2018-2000 90 13.1). This addendum addresses bidder questions and clarifies contract requirements through 139 questions and answers, along with revisions to drawings and specifications. The original bid opening was scheduled for November 5, 2026, with City Council approval anticipated on November 17, 2026, and Notice to Proceed expected in spring 2027. Contractor pricing must be held until February 1, 2027. The City will pay all permitting fees (City of Ashland, Jackson County, and Oregon DEQ permits) and transfer permit ownership to the selected contractor upon Notice to Proceed issuance. Early limited Notice to Proceed is available for long-lead item procurement, with the City compensating contractors for verified materials on hand. Addendum No. 4 consists of 29 pages and incorporates changes to specifications and drawings, including new specification sections for vinyl base (09 65 14) and LVT flooring (09 65 19), modifications to bid forms to include separate unit price items for unsuitable material removal and rock removal, and clarifications on wall penetrations, piping systems, electrical requirements, and structural details.
Key modifications include confirmation that the City will assume permit costs previously questioned by bidders, elimination of references to U.S. Forest Service requirements, revision of bid form items to address rock excavation and unsuitable material as separate pay items rather than included in lump-sum contingency, and extensive clarifications on piping materials, equipment specifications, architectural details, and construction procedures. The project involves Davis-Bacon prevailing wage requirements due to WIFIA funding, and HB 2688 requirements apply for offsite fabrication. Bid security remains at 10% of maximum bid price as originally specified, with no reduction to 5% permitted. The City will consider design alternatives and value engineering requests only after contract award. Wildfire season restrictions (May through mid-September or October, dependent on conditions) apply to construction activities requiring open flames or hot equipment, subject to Fire Marshal approval. The addendum removes certain specification sections (Section 26 42 13 for sacrificial anode cathodic protection) as not applicable and clarifies that standing seam metal roofing is excluded from scope, retaining only roofing accessories. Contractors must acknowledge receipt of this addendum in their bid proposal.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City Project No. 2018-20
00 90 13.1 -
Addendum No. 4
SECTION 00 91 13
ADDENDUM NO. 4
Date of Issue: OCTOBER 29, 2026
To all prospective bidders of record on the Work titled: City of Ashland, OR Water Treatment Plant
The Drawings and Project Manual including Specifications are modified as follows. This Addendum forms a part of the Contract Documents and modifies the original documents.
Acknowledge receipt of this Addendum in the space provided in the BID FORM and on the last page of the Addendum. Failure to do so may subject the Bidder to disqualification.
This Addendum consists of 29 pages, attached modified Drawings and Specifications, and other referenced attachments.
Pierre Kwan, PE HDR Engineering, Inc.
BIDDER QUESTIONS
Q1: At the mandatory pre-bid conference, it was stated that certain construction activities may be restricted during wildfire season, approximately May through mid-September or October, unless approved by the Fire Marshal. Please confirm the applicable restriction dates, prohibited or restricted activities, approving authority, required fire-prevention measures, and whether these restrictions will be incorporated into the Contract Documents by Addendum.
A1: The approving authority is the City Fire Marshal. As stated in the pre-bid conference and in the distributed notes, the dates of May through mid-September will vary from year to year and are dependent on weather conditions. Dry winters and springs will mean that wildfire season will start earlier and last longer than years with wet winters and springs. General prohibited or restricted activities will be any activities using open flames or hot equipment near trees, grasses, or any dry materials unless fire watchers and outdoor fire suppression supplies stationed nearby. These conditions are tied to the City of Ashland Physical and Environmental Constraints Permit and the Building Permit listed in 01 41 24-1.3-A.1.
Q2: Prebid meeting states City Council Approval is 11/17/2026 and NTP Spring of 2027. How many months is the contractor required to hold pricing before NTP is given. Have you given consideration for early limited NTP to allow for early procurement for securing pricing A2: The selected Contractor shall hold their pricing to no later than February 1, 2027. As stated in the pre-bid meeting notes, the City is agreeable to working with the Contractor on an early limited NTP to process submittals and place orders for long-lead items. The City will compensate the Contractor for verified materials on hand as long as the City agrees that acquisition is appropriate. The City can also approve early out acquisition prior to NTP if the Contractor requests and we approve.
Q3: Section 00 21 13, Article 8.02 requires bid security equal to 10% of the Bidder’s maximum bid price, including the base bid and all alternates. Due to the anticipated contract value, would the City consider accepting a bid bond equal to 5% of the maximum bid price in lieu of the specified 10%? If acceptable, please revise the bid bond requirement by addendum.
A: No, this suggested change is rejected.
Q3: Due to the size and complexity of the project and the time needed to obtain complete subcontractor and supplier pricing, would the City consider extending the current bid date?
A: No. The bid date will not change.
Q4: Permit fees. General Conditions 7.09.A says the Contractor obtains and pays for all construction permits, and the Supplementary Conditions don't change that. The pre-bid meeting notes refer bidders to Section 01 41 24 for the City of Ashland, Jackson County and Oregon DEQ permits the Contractor is responsible for, and also say Public Works manages the permitting process. Those fees are set by the City and the other agencies, and bidders have no reliable way to calculate them for a project like this. So that every bidder carries the same cost, please either (a) provide the fee amount for each permit the Contractor is to pay, or a single permit fee allowance on the Bid Form, or (b) confirm that the City will pay the permit fees and bidders should not include them. If the City has already applied for or will obtain any of the permits in 01 41 24, please tell us which ones.
A4: The City will pay all permitting fees and transfer permit ownership over to the Contractor with issuance of the Notice to Proceed. See Change To Specifications for revisions to Section 01 41 24.
Q5: Contract start, award and procurement. The pre-bid notes say a Notice of Intent to Award will follow bid opening, Council will approve the award on 11/17/2026, and the Notice to
Proceed will be issued in Spring 2027 to allow time for bid review and permitting. GC 4.01.A, which the Supplementary Conditions do not modify, starts the Contract Times no later than the 60th day after bid opening (1/4/2027) or the 30th day after the Effective Date of the Contract, whichever is earlier. Please clarify by addendum:
a. The expected dates for the Notice of Award and for the Effective Date of the Contract (fully signed Agreement).
b. Whether the Contract Times will start per GC 4.01.A, or whether GC 4.01.A will be revised so they start on the date in the Notice to Proceed. If revised, please state the latest date the Notice to Proceed will be issued.
c. Whether the Contractor may issue purchase orders and subcontracts after the Effective Date but before the Notice to Proceed, and whether HDR will review and approve submittals during that period so long-lead equipment can be released.
d. How materials and equipment ordered before the Notice to Proceed will be paid (pre-bid answer A11), including materials stored off-site under GC 15.01.B.2.
e. If the Notice to Proceed is issued later than the date in item b, whether the Contract Price will be adjusted for the delay.
A5: The following answers are provided:
a. The expected Notice of Award is between November 5, 2026 and November 17, 2026.
The expected Effective Date of the Contract is prior to February 1, 2027.
b. The Contract Times shall start per GC 4.01-A.
c. Yes, Contractor may issue purchase orders and subcontracts prior to the Notice to
Proceed. See response A2 of this addendum.
d. See response A2 of this addendum.
e. See Item b of this answer.
Q6: Missing contract documents. SC-7.11 refers to SC Article 19 and Document 00 73 73, Statutory and Funding-Financing Entity Requirements, and Agreement 8.04 refers to Safe Drinking Water financing provisions and labor standards attached to the Agreement. These and the wage determination are not in the bid documents. Please issue them.
A6: The City does not have the SRF documents at this time as they would be tied to grant funding coming next year. The contract at that time would need be amended to include the SRF requirements, which are unknown at this time. Davis-Bacon requirements still apply because of the WIFIA funding.
Q7. Notice to Proceed form (00 55 00). The list of requirements before starting work at the Site includes "Ashland and US Forest Service requirements for the culvert work." We believe this language carried over from the separate culvert project, since the new culvert on the way to the site is already in place. Please confirm there are no US Forest Service requirements on this project and correct the form by addendum.
A8. There are no US Forest Service requirements. See Changes To Specifications for revisions to Section 00 55 00.
Q8. Landscape Contractors Boaidrd license. Bid Form 6.02.A.12 requires the Bidder's LCB license number "if applicable." If all landscaping is performed by an LCB-licensed subcontractor, is the prime Bidder still required to hold an LCB license?
A8. Having the subcontractor hold this license will meet this requirement.
Q9: 05 12 00, 1.4, A.3.a states " Prepare shop drawings under NISD Quality Procedures Program Certification". Please clarify if this actual certification is required, or if it simply requires the use of industry standard shop drawings and detailing.
Q9: Certification is not required. The intent is that Contractor shall follow this industry standard for shop drawing preparation.
Q10: Can you please confirm that this project will be subject to HB 2688 requiring BOLI prevailing wages for offsite fabrication?
Q10: This project is subject to the requirements of HB 2688.
Q11: I would like to ask for clarification regarding specifications 07 61 13 and where the metal roofing is implemented on the drawings. On the plans it looks to only show the insulated metal paneling from section 07 41 13.
A11: This project utilizes preinsulated roof panels. Specification 07 41 13 includes roofing accessories that also apply to the preinsulated roof panels. Uninsulated roofing in the specification are not in the scope of this project.
Q12: Can you please clarify if the roof hatch dimensions should be 4’x4’ or 4’6”x4’6”.
Additionally, can you confirm the dimensions from the edges. The measured distances when modeled don’t line up with the Architects’ dimensions.
A12: Hatches in Building 300 are nominally 4'6" x 4'6" and those of building 600 are 4'0"x4'0".
Q13: The height of “door leaf” shown for man doors in the door schedule is 7’-2. The door frames for these doors are shown with 4” high head members This creates a rough opening height of 7’-6 Please verify if that is correct?
A13: All doors to use a consistent 2" frame in a 7'4" rough opening.
Q14: Wall panel thicknesses are shown on drawings as 4” thick vertical & 3” thick horizontal – please confirm that the different thicknesses are correct?
A14: Thickness of insulated metal panels vary as indicated on 000A001. Provide a prefinished flashing transition between any differences in thickness in accordance with manufacturer recommendations, to match the predominant field color.
Q15: Insulated metal wall panels: Confirm the wall panel thicknesses shown on the drawings are correct: 4-inch vertical panels and 3-inch horizontal panels.
A15: Thickness of insulated metal panels vary as indicated on 000A001. Provide a prefinished flashing transition between any differences in thickness in accordance with manufacturer recommendations, to match the predominant field color.
Q16: Insulated metal wall panels: Drawing 300A203 identifies a “CF Architectural Wall Panel.”
Confirm whether this is intended to be a Metl-Span Architectural Flat panel or provide the required panel type.
A16: While not a sole source procurement, see link for basis of design and review specification 07 41 14. https://metlspan.com/products/wall/insulated-metal-panels/cf-architectural-wall-panel/
Q17: Insulated metal wall panels: Confirm that the south wall of the Electrical Building is to receive horizontal panels.
A17: Please review all architectural elevation sheets to identify the walls on each building that get specific panels.
Q18: The 3-foot-high windows may not align with the horizontal panel layout. May the window heights be adjusted as required to coordinate with the panel width, curb height, and panel lap?
A18: Where the 3' windows are set in a band of horizontal 3' "tall" wall panel, the panel height governs and the window size does adjust if necessary to fit within the horizontal band.
https://metlspan.com/products/wall/insulated-metal-panels/cf-architectural-wall-panel/
Q19: Please provide a section or detail for the recessed storefront at the Operations Building lobby showing the recess opening height and soffit construction/finish requirements.
A19: See Changes to Drawings for updated Drawing 300A303.
Q20: 100A201/100A101 - Roll Up Door. There is a callout in Section 2 for a roll up door however a roll-up door has not been shown on any exterior section views of this building. On sheet 100A101 it appears the roll up door is in the path of the north facing exterior door 100- 103B on an internal wall. Can you please clarify what is supposed to be happening here?
A20: Roll up door in Bldg 100 is to be located on the exterior wall at gridline 3, at the dimension from the corner provided in the drawings.
Q21: 300A303 - Bentonite Waterproofing. We have only found the use for the bentonite waterproofing at the operations building as identified in these section views. Are there any other place this waterproofing will be required?
A21: Bentonite waterproofing is to be used wherever there is below ground concrete with an interior face exposed to air because hydrostatic pressure will force ground water through capillary cracks in the concrete. It is not required in underground tanks.
Q22: 07 19 00 - Liquid Water Repellent. Can you please clarify where this water repellent is meant to be applied, in other instances that aren’t indicated on the finish schedule?
A22: Liquid water repellent is to be applied at any concrete walls exposed to view and the elements.
Q23: 07 54 19 – Where does the membrane roofing apply to this project?
A23:PVC membrane roof applies to the roof over the cast in place concrete portion of the Operations Building outsideof the tanks between gridlines 3 to 7, and E to J.
Q24: After review of the door schedule posted in Addendum #2, the following doors have hardware groups that are in conflict; Door 100-103B, 300-102A, 300-103B, 300-103C, 300- 103D, 300-105B, 300-106A, 300-106B, 300-112B, 300-113A, 300-113B, 300-200B, and 300- 209A. Most of these openings are noted as HW213, which per the hardware specification, is supplement hardware to be added to a different hardware group, not intended to stand alone. Please clarify.
A24: Please use hardware as noted on doors here:
100-103B: HW112+HWE-213; 300-102A: HW216+ HWE-213;
300-103B: HW112+HWE-213; 300-103C: HW112+HWE-213;
300-103D: HW112+HWE-213; 300-105B: HW112+HWE-213;
300-106A: HW112+HWE-213; 300-106B: HW112+HWE-213;
300-112B: HW112+HWE-213; 300-113A: HW114+HWE-213;
300-113B: HW112+HWE-213; 300-200B: HW216+HWE-213;
300-209A: HW112+HWE-213.
Q25: No specification section has been provided for vinyl base. Please provide.
A: Section 09 65 14 added. See Changes to Specifications for revision.
Q26: There is no specification section for the LVT flooring. Please provide.
A26: Section 09 65 19 added. See Changes to Specifications for revision.
Q27: In spec section 08 06 71 there is no information for hardware groups 116 and 210. Please provide.
A27: Please provide hardware 216 for doors 102A, 112C, 200B, and 201A in lieu of 116.
Please provide door hardware 210(edited) for door 102B in lieu of 116. Due to a formatting error, Hardware group 210 was embedded in HW-207; please use as indicated separate below:
Q28: If all doors for this project are aluminum then can all type B doors be changed to type A?
And all type D and E doors be changed to type C doors? Because door types A and C are the only door types that are aluminum doors. Types B, D and E are all hollow metal doors.
A28: Door types are not dependent on material. It is possible to source flush aluminum doors instead of glazed.
Q29: The architectural drawings identify roller shades in the Command Room (300-205), Office (300-206), I.T. Closet (300-207), and Meeting Room (300-208). Could you please clarify the following?
1. Product specifications: Is there a designated manufacturer, product, or specification section for the roller shades? We haven't been able to locate the detailed requirements.
2. Operation: Are the shades intended to be manually operated or motorized?
3. Fabric: Is there a specified fabric, openness factor, color, or room-darkening requirement?
4. Quantities and sizes: Is there a shade schedule identifying the required quantities and dimensions for each room, including whether larger window openings require multiple shades?
5. Installation: Are there specific mounting, fascia, or electrical requirements we should include?
A29: See specs 12 24 13. Size shades to window pane width between mullions. Follow manufacturer recommendations for installation.
Q30: Drawing 100A101 for the Pretreatment building. Roll up door 100-103A is shown to be on the interior of the building, along with another wall drawn adjacent to this door. Please confirm this is an error, that the door should be located on the building exterior wall and there is not an interior wall at this location.
A30: We confirm that the overhead door was to be on exterior wall and not floating inside building.
Q31: Please provide details for the wood feature wall on the north wall of the lobby.
A31: See Changes to Drawings for updated Drawing 300A303.
Q32: Drawing 000A017 (Addendum No. 3) specifies bronze-anodized aluminum roof hatches, while Section 07 72 33 specifies galvanized steel construction. Bilco, a specified manufacturer, has confirmed that anodized finishes are not available on its thermally broken roof hatches.
Please clarify which requirements govern and whether a non-thermally broken hatch would be acceptable to achieve the specified bronze-anodized finish, or if a thermally broken hatch with a factory-applied bronze coating or mill finish is preferred.
A32: Bid with a factory applied bronze coating finish. We need to have the hatch be thermally broken.
Q33: It is assumed that the mezzanine in the operations building ties into the PEMB frames. If so, what are the second floor loading requirements? Floor dead load; floor live load; collateral load; deflection criteria.
A33: The Operations building 'mezzanine' loading criteria is provided in the Facility Structural Notes on sheet 300S105. Include the 'Dead Load - Collateral Roof Loading' on the second floor.
Deflection criteria provided in Specification section 13 34 19 part 2.3.H.
Q34: Do the stairs on the south side of the Electrical building, attach to any part of the electrical building?
A34: The stairs on the NE side of the Electrical building are not supported from the Electrical building.
Q35: On sheet 300A101 adjacent to the pipe gallery are walls labeled "FW1". There is no FW1 wall on sheet 000A001. Please clarify.
A35: Noted wall is a cast in place structural concrete wall built per structural criteria, no additional materials aside from paint is applied. FW1 designation is not applicable.
Q36: On detail 1/300A101 there is a wall in the locker room labeled "IW1a". There is no Iw1a wall on sheet 000A001. Please clarify.
A36: This partition was to read "IP1a".
Q37: The structural drawings indicate W-shapes, HSS, channels, angles, and associated connection materials; however, the required finish/coating system is not clearly identified on the drawings or in the specs. Please confirm the structural steel members should be hot-dipped galvanized, unless specifically called out differently.
A37: Per specification section 13 34 19, PEMB primary framing to be galvanized.
Q38: Detail 3/100S301 does not clearly identify the required footing depth. Please confirm the required depth of the interior footing and provide the corresponding bottom-of-footing elevation.
A38: The interior wall footing depths are noted on plan 100S101 as 12" deep.
Q39: Please confirm all water bearing structures as identified in the specifications are to receive crystalline cementious waterproofing admixture.
A39: Per specification section 07 16 16, crystalline cementitious waterproofing admixture to be provided for all water bearing structures.
Q40: Would the owner consider including modular block systems as an approved alternative for the MSE Wall as long as design requirements are met?
A40: Bid the project as specified. We will consider alternatives after Notice to Proceed is issued.
Q41: Please confirm whether ERU-3001 in the Operations Building is to be suspended from the roof structure or supported by the platform framing below.
A41: The Operations Building is a pre-engineered metal building that is a delegated design per 01 35 73 and 13 49 19. How ERU-3001 is to be supported shall be coordinated by the Contractor with the building designer.
Q42: Drawing 300P904 - the Pump schedule and sump pump spec both only show one sewage sump pump but this isometric drawing shows two sump pumps with two parallel SPD lines. Are two sump pumps required here and then another in the elevator shaft?
A42: Sewage sump pump SSP-3001 is duplex as indicated in the pump schedule on sheet 000P602.
Elevator Sump Pump ESP-3001 is simplex as indicated in the pump schedule on sheet 000P602.
Q43: The plans identify louver 1008 as 42X60 and associated motorized damper 1004 as 48x48. Please clarify.
A43: Louver and damper size: 42” W x 60” H
Q44: The plans identify louver 1006 as 76X72 and associated motorized damper 1004 as 72X72. Please clarify.
A44: Louver and damper size: 72” W x 76” H
Q45: Please confirm louver 1001 is for passive ventilation and does not require a powered piece of equipment or a damper attached to it.
A45: No motorized damper behind LVR-1001.
Q46: Please confirm louver 1009 is for passive ventilation and does not require a powered piece of equipment or a damper attached to it.
A46: No motorized damper behind LVR-1009.
Q47: Division 23 09 00 references industrial programmable controllers for the HVAC control system. Please confirm whether the intent is to require PLC-based controllers for HVAC equipment, or whether purpose-built DDC controllers are acceptable.
A47: The HVAC systems shall operate as standalone equipment. No integration with the Building Management System (BMS) or SCADA system is intended with the exception of PHP- 1001. As such, remote control, remote monitoring, equipment graphics, remote setpoint adjustments, and similar supervisory functions are not required.
Q48: Is the intent for the plant SCADA system to provide the complete HVAC operator interface, including equipment graphics, alarms, trends, scheduling and setpoint adjustment, or may HVAC be managed through a dedicated BMS with selected HVAC alarms/status integrated to the plant SCADA system?
A48: Certain units may require interlocks with associated fans and/or dampers within the room to ensure proper operation. For PHP-1001, the unit is intended to operate continuously to maintain the required room air change rate. If the unit is off, inactive, or otherwise unable to operate, an alarm shall be transmitted to the SCADA system indicating the unit status. Refer to 000M604 for the HVAC sequence of operation.
Q49: We require clarification on the number of Ballasted Flocculation Hydrocyclones. Section
46.43.62 states that Seller shall include one hydrocyclone per ballasted sedimentation train, while Drawings 000Y606 and 300S403 show two hydrocyclones per train. Please confirm the number of hydrocyclones per train.
A49: See Changes to Specifications for revisions to Section 46 43 62.
Q50: Section 46 43 62. Paragraph 1.4.B refers to raw water turbidity spikes up to 2,000 NTU. Is raw water quality data available from the existing site that gives an indication of the duration, frequency, and measurements associated with high turbidity events, as well as average turbidity information?
A50: Below is a plot of historical monthly average turbidities in the water coming from Reeder Reservoir, the principal water supply for the Ashland WTP. The maximum 2,000 NTU turbidity represents a potential future condition for a range of changed reservoir operations that will not be in place until the new water treatment plant is operational.
Q51: Addendum 2 states T-7701 is getting provided by others. Can you confirm if everything within the Sodium Carbonate Feed Skid boundary on 000Y625 is also by others.
A51: The Sodium Carbonate system is intended to be provided by a single system provider, reference Section 46 33 50.
Q52: In spec section 33 16 25 Welded Steel Storage Tank, it references spec section 26 42 13 for the Sacrificial Anode Cathodic Protection System. However, spec section 26 42 13 does not reference the Welded Steel Storage Tank spec section. There is spec Section 26 42 19 “Cathodic Protection System for Elevated Storage Tank”, and this spec section DOES reference spec section 33 16 25. Please clarify what spec section applies.
A52: See Changes to Specifications for revisions to Section 33 16 25.
Q53: The contract drawings show sample probes installed in accordance with Detail 1 on Sheet 000D502. The detail indicates that the sample probes are to be furnished without integral check valves; however, we were unable to locate an acceptable manufacturer or model number, probe material, diameter, insertion length, tip configuration, or confirmation that an isolation valve is included with the probe. Please provide the required manufacturer and model, material, diameter, process connection, insertion length, and tip configuration for the sample probes.
Please also confirm whether a separate isolation valve and check valve are required, and provide the applicable valve types, materials, sizes, and connection requirements.
A53: See Changes to Drawings for revisions to Drawing 000502.
Q54: Is specification 06 82 00 included by mistake? If not, could you please point us to the portion of the project that this specification would apply to? We could not find any FRP elements on the project.
A54: Section 06 82 00 is intended to be included in the project. Reference Detail 1 on 000S007, Detail 4 on 000Y022, and Detail 6 on 000E702.
Q55: Drawing 300D104/300D305 - Operations Building. On the backwash supply line between the two 90 elbows northeast of the building, immediately adjacent to BFV-5411, there appears to be either a dismantling joint or two gauges. This component is not shown on the P&IDs.
Please clarify what it is.
A55: See Changes to Drawings for revisions to Drawings 000Y627, 300D104, and 300D305.
Q56: Each chem tank is called out in both the FRP and Poly tank specs. Can all these tanks be supplied as either Poly or FRP?
A56: Correct.
Q57: Drawing 300D304 - Operations Building. Section View A shows 3" and 6" FE callouts, but we can’t locate these lines anywhere else in the drawing set. Please confirm whether they exist.
A57: See Changes to Drawings for revisions to Drawings 300D304, 000Y607, 000Y608, 000Y609, and 000Y610.
Q58: 000Y001 - Instrumentation Legend. Injection quills are shown boxed throughout the P&IDs, consistent with the instrumentation legend. Please clarify whether the general contractor or vendor will be supplying the injection quills.
A58: Contractor to coordinate with suppliers per Section 46 33 46 for procurement of injection quills.
Q59: Section 40 73 00 specifies Type 316 stainless-steel wetted components for the pressure gauge and requires an isolation valve at the process connection. Section 40 05 63 specifies stainless-steel construction for metallic ball valves through 3 inches. However, the material and connection arrangement for the nipple, fittings, and transition between the ductile-iron process piping and the stainless-steel gauge assembly are not clearly identified. Please clarify the required materials and connection arrangement for the complete pressure-gauge tapping assembly at ductile-iron piping, including the process tap, nipple, fittings, isolation valve, and transition to the gauge. Please also confirm whether dielectric isolation is required between the ductile-iron piping and stainless-steel components.
A59: See Section 40 05 00 for dielectric piping requirements. See Changes to Drawings for revisions to Drawing 000D505.
Q60: I am not sure what some of the lines on this section view of the 24” BWS line on sheet 300D305 represent? I don’t see anything represented on sheet 00y627.
Can you clarify what may be required here.
A60: See previous response, these are double door check valves.
Q61: PRV-3000 is shown in Yard Vault YV-3001 as a 2-inch valve on the OZW system. Based on the P&ID arrangement, the valve appears to discharge to atmosphere; however, we were unable to locate valve-specific requirements confirming its intended function. Please clarify whether PRV-3000 is intended to be a pressure-relief valve, pressure-reducing valve, or another type of pressure-regulating valve. Please also provide the applicable specification section and confirm the required manufacturer and model, materials of construction, inlet and outlet connections, pressure class, set pressure, relieving capacity, discharge-piping requirements, and ozone-compatible internal materials. If applicable, please also confirm whether any other PRV-tagged valves on the project are intended to provide pressure-relief service.
A61: See Changes to Drawings for revisions to Drawing 100D101.
Q62. Soda ash tank T-7701. Addendum 2 adds T-7701 to Section 43 41 45 and also adds the tank to the Sodium Carbonate Feed Skid boundary on Drawing 000Y625. Please confirm which supplier provides it.
A62. The Sodium Carbonate system is intended to be provided by a single system provider, reference Section 46 33 50.
Q63: The drawings indicate that the Contractor is to route the instrument-air piping in the field.
We understand that the final routing and fitting configuration will be determined based on actual field conditions. However, the branch sizes and typical connection requirements from the 2"-IA main to the individual pneumatic actuators are not identified. This information is needed to obtain pricing for the required piping, fittings, valves, and actuator connection components.
Please provide the following general design criteria:
1. Required branch size to each pneumatic actuator.
2. Required sizes for any intermediate subheaders serving multiple actuators.
3. Typical connection requirements at each actuator, including isolation valve, union, filter-regulator, pressure gauge, solenoid valve, tubing transition, and related fittings.
4. Instrument-air piping and fitting material requirements.
5. Identification of components furnished with the valve/actuator assemblies versus components to be furnished by the Contractor.
6. Confirmation of which instrument-air piping, valves, and fittings are subject to AIS requirements.
Final routing and fitting quantities will be coordinated in the field as indicated on the drawings.
Please provide the above information so the appropriate materials and connection assemblies can be included in the bid.
A63:
1. Coordinate size with actuator procured.
2. Subheaders shall be sized to allow for adequate flow to all actuators.
3. Each valve shall have an individual isolation valve, union, tubing transition, and required fittings for connection to the actuator to allow for maintenance of actuator. Provide filter-regulators as required by actuator supplier. Provide two pressure gauges, one at the furthest instrument air connection and one at the nearest actuator connection to the compressor system.
4. Piping per Sections 40 05 00 and 40 05 23.
5. Coordinate with actuator supplier.
6. AIS requirements are applicable to the project as a whole so the requirements will apply to all instrument-air piping, valves and fittings.
Q64: The P&IDs show flexible couplings or expansion joints at the piping connections to the sodium hypochlorite storage tank T-7401 and caustic storage tank T-7501. Specification Section 43 41 43 also requires an expansion joint at each tank nozzle. However, the expansion joints are not clearly shown on the corresponding process plans or tank details. Additionally, the tank vents are designated CHV on the drawings, while Specification Section 40 05 00 identifies Chemical Vent as CHY under Piping System 7 and specifies Schedule 80 PVC. The sodium hypochlorite and sodium hydroxide liquid piping is included under Piping System 8 and specified as Schedule 80 CPVC. Please clarify the following:
1. Confirm that an expansion joint is required at each nozzle connection on tanks T-7401 and T-7501, including fill, discharge, overflow, drain, and vent connections.
2. Identify the required expansion-joint locations on the applicable plans and tank details.
3. Confirm whether the expansion joints are furnished with the tanks or furnished separately by the Contractor.
4. Confirm the required expansion-joint flange material for each connection, including PVC versus CPVC.
5. Confirm that the CHV piping connected to the sodium hypochlorite and caustic tank vents is Schedule 80 PVC, rather than Schedule 80 CPVC.
6. Confirm that CHV on the drawings and CHY in Specification Section 40 05 00 refer to the same Chemical Vent system.
7. Please provide or identify the applicable typical tank-nozzle connection detail, including expansion joint, companion flanges, gaskets, limit rods or belts, supports, and any required isolation valves.
A64:
1. Correct.
2. At the connection to the tanks or as near as practicable.
3. Expansion joints are anticipated to be furnished by the Contractor.
4. See Reference 40 05 00 2.3 J.
5. Correct.
6. Did not see a reference to CHY in 40 05 00. 40 05 00 3.13 D.1.a.4) is intended to be
CHV.
7. Expansion joints and isolation valves per P&IDs. Expansion joint per specification with applicable companion flanges, gaskets. Supports per specifications. Limit rods or belts are not anticipated as these connections are to an atmospheric tank and piping will be supported separately.
Q65: The chemical-system P&IDs identify the tank overflow piping as COF (Chemical Overflow), while the corresponding connections on the chemical tank plans and details are identified as OF (Overflow). The line sizes and connection locations appear to correspond;
however, the different designations create uncertainty regarding the applicable piping system and material. Please confirm the following:
1. The OF piping shown at the chemical storage tanks is the same piping identified as COF on the applicable P&IDs.
2. OF and COF do not represent separate piping systems or additional lines.
3. Whether the chemical tank overflow piping is to be furnished as Schedule 80 PVC under
Piping System 7 or Schedule 80 CPVC under Piping System 8, particularly at the sodium hypochlorite and sodium hydroxide storage tanks.
4. The required piping and fitting material for each chemical tank overflow line.
5. The required gasket and O-ring materials for each chemical service.
6. The required connection components at each tank overflow nozzle, including any expansion joints, flexible couplings, companion flanges, and restraint components.
A65:
1. 300D501 generically refers to the overflow, COF is applicable as listed on the P&IDs.
2. OF and COF do represent separate piping systems. OF is piping system 2 and COF is piping system 7. All chemical overflows are intended to be provided as COF piping system 7.
3. COF shall be furnished under piping system 7 as specified.
4. See previous responses.
5. See specification 40 05 00 2.13 D.1.c.1) for required gasket and O-ring materials for each chemical service.
6. No expansion joints or restraint components are required per P&IDs, flanges as required for connection to tank.
Q66: Drawings 300D102 and 300D301 show piping associated with the two Ballasted Flocculation System hydrocyclones; however, we have been unable to trace the complete routing and connections shown in the plans and sections to the applicable P&IDs. On Section C of Drawing 300D301, a 4"-PD line is shown at the bottom of each hydrocyclone. Each line appears to increase in size near the 90-degree bend and continue downward between the coagulation tanks. The piping may connect to the 6"-PD piping shown near the bottom of the section, but the size transition, vertical routing, and final connection are not clearly shown.
Drawing 300D102 provides a top view but does not show the complete connection or clarify the apparent size transition. Additionally, two lines at the top of the hydrocyclones on Drawing 300D301 are labeled 4"-PD. The associated keynote appears to reference vent piping routed through the roof, creating uncertainty as to whether these lines are intended to be process drains or hydrocyclone vents. The piping arrangement shown on the plans and sections also does not appear to match the applicable P&IDs. To help ensure the piping is accurately included in the quotation, please clarify the following:
1. Confirm the service and purpose of the 4"-PD connection at the bottom of each hydrocyclone.
2. Confirm whether each 4"-PD line increases to a larger size before the 90-degree bend.
3. If a size increase is required, please identify the final pipe size and the location and type of transition fitting.
4. Confirm whether the two hydrocyclone PD lines continue vertically between the coagulation tanks and connect to the 6"-PD piping shown near the bottom of Section C.
5. Identify the exact connection point, elevation, and fitting arrangement where each hydrocyclone drain connects to the 6"-PD system.
6. Confirm whether the two lines labeled 4"-PD at the top of the hydrocyclones are process-drain lines or vent lines.
7. Clarify the application of the keynote referencing vent piping through the roof and provide the correct line designation and size for each hydrocyclone vent.
8. Confirm the intended quantity, size, type, and location of all valves associated with the hydrocyclone PD and vent piping.
9. Please reconcile the piping shown on Drawings 300D102 and 300D301 with the applicable Ballasted Flocculation System P&IDs.
10. Please provide a revised section, isometric, or typical detail showing the complete piping arrangement for both hydrocyclones, including line designations, sizes, reducers, valves, fittings, elevations, vent terminations, and connections to the 6"-PD system.
A66:
1. 4”-PD callout in Section C 300D301 is incorrectly pointing at a 6” pipe. Each hydrocyclone has a 4” connection that header together into a 6” pipe. This is intended for process drainage from the hydrocyclone, also referred to as sludge discharge piping by some vendors.
2. Correct, see previous response.
3. 6”x4” wyes at base of hydrocyclones, 8”x6” reducer at bottom of Section C 300D301.
4. Correct.
5. 4” flange connection from hydrocyclone at approximate elevation of 2306.4’. Contractor to supply 4”-PD, (2) 4” 90-deg elbows, 4”x4” tee, 4” 45-deg elbow, 6”x4” wye per hydrocyclone.
6. Process drain, Vent lines tee off of the process drain lines at high point.
7. Modify each 4”-V callout from the ballasted flocculation tank hydrocyclones to “4”-CHV”.
8. See Reference 000Y606 as modified by addendum.
9. Bid to the best of your ability for a complete and functional system. Unable to incorporate minor clarifications at this time.
10. Bid to the best of your ability for a complete and functional system. Unable to incorporate minor clarifications at this time.
Q67: Drawing 300D305 shows an 18"-OF wall penetration at the Operations Building. The applicable P&ID appears to indicate that the 18"-OF line terminates at grade; however, we have been unable to locate the exterior portion of this line on the yard piping drawings or find a detail showing the final discharge arrangement. To help ensure the complete overflow piping is included in the quotation, please clarify the following:
1. Confirm the origin and intended function of the 18"-OF line shown on Drawing 300D305.
2. Confirm whether the wall penetration is intended to be an embedded wall pipe or another type of penetration assembly.
3. Provide the routing, length, slope, and termination elevation of the 18"-OF piping outside the Operations Building.
4. Identify the applicable piping material, joint type, and wall-penetration requirements.
5. Confirm the required termination arrangement, including whether the pipe is to:
• End flush with the exterior wall;
• Extend to daylight; Reference 001C204 and previous addendum.
• Turn downward; or
• Terminate at another structure or discharge location. Reference 001C204 and previous addendum.
6. Identify any required end treatment or appurtenances, including a flared end section, elbow, headwall, splash block, riprap, erosion protection, screen, flap gate, support, anchorage, or other components.
7. Please provide a revised yard plan, section, or detail showing the complete 18"-OF routing and termination.
A67:
1. Overflow box is the origin and the intended function is to convey excess water out of the structure in an overflow condition.
2. See embedded wall pipe reference detail 4 on 000D501.
3. Reference 001C204 and previous addendum.
4. OF as specified in 40 05 00.
5. Pipe is to extend to daylight and terminate at another structure or discharge location.
Reference 001C204 and previous addendum.
6. Reference 001C204 and previous addendum for required end treatment or appurtenances.
7. Reference 001C204 and previous addendum for revisions showing complete 18"-OF routing and termination.
Q68: 26 29 23 – 4, 2.1 A lists a PowerFlex 753 with no ‘or equal’ and 2.2 B specifies that VFD shall have active front end technology. To our knowledge, the PowerFlex 753 series drives do not have active front end technology. Can you clarify if drives should be PowerFlex 755TL series with ‘active front end technology’ or if the PowerFlex 753 without ‘active front end technology’ is acceptable?
A68: No active front end is required for VFDs under 200HP. Larger VFDs should be low harmonic or have harmonic filtering to reduce below IEEE519. Smaller VFDs should have line and load reactors and/or dc chokes, or passive filtering to limit the harmonics.
Q69: 26 29 23 – 9, 2.5 D requires active harmonic filters at each point of common connection as defined by 2.5 C. The one-line diagrams in the drawings do not show active harmonic filters at the points of common connection. Can you verify if active harmonic filters are required at each point of common connection?
A69: Active Filters are not required. Harmonic filtering to be done at each VFD with passive filters like reactors on lines and loads.
Q70: Spec 26 05 33 – 3.2 – 7 requires providing 20% spare conduits where routed in underground duct banks. Does that imply including an extra 20% of conduit length? Or is it in reference to quantity of raceways? It also calls for (3) spare 1” conduits stubbed and capped next to major pieces of equipment. What is the criteria for defining a major piece of equipment?
And are these additional conduits referenced anywhere else where this spec would be redundant?
A70: 20% spare conduits. i.e. When there are 8 conduits in a ductback, provide 2 additional spare conduits. If the ductbank is routed from Switchboard to generator, then the spare conduits would be stubbed up near the switchboard and generator at their respective ends. If the drawings already show a spare conduit, then additional spares per the 20% requirement would not be needed.
Q71: Please confirm whether the two new 2-inch PVC fiber-optic conduits extending from the existing pullbox to the plant server room may be direct-buried to match the existing fiber facilities or must be concrete-encased under 004E101, General Note 2. Please define the start/end points of any encased segment, the transition detail at the existing pullbox, and any required power/fiber separation.
A71: Fiber optic to be direct buried from existing pullbox to the site server room.
Q72: Please identify the intended station-to-station limits of existing conduit removal and reinstallation along the 24-inch raw-water bypass shown on 800C101. May the relocated existing two 4-inch conduits remain direct-buried in the proposed common trench, or is concrete encasement required? Please provide a typical shared-trench section, clearances, conductor replacement limits, and required sequencing for de-energization and return to service.
A72: Exact location of existing electrical is not known. 4” conduits in common trench is acceptable, provided there is a bench and conduits are a min. of 24” below grade. If existing conduits were direct buried, then provide direct buried. If encased in concrete, then re-encase after reinstallation.
Q73: Please identify the locations where new underground electrical duct banks pass above process yard piping and confirm the required minimum vertical separation, allowable field route deviations, and reinforced concrete encasement limits at each crossing. Please confirm whether reinforcement extends 10 feet to either side of each such crossing and whether any detail other than 000E701/Detail 3 governs.
A73: Locations of where ductbanks pass above process yard piping or below to be determined in the field based on final conduit routing. Conduits shown are diagrammatical and may be adjusted in the field for optimal conditions. Conduits may go above or below depending on conditions. Utilize detail 3 for reinforced ductbanks. 10’ on either side is acceptable but should be looked at on a case by case basis.
Q74: Please confirm whether all duct banks beneath roads, access roads, and parking pavement are required to be reinforced concrete-encased notwithstanding the DB legend and §3.3.A.1.b(1). Where reinforcement is required, please identify start/stop limits and confirm whether reinforcing extends 10 feet beyond each side of each crossing.
A74: All duct banks under roads, access roads, and pavement shall be reinforced concrete encased. If ductbank is crossing main road, provide reinforcement. 10’ on either side is sufficient.
Q75: Please clarify whether the duct bank referenced by Keynote 15 on Drawing 004E101 is to be installed as direct-buried conduit per Detail 1/000E701 or concrete-encased conduit per General Note 2 and Detail 2/000E701. Please issue a revised callout or marked-up alignment identifying the governing installation detail and limits of any transition.
A75: Direct buried is acceptable. Conduit shall be a min of 48” below grade for primary conduits.
Q76: Are there any areas that are classified as ‘wet, corrosive to metals’?
A76: Refer to drawing 100G001. Pretreatment building as corrosive areas near the tanks. Same with the chemical rooms. Around certain tanks are considered corrosive.
Q77: Please define the area(s) requiring the Cathodic Protection (CP) System. I have several vendors looking all over the site to apply CP protection to:
A77: The cathodic protection system is to protect the water storage tank per 26 42 19. Section 26 42 13 is to be deleted. See Change To Specifications for revision.
Q78: Generator: Is the Roof Mounted Load Bank, sized to 50%, correct in the specifications?
There is no dedicated breaker listed in the One-Line. Suggestion: An inline docking station and pad mounted load bank would be more cost effective.
A78: Load bank is radiator mounted, sized at 50%. Load bank to supplement generator when lightly loaded. Load bank should come with breaker and be included with the load bank, supplied by the generator manufacturer.
Q79: Site Electrical 004E100: Fiber Optic From the existing pull box to the Data Rack requires
(2) 2” PVC Conduits. What is the conduit and fiber optic requirement for all other FO labeled lines running throughout the site?
A79: 2” PVC conduits for the main fiber optic cable from off site. All other fiber optic conduits should be sized per the conduit and cable schedule. Where size not shown, assume minimum of 1” PVC conduit.
Q80: 26 05 00, 3.4 A. ‘Material Application Schedule’ conflicts with 26 05 33 3.3 A. as they pertain to Instrumentation wiring;
• 26 05 00, 3.4 A. 3. Instrumentation cables: Metallic raceway except nonmetallic may be used underground;
• 26 05 33 3.3 A (Last row in table) ‘Underground, Under Slab or concrete encased’, NOTES Column: ‘Use PVC-GRS for signal/instrumentation wiring’.
Please clarify what conduit type is required for underground signal/instrumentation wiring.
A80: Where a minimum of 12” separation is maintained between power and signal, PVC conduit acceptable. The only time PVC-coated required is when separation cannot met, min of 12”, or next to MV power.
Q81: Is the intent for fire-alarm/suppression information to integrate directly into plant SCADA, or may the fire system be integrated through the building-management platform with selected supervisory information subsequently provided to SCADA?
A81: Per specification section 28 46 00 – Fire Detection and Alarm, Parts 1.1-A.5 and 1.4-B-17, a Digital Alarm Communicator Transmitter (DACT) shall be used as a global annunciator and shall report all signals from all Fire Alarm Control Units on the fire alarm network. SCADA and the building-management system shall not be tied into the fire alarm system.
Q82: 40 62 16 – 5, 2.4 A lists the Stratus Server and requirements. Does HDR have a minimum storage capacity and RAID type?
A82: Storage Capacity: 4 x 2 TB Enterprise SSDs. RAID 10. Minimum 4 TB raw capacity.
Approximately 2 TB usable capacity.
Q83: Note 8 on page 000C008 says to install the sediment traps per the top length and width as noted on the plans. Detail RD 1065 on sheet 000C016 shows measurements from the bottom of the trap. Please confirm the intent is for the dimension to be from the top of the excavation and not the bottom.
A83: We confirm that the dimensions are from the top of the excavation and not the bottom.
Q84: On Sheet 001C108, the MSE wall detail calls out a top of wall elevation of 2985 and a top of footing elevation of 2295, resulting in a 690-foot difference. This appears to be a typo. Please confirm the correct elevations for both the top of wall and top of footing.
A84: 001C108 was updated in Addendum No. 3.
Q85: Sheet 001C109 States Mse wall footings are by others. Who is others?
A85: Footings are by Contractor. See Changes to Drawings for revisions to drawing 001C109.
Q86: Topo grades lines appear to have a 10 ft deviation through the road section. Please verify correct grading lines on on incoming access road, east of the backwash waste basin A86: See updated drawings issued in Addendum No. 3.
Q87: We are not finding information regarding how unsuitable soil and buried debris will be handled. The risk to the contractor to estimate an unknown quantity to be assumed is not clear.
Would the Engineer/City consider adding a separate unit price bid item item to address unsuitable fill removal, and replacement?
A87: We are amending and reissuing 00 43 13 – Bid Form and 01 22 00 – Measure and Payment. See Change To Specifications. The revisions will include separate unit price bid items for these items.
Q88: We are not finding information regarding how rock will be handled. The risk to the contractor to estimate an unknown quantity to be assumed is not clear. Would the Engineer/City consider adding a separate unit price bid item item to address rock removal, and replacement?
A88: See response…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .