About this file

This Addendum No. 3 is issued by the City of Ashland, Oregon for the Ashland Creek Water Treatment Plant construction project. The addendum addresses clarifications and corrections to prior bidding documents dated October 26, 2026, and consists of 15 pages with attached modified drawings and specifications. Prospective bidders must acknowledge receipt of this addendum in their bid forms and on the last page to avoid disqualification. The addendum resolves 35 bidder questions regarding piping materials and specifications, equipment requirements, system configurations, and design clarifications. Key modifications include confirmation that SD piping up to 12-inch diameter shall be Schedule 80 PVC with solvent-welded joints, larger diameter SD piping shall be Schedule 40 PVC with solvent-welded joints, DRN piping is designated as PD (Process Drain), ozone system sidestream flow rate upper limit is 300 GPM, and various drawing and specification corrections related to electrical systems, security updates, and mechanical equipment. The addendum also corrects typographical errors, removes the temporary ozone system requirement, clarifies material specifications for buried ductile-iron piping encasement, and provides updated as-built drawings for the existing WTP Chemical Building.

The addendum reflects ongoing coordination between the bidders and the engineer to ensure clarity and constructability of the design. Significant technical clarifications address polyethylene encasement requirements per ANSI/AWWA C105/A21.5-10 standards, stainless steel passivation procedures for oxygen and ozone service components, field welding protocols with radiographic inspection requirements, and pressure and flow rate specifications for various system components. Multiple drawing revisions address DRN-to-PD designation changes, removal of non-existent piping elements, electrical security updates across multiple building areas, and correction of HVAC equipment airflow specifications. The document establishes that the City of Ashland Electric will provide and install the transformer while the contractor is responsible for fiber optic cabling, and confirms that maintenance equipment and laboratory glassware must be furnished by the contractor. Bidders are required to carefully integrate these addendum changes into their proposals and cost estimates to ensure compliance with the modified contract documents.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City Project No. 2018-20

00 90 13.1 -

Addendum No. 3

SECTION 00 91 13

ADDENDUM NO. 3

Date of Issue: OCTOBER 26, 2026

To all prospective bidders of record on the Work titled: City of Ashland, OR Water Treatment Plant

The Drawings and Project Manual including Specifications are modified as follows. This Addendum forms a part of the Contract Documents and modifies the original documents.

Acknowledge receipt of this Addendum in the space provided in the BID FORM and on the last page of the Addendum. Failure to do so may subject the Bidder to disqualification.

This Addendum consists of 15 pages, attached modified Drawings and Specifications, and other referenced attachments.

Pierre Kwan, PE HDR Engineering, Inc.

REVISIONS AND CLARIFICATIONS TO PRIOR ADDENDA

1. Addendum No. 2, Item AD2-D53 indicated that Drawing 300E601 was replaced with a revised drawing as part of the addendum. This statement was an error. Drawing 300E601 was not replaced. The current version of this drawing is the one in the original bid documents.

2. Addendum No. 2, Q19 was not fully repeated in the addendum. The full question is as follows: “City Prequalification Form - Do subcontractors need to fill this out or is this for GC only?”. Answer A19 does not change.

BIDDER QUESTIONS

Q1: The supplied I/O attachments appear to reference an October 2023 document, while the project drawings and specifications are dated 2026. Please confirm that these attachments are current and issue a coordinated instrument index, I/O list, and PLC card/panel schedule for bidding.

A1: The 40 63 43 Attachment A & B included in the bid set are current. An “instrument index” is not available; instead refer to the schedules in the various instrumentation specification sections.

Q2: Please provide as-built drawings for the existing WTP Chemical Building.

A2: See Attachments for WTP Chemical Building as-built drawings.

Q3: The civil plan shows an unidentified pipeline extending from the building area and entering the north side of MH06. This pipeline is located below the 12"-DRN alignment that begins at Station 0+00 and is separate from the labeled 12" SD, 18" SD, and 24" SD pipelines connected to MH06. Please clarify the following for the unidentified pipeline:

• Pipe size and service designation;

• Pipe material and applicable piping system;

• Point of origin;

• Required alignment and invert elevation;

• Connection and penetration requirements at MH06; and

• Applicable profile, detail, and specification references.

A3: Pipe does not exist. See Changes to Drawings for revisions.

Q4: Please confirm that PVC is acceptable for all SD piping shown on the Contract Drawings, including the following sizes: 4-inch SD, 6-inch SD, 8-inch SD, 10-inch SD, 12-inch SD, 18-inch SD, 24-inch SD. Please identify the required PVC pipe standard and wall classification for each applicable size, including whether the pipe is to be: Schedule 40; Schedule 80; a specified SDR, ASTM D2729 DWV, or another specified PVC gravity sewer pipe classification. Please confirm the required fitting standard and pipe stiffness or pressure classification, as applicable, for each pipe size. Please confirm whether the required joints are to be: solvent-welded, elastomeric gasketed, or another specified joint system. If elastomeric gasketed joints are required, please identify the applicable pipe, joint, and gasket standards. Please confirm whether Schedule 40 or Schedule 80 PVC is intended for the smaller building storm drain connections, with gasketed SDR PVC intended for the larger buried yard storm drain piping. Please confirm that the clarified PVC pipe and fitting requirements apply to connections at storm drain structures, catch basins, manholes, cleanouts, building connections, culverts, and outfalls, unless otherwise specifically detailed.

A4: SD piping up to 12-inch shall be Schedule 80 PVC with solvent-welded joints and fittings.

SD piping larger than 12-inch in diameter shall be Schedule 40 PVC with solvent welded joints and fittings.

Q5: Section 40 05 23 requires stainless-steel pipe, tubing, and fittings to be immersion pickled after manufacturing and fabrication and before shipping. Due to the size of the OZW piping assembly, it cannot be transported to the site as one complete fabricated unit. Please clarify whether the OZW assembly may be divided into transportable sections using additional flanged joints. If field butt-welded shipping joints are required, please provide the required cleaning, pickling, passivation, inspection, and acceptance procedure for field welds completed after the shop immersion-pickling process.

A5: The OZW assembly may be divided into transportable sections that will be assembled using field butt welds. See Changes To Specifications for the field welding procedures.

Q6: Please also confirm that the oxygen-service cleaning requirements of Section 46 31 59 do not apply to OZW liquid piping.

A6: 46 31 59 does not apply to OZW liquid piping.

Q7: What pipe material and specification schedule apply to the 8-inch and 12-inch DRN piping?

A7: See Changes to Drawings for the following referenced drawings: 000Y613, 002C104, 002C303, 002C504, 400D101, 400D301.

Q8: Please provide or confirm the requirements for both buried and exposed DRN piping, including: pipe material and pressure class, interior lining, exterior coating, fitting material and applicable standard, joint and restraint requirements, gasket and bolt requirements, any special requirements at structures, vaults, and equipment connections.

A8: See Section 40 05 19 of the specifications.

Q9: Is DRN intended to follow the requirements for PD, Process Drain, under System 2 of Specification Section 40 05 00? If so, please confirm that the buried DRN piping is to be ductile iron, Class 52, with the associated System 2 lining, coating, fittings, joints, and restraint requirements.

A9: Yes, DRN should be PD.

Q10: Is one FE/FIT-4703 flow meter required on the combined 12-inch DRN discharge from the Backwash Waste Basins?

A10: Yes, one flow meter on the 12-inch DRN discharge. Shown on 000Y613 in Vault YV-4700 and Detail 3 on sheet 002C104.

Q11: Is the associated flow meter vault required at the location shown, even where the flow meter and vault are not depicted on other related piping plans or details?

A11: YV-4700 shall be located as shown on 002C104.

Q12: Please identify the controlling drawing or detail for the complete FE/FIT-4703 installation, including the vault, piping, fittings, spool pieces, valves, supports, and other required appurtenances.

A12: See revised drawing 002C504.

Q13: Drawing 002C504 indicates “Watertight EPDM Boot with SST Clamps” at piping penetrations on the exterior of the yard vaults. The Contract Documents do not appear to identify the required manufacturer, model, boot configuration, performance criteria, or installation requirements. Please clarify the design.

A13: Boot is deleted and install modular mechanical seals instead. See Changes To Drawings.

Q14: Detail CD352 on Drawing 002C501 indicates a “Flex Joint (Typ.)” adjacent to the DRN manhole connection. Please clarify the intended flex-joint assembly and provide the applicable requirements.

A14: Detail CD352 is replaced with ODOT detail RD352 which does not have a flex joint. See Changes To Drawings.

Q15: The Clearwell drawings show interior piping and associated assemblies with slip-on flanges, fabricated plate fittings, wall pipes, and welded components. These details appear to suggest fabricated steel construction rather than ductile iron. Please clarify the required material for the Clearwell interior piping and fabricated assemblies. If fabricated steel is intended, please also confirm the required pipe thickness, flange requirements, interior lining, exterior potable-water immersion coating, and transition point to the buried ductile-iron piping.

A15: Piping is fabricated steel per Section 40 05 00-3.13-A.2.a.2). Piping thickness is noted in 40 05 24-2.4-A.4. The coating is per 09 96 00-2.3-A. The transition between the buried ductile iron piping and the fabricated steel is immediately outside of the tank.

Q16: Does Rooms 300-104 or 300-105 require explosion-proof devices?

A16: No.

Q17: The contract drawings show several cleanouts on the 6-inch sanitary sewer line and one cleanout on the 8-inch sanitary sewer line; however, we were unable to locate a corresponding cleanout detail in the bidding documents. Please provide the applicable cleanout detail and confirm the required pipe and fitting materials, cleanout size, branch configuration, plug or cap type, access box or cover, and surface termination requirements for the 6-inch and 8-inch sanitary sewer cleanouts. If City of Ashland Standard Detail CD362 is intended to apply, please confirm its applicability and identify any required modifications for this project.

A17: City standard detail CD362 on drawing 002C523 is now replaced with ODOT standard detail RD362. This detail shall be used for all cleanouts for this project. See Changes To Drawings.

Q18: Section 46 31 54 requires the Ozone System Supplier to provide a temporary system in the event of a malfunction that results in the system failing to meet its firm capacity requirements. While we fully understand and accept our responsibility to meet the specified performance requirements, and to make any necessary repairs or modifications to ensure the system performs as intended, we are concerned about the requirement to provide a temporary system. Temporary ozone generation systems of this capacity are not readily available, and providing one would be extremely difficult, if not impractical. In our experience, this is not a typical requirement for municipal ozone generation equipment. We would respectfully request that the temporary system requirement be removed from Section 1.7.D. We are comfortable retaining the obligation to correct any equipment or performance deficiencies under the warranty.

A18: Article 1.7-D of 46 31 54 is deleted. See Changes To Specifications.

Q19: Where are the additional available laydown areas mentioned at the pre-bid meeting?

A19: See figure below.

Q20: We have questions about ozone sidestream injection system in Section 46 31 54. Our designs will balance sidestream water flow rates, suction requirements, main plant flow ranges, ozone dosage ranges, ozone gas concentrations, ozone gas pressures and other variables to optimize ozone transfer efficiency, plant/dosage turn down, and sidestream flow rates. In order to evaluate these variables, we need a better understanding of the specific constraints on the project with respect to the sidestream system. Additionally, we believe there are ways to value engineer the current Skid design if you are open to a discussion.

A20: Specification Section 46 31 54-1.2-D states that “Should the OSS [Ozone System Supplier] find it necessary or desirable to deviate from specific design aspects detailed in the Contract Documents to meet the performance requirements, the OSS shall clearly state all deviations in the shop drawing with Contract Document references along with the reason for each deviation.”

Q21: The Table in 46 31 54-Table 2.2.A states a 2.5 mg/l Maximum Transferred Dose, but elsewhere (Subsection 2.10.B.1 for example) states 2.5 mg/l as the Maximum Applied Dose.

Can you confirm if 2.5 mg/l should be interpreted as the Maximum Applied or Transferred Dose?

A21: This is the transferred dose. See Changes To Specifications for changes in the text.

Q22: 46 31 54-2.10.C.2.b defines the Sidestream Liquid Pressure as 50 PSI. Sheet 000G007 shows 2,419.75 ft just upstream of the Automatic Flow Control Valves, when the Strainers are Dirty, while the Injection Skid is installed on a floor with an elevation of 2,286.25 ft (Sheet 100D301), resulting in a difference of 133.5 ft (57.8 PSI). We are assuming 50 PSI is being used to account for any frictional or other pressure losses between the Mainline and the Injection Skid Water Inlet. Is our understanding correct?

A22: This is correct.

Q23: 46 31 54-2.10.C.2.e states an Ozone Gas Pressure of 25 PSIG. This seems higher than normal. Please confirm that this Gas Pressure can be provided to the Injection Skid’s Gas Inlet Flange?

A23: See response A20 of this addendum.

Q24: 46 31 54-2.10.E.5.b states a Mainstream Liquid Pressure of 22 – 27 PSI. Using a Pipeline Flash Reactor Centerline Elevation of 2,284.08 ft (Sheet 100D301), we would estimate a Mainline Pressure of 10 PSI (23 ft), as measured at Pipeline Flash Reactor Centerline, when looking at the Hydraulic Grade Profile for the Mainline just upstream of the Ozone Pipeline Contactor showing 2,307.08 ft (Sheet 000G007). It appears that the stated 22 – 27 PSI in the written specifications may be a typo and it should have been stated as 22 – 27 ft. Please confirm the actual estimated Mainline Pressure as measured at Pipeline Flash Reactor Centerline (2,284.08 ft) would be 10 PSI (23 ft)?

A24: This is a typo. See Changes To Specifications for the correction.

Q25: Section 46 31 54 – the Sidestream Flow Rate is limited to 180 GPM (2.10.B.2) and 300 GPM (2.10.C.2.d). Since a Sidestream Pump is not being used so there is no impact on energy consumption, is there a reason why you would need to limit the Sidestream Flow Rate? If the sidestream flow rate is limited, please provide the upper flow limit.

A25: The upper limit is 300 GPM to control water velocity, and minimize pipe wear and erosion.

See Change To Specifications.

Q26: Section 46 31 54 – Our understanding is that even though other parts of the Plant is being designed to accommodate 9 MGD, the Ozone Dissolution System is only being designed based on a Mainline Flow Rate of 7 MGD, is this correct?

A26: This is correct.

Q27: 46 31 54 – regarding the Injectors, is the configuration 2 duty/0 standby, or 1 duty/1 standby configuration?

A27: The configuration is one duty and one standby.

Q28: LVR-3009 is listed at 710 CFM on the equipment schedule and annotated at 7,360 CFM on the HVAC plan. Please confirm the required airflow and correct the plan or schedule as needed. Please also confirm the associated MAU-3002 and EF-3006 airflow requirements.- Refs: 000M603 p. 49; 300M302 p. 300 A28: LVR-3009 is to be rated for 710 CFM. See Changes To Drawings for the correction.

Q29: The supplied I/O attachments appear to reference an October 2023 document, while the project drawings and specifications are dated 2026. Please confirm that these attachments are current and issue a coordinated instrument index, I/O list, and PLC card/panel schedule for bidding.- Refs: Section 40 63 43, Attachment A/B, PDF pp. 1563–1575 A29: The 40 63 43 Attachment A & B included in the bid set are current. An “instrument index” is not available; instead refer to the schedules in the various instrumentation specification sections.

Q30: Please provide as-built drawings for the existing WTP Chemical Building.

A30: As-built drawings for the full site are provided with this addendum.

Q31: Who is responsible for supplying and installing the fiber optic cable/wiring?

A31: The Contractor will provide the fiber optic cabling.

Q32: Is Ashland Elec responsible for supplying and installing the transformer?

Q32: Yes, Ashland Electric will provide and install the transformer.

Q33: Detail 3 on Sheet 002C104 shows the proposed irrigation piping connecting to the existing 8-inch IRR line. We were unable to locate information identifying the existing pipe material, outside diameter, pressure class, or joint type. Please clarify the existing pipe characteristics and the intended connection method so that the appropriate transition coupling, fittings, and restraint system can be provided.

A33: The existing 8-inch IRR is C900 PVC pipe, pressure class 235 psi (DR 18).

Q34: Section 40 05 19 requires polyethylene encasement for the buried ductile-iron piping in accordance with AWWA C105/A21.5; however, the required polyethylene material is not fully identified. Please confirm the required polyethylene type, grade, thickness, color, installation method, and acceptable manufacturers or basis-of-design product. Please also confirm whether enhanced corrosion-control polyethylene, such as V-Bio, is required and whether the listed Chase Chasekote 750, Kendall Polyken 900, and 3M Scotchrap 50 products are intended only for securing and repairing the polyethylene encasement.

A34: Pipe to meet ANSI/AWWA C105/A21.5-10

• 8 mil Black Polyethylene Pipe Encasement

• AWWA C105/A21.5-10 Printed

• Virgin Polyethylene

• Install Polywrap according to the latest AWWA or DIPRA guidelines.

Basis of design product – Christy’s Polywrap (Polyethylene Encasement Tubing) Enhanced corrosion-control polyethylene is not required.

Listed tape products are intended for securing and/or repairing the polyethylene encasement.

Q35: Can you confirm that the city is looking for the contractor to purchase all the tools in the Maintenance Equipment section 11 24 28, Projection Screens 11 52 13, & Laboratory Glassware 1153 11 sections.

A35: The Contractor is to furnish the maintenance equipment and laboratory glassware as listed in the specification sections. The projection screen was removed in Addendum No. 1.

CHANGES TO DRAWINGS

Item AD3-D01 Drawing 000Y613 Replace 12-DRN with 12-PD

Item AD3-D02 Drawing 001C202 Remove remnant West pipe entering MH06 from backwash waste basin.

Item AD3-D03 Drawing 001C206 Remove remnant West pipe entering MH06 from backwash waste basin.

Item AD3-D04 Drawing 001C207 Remove remnant West pipe entering MH06 from backwash waste basin.

Item AD3-D05 Drawing 002C104 Replace 12-DRN with 12-PD

Item AD3-D06 Drawing 002D303 Replace 12-DRN with 12-PD

Item AD3-D07 Drawing 002C504 Replace 12-DRN with 12-PD

Item AD3-D08 Drawing 400D101 Replace 12-DRN with 12-PD

Item AD3-D09 Drawing 400D301 Replace 12-DRN with 12-PD

Item AD3-D10 Drawing 000E002 Updated drawing. Updated conduit and cable schedule to include door security updates.

Item AD3-D11 Drawing 000E003 Updated drawing. Updated conduit and cable schedule to include door security updates.

Item AD3-D12 Drawing 000E004 Updated drawing. Updated conduit and cable schedule to include door security updates.

Item AD3-D13 Drawing 000E005 Updated drawing. Updated conduit and cable schedule to include door security updates.

Item AD3-D14 Drawing 004E101 Modified drawing. Updated equipment and conduits for front gate controllers.

Item AD3-D15 Drawing 100E101 Modified drawing. Updated door tags, conduits and equipment added for security updates.

Item AD3-D16 Drawing 100E102 Modified drawing. Updated door tags, conduits and equipment added for security updates.

Item AD3-D17 Drawing 100E603 Modified drawing. Updated one line diagram to show door conduits and equipment.

Item AD3-D18 Drawing 100E604 Modified drawing. Updated panelboard schedule to show door controller box power.

Item AD3-D19 Drawing 300E101 Modified drawing. Updated door tags, conduits and equipment added for security updates.

Item AD3-D20 Drawing 300E102 Modified drawing. Updated door tags, conduits and equipment added for security updates.

Item AD3-D21 Drawing 300E103 Modified drawing. Updated door tags, conduits and equipment added for security updates.

Item AD3-D22 Drawing 300E104 Modified drawing. Updated door tags, conduits and equipment added for security updates.

Item AD3-D23 Drawing 300E105 Modified drawing. Updated door tags, conduits and equipment added for security updates.

Item AD3-D24 Drawing 300E106 Modified drawing. Updated door tags, conduits and equipment added for security updates.

Item AD3-D25 Drawing 300E107 Modified drawing. Updated door tags, conduits and equipment added for security updates.

Item AD3-D26 Drawing 300E606 Modified drawing. Updated one line diagram for door security updates.

Door tags were updated and door circuits were added.

Item AD3-D27 Drawing 300E611 Modified drawing. Updated panelboard schedule to show door controller box power.

Item AD3-D28 Drawing 600E101 Modified drawing. Updated door tags, conduits and equipment added for security updates.

Item AD3-D29 Drawing 600E602 Modified drawing. Updated one line diagram for door security updates.

Door tags were updated and door circuits were added.

Item AD3-D30 Drawing 600E603 Modified drawing. Updated panelboard schedule to show door controller box power.

Item AD3-D31 Drawing 000A017 Replace drawing in its entirety with the attached.

Item AD3-D32 Drawing 000A019 Replace drawing in its entirety with the attached.

Item AD3-D33 Drawing 000G002 Replace drawing in its entirety with the attached.

Item AD3-D34 Drawing 000Y006 Replace drawing in its entirety with the attached.

Item AD3-D35 Drawing 000Y601 Replace drawing in its entirety with the attached.

Item AD3-D36 Drawing 000Y626 Replace drawing in its entirety with the attached.

Item AD3-D37 Drawing 000Y627 Replace drawing in its entirety with the attached.

Item AD3-D38 Drawing 000Y628 Replace drawing in its entirety with the attached.

Item AD3-D39 Drawing 001C101

Item AD3-D40 Drawing 001C103 Replace drawing in its entirety with the attached.

Item AD3-D41 Drawing 001C105 Replace drawing in its entirety with the attached.

Item AD3-D42 Drawing 001C106 Replace drawing in its entirety with the attached.

Item AD3-D43 Drawing 001C108 Replace drawing in its entirety with the attached.

Item AD3-D44 Drawing 001C109 Replace drawing in its entirety with the attached.

Item AD3-D45 Drawing 002C101 Replace drawing in its entirety with the attached.

Item AD3-D46 Drawing 002C103 Replace drawing in its entirety with the attached.

Item AD3-D47 Drawing 002C303 Replace drawing in its entirety with the attached.

Item AD3-D48 Drawing 002C501 Replace drawing in its entirety with the attached.

Item AD3-D49 Drawing 002C523 Replace drawing in its entirety with the attached.

Item AD3-D50 Drawing 0004E101 Replace drawing in its entirety with the attached.

Item AD3-D51 Drawing 100D101 Replace drawing in its entirety with the attached.

Item AD3-D52 Drawing 300M302 Replace drawing in its entirety with the attached.

Item AD3-D53 Drawing 600D101

CHANGES TO SPECIFICATIONS

Item AD3-S01 Section 40 05 23 Add the following text to 1.2-A.2:

“h. A967, Standard Specification for Chemical Passivation Treatments for

Stainless Steel Parts.”

Add the following text to 1.2.A:

“3. American Welding Society (AWS)

a. D1.6/D1.6M, Structural Welding Code – Stainless Steel

b. D10.4M/D10.4, Guide for Welding Austenitic Stainless Steel Piping and Tubing.

4. Nickel Development Institute (NiDI):

a. Publication 11 007, Guidelines for the Welded Fabrication of

Nickel-Containing Stainless Steels for Corrosion Resistant Services.”

Add the following text to 2.2:

“F. Passivation

1. For components/assemblies to be used in oxygen or ozone service:

a. Following the conclusion of fabrication operations, just prior to shipping, pickle/passivate all fabricated components per the requirements of ASTM A380 to remove dirt, weld heat tint, weld slag, free iron contamination, and other surface contaminants suffered during fabrication.

1) 100% of all completed welds and material shall be pickled/passivated.

2) Additional methods listed in ASTM A967 or NiDI 11 007 may be used for cleaning/passivation with written approval from the Engineer.

b. For assemblies containing crevices, joints, pockets, etc. that cannot be completely rinsed to remove passivating acids/chemicals following the passivating process disassemble prior to passivation, then reassemble after rinsing/drying.

c. Demonstrate that all free iron contamination has been removed from all stainless steel surfaces per one of the free iron test methods listed in ASTM A380.

1) Submit the free iron contamination test method to be used for approval in advance by the Engineer.

2) Test results must be approved in writing by the Engineer.

d. Protect passivated assemblies from additional carbon steel surface contamination or other contaminants during all subsequent packing, shipping, handling, and installation operations as described in ASTM A380.

2. Control and dispose solvents and acid cleaning solutions used by the fabricator according to all applicable federal, state, and local pollution control regulations.”

Replace the following text in 3.3-B:

“Welding” with “Shop Welding”

Add the following text to 3.3-B:

“8. Weld in accordance with AWS D10.4-86R and NiDI 11 007.”

Add the following text after 3.3-B.8 and renumber subsequent numbering accordingly:

“C. Field Welding

1. Limit the amount of field welding to the greatest extent possible.

2. Follow same requirements as in Shop Welding.

3. Clean and purge piping prior to welding.

4. Following completion of field welding, remove all dirt, weld heat tint, weld slag, free iron contamination, and other surface contaminants suffered during field welding.

a. For external corrosion control, follow the pickling/passivation/cleanliness requirements of Article 2.2- F of this Section.

b. Additional methods listed in ASTM A967, Section 8 may be used for passivation with engineer approval.”

Add the following text after 3.4-A:

“B. Examine 5 percent of the factory and field welds by radiography. For each weld that fails, inspect an addition 3 welds using the same method.

1. Radiographic method per AWS D1.6

2. Remove and replace failed welds.”

Replace all of the text in 3.5-A with the following “A. For piping used for oxygen or ozone service, clean in accordance with

Section 46 31 59.

B. For all other piping, clean in accordance with Section 40 05 00.”

Item AD3-S02 Section 46 31 54 Delete Article 1.7-D in its entirety.

Replace the word “applied” with “transferred” in the following sections:

• 2.10-B.1

• 2.11-F.1.b.1).a)

• 2.11-F.1.b.1).a).(1)

• 2.11-F.1.b.1).a).(2)

• 2.11-F.1.b.2).c).(1), two instances.

Replace “180 gpm” in 2.10-B.2 with “300 gpm”.

Delete “to 180 gpm” in 2.10-G.2.a.

City Project No. 2018-20 00 90 13.1 -

Addendum No. 3

Replace “psig” in 2.10-E.5.b with “FT of water”.

Item AD3-S03 Section 40 61 96 Replace “applied” in Appendix F, F.4-B.2.a.1) with “transferred”.

ATTACHMENTS:

1. Existing Water Treatment Plant Drawings, dated 1948 and

1995.

2. Addendum No. 3 Drawings

END OF ADDENDUM NO. 3

The Contractor shall acknowledge receipt of this Addendum No. 3 by signing in the space provided below and attaching it to their bid proposal.