This document is a draft Quality Assurance Surveillance Plan (QASP) for a Government-wide Temporary Duty (TDY) Lodging Solution solicitation. The QASP describes methods for monitoring contractor performance, defining acceptable quality levels, and identifying documentation and resources for performance assessments. Required performance standards include measures for customer engagement, room sales, cost savings, property ratings, and negotiated room rates compared to benchmarks. Acceptable quality levels for the first five measures are predetermined in the statement of work, while offerors will propose levels for the sixth measure in their proposals. Performance will be monitored through random sampling, 100% inspections, and periodic reviews, with semi-annual reports prepared by the Contracting Officer Representative summarizing surveillance results. The related solicitation is for the Government-wide TDY Lodging Solution 2.0 and was issued by the GSA Federal Acquisition Service with the identification number 47QMCB23N0007.

View the file

Other files

File Type Posted
47QMCB23N0007_DRAFT_REQUEST_FOR_QUOTE(RFQ)_RESPONSE_INSTRUCTIONS_2023-10-13.pdf PDF
47QMCB23N0007_Sample_SmartPay_Travel_Charge_Card_Data_File_2023-10-11.xlsx XLSX spreadsheet
47QMCB23N0007_Sample_FedRooms_Utilization_Report_FY23_Q3_2023-10-11.xlsx XLSX spreadsheet
47QMCB23N0007_Attachment B_ Hotel_Data_Elements_2023-10-03.xlsx XLSX spreadsheet
47QMCB23N0007_DRAFT_RFQ_Response_Instructions_2023-09-26.pdf PDF
47QMCB23N0007_RFQ_Government-wide_TDY_Lodging_Solution 2.0.pdf PDF
47QMCB23N0007_RFQ_Government-wide_TDY_Lodging_Solution 2.0.pdf PDF
47QMCB23N0007_DRAFT_REQUEST_FOR QUOTE_(RFQ)_RESPONSE_INSTRUCTIONS_2023-09-18.pdf PDF
47QMCB23N0007_Attachment_C_2024_FedRooms_Terms_and_Conditions_2023-09-18.pdf PDF
47QMCB23N0007_AttachmentH_DoD_Preferred_Sites_2024_2023-08-30.pptx PPTX presentation
47QMCB23N0007_AttachmentD_2024_DoDPreferred_Terms_and_Conditions_2023-08-30.pdf PDF
47QMCB23N0007_Attachment A_ Data_Reporting_Summary_Feedback_Guidance_2023-09-18.docx DOCX document
47QMCB23N0007_Attachment G_ Reported_Property_Sales_2023-09-18.xlsx XLSX spreadsheet
47QMCB23N0007_Attachment_I_Proposed_Funding_Model_Template_2023-08-30.xlsx XLSX spreadsheet
47QMCB23N0007_Attachment B_ Hotel_Data_Elements_2023-09-18.xlsx XLSX spreadsheet
47QMCB23N0007_Government-wide_TDY_Lodging_2.0_DRAFT_RFQ_Responsetemplate.xlsx XLSX spreadsheet
47QMCB23N0007_Attachment E_ Security_Requirements_2023-09-18.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY25 DRAFT

QUALITY ASSURANCE SURVEILLANCE PLAN

GOVERNMENT-WIDE TDY LODGING SOLUTION 2.0 - FEDROOMS

SOLICITATION 47QMCB23N0007

1 INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Governmentwide TDY Lodging Solution 2.0 for FedRooms statement of work (SOW). This plan sets forth the procedures and guidelines GSA will use with task order number 47QMCB23N0007 in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance, define the acceptable quality levels, and to identify the required documentation and resources to be employed to assess performance. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the contract. It is intended that this QASP will be finalized by the Government within 30 days of award based on the vendor’s proposal / quality assurance plan, and may be modified based on the performance of the vendor over the life of the contract. Within 60 days prior to option renewal determination, the Government will provide notification of any anticipated QASP changes applicable to the option period, and negotiation of these changes should be completed prior to initiating performance of the new option period.

1.2 Performance Management Strategy

1.2.1 The contractor is responsible for the quality of all work performed and achieving the objectives outlined in the contract. The contractor measures that quality through the contractor’s own quality control program, which will be documented in its proposal as a quality assurance plan. The plan will include a performance management system with processes to assess and report its performance to the designated Government representative. The contractor’s quality assurance plan will set forth procedures for self-inspecting the best value rates, quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the SOW. This QASP describes what the Government’s performance review priorities will be in the base period of performance.

1.2.2 The Government Contracting Officer Representative (COR) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The Government will make determination regarding whether the vendor is meeting acceptable performance levels. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively. Note - while the QASP intends to document the performance review priorities, other contract performance factors may be considered in reviewing the vendor’s performance for the period.

2 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the SOW and in Section 6 of this QASP. Failure to meet the required service or performance level may result in a Government request for consideration or other performance impact (e.g., creating a corrective action plan, exercise of future options and/or consideration for terminating the contract for cause).

3 METHODOLOGIES TO MONITOR PERFORMANCE

3.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate contractor performance when appropriate. The primary methods of surveillance are:

➢ Random monitoring, which shall be performed by the COR designated inspector.

➢ 100% Inspection – Each month, the COR, shall review the generated documentation and enter findings into the performance record for the period.

➢ Periodic Inspection – COR typically performs the periodic inspection on a pre-determined basis – typically monthly or quarterly.

3.2 Acceptable Quality Levels

The acceptable quality levels (AQLs) included in Section 6 of this QASP, for contractor performance are structured to allow the contractor to manage how the work is performed while clarifying methods that the Government will use to evaluate performance. Some performance measure AQLs are determined by requirement, other performance measure AQLs are based on the vendor’s commercial capability and will be evaluated as part of their proposal.

4 QUALITY ASSURANCE DOCUMENTATION

4.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the SOW and assessed using the performance monitoring techniques described in Section 6.

4.2 Feedback Format

The government’s QA surveillance feedback, documented by the COR, will be provided on a periodic basis established based on the final QASP post-award. It is expected to be no less than semi-annually and likely quarterly in the base period. When completed, the contractor will acknowledge the Government’s assessment of the contractor’s performance under the contract and take appropriate corrective actions, where necessary.

5 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

5.1 Determining Performance

5.1.1 Government shall use the monitoring methods cited to determine whether the service levels/performance standards/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

5.2 Reporting

5.2.1 At least semi-annually, the Government’s Contracting Officer Representative (COR) will prepare a written report for the Contracting Officer summarizing the overall results of the Quality Assurance Surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted quarterly reports and COR performance assessments, will become part of the contract performance record. It will enable the government to demonstrate whether the contractor is meeting the stated performance objectives and/or standards.

5.3 Reviews and Resolution

5.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO and other government personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:

➢ Monthly or Quarterly performance assessment data and trend analysis

➢ Issues and concerns of both parties

➢ Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

➢ Recommendations for improved efficiency and/or effectiveness

➢ Address any issues arising from the performance monitoring processes; contractor will be required to prepare a corrective action plan for any issues deemed as marginal or unacceptable performance.

5.3.2 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the CO.

6 SERVICE LEVEL AGREEMENT PERFORMANCE MEASURES FOR THE GOVERNMENT-WIDE TDY LODGING CONTRACT SOLUTION

Table 1 represents required service level performance measures where the acceptable quality level (AQL) is determined by Government requirement based on prior service performance and/or other established commercial capabilities. These will be included in the initial post-award QASP.

Table 1: Required Service Level Performance Measures with AQLs determined by SOW requirement Item Performance Measure

Performance

Standards Acceptable Quality

Levels Methods / Frequency of Surveillance

1 Meaningful customer engagement with CFO Act Agencies

Increase FedRooms utilization

3 meaningful customer engagements per month

Monthly, starting in FY24 Q2, rolled up Annually

2 Property reported room sales out of addressable universe

Business Volume / Market Share to support Category Management

+15% Annually Quarterly, rolled up Annually

3 Average savings off allowable lodging per diem

Savings to support Category Management Cost Avoidance

Savings off per diem 8% Annually

Quarterly, rolled up Annually

4 The % of FedRooms properties with Crown/Diamond or equivalent quality rating at 3 or above

Highly desirable properties available for selection in top Government destinations.

60% of accepted properties have a

Crown/Diamond quality rating of 3 or higher

Quarterly, rolled up Annually

5 The % of accepted FedRooms properties with last room availability (LRA) commitment

Maximize last room availability (LRA) commitments with properties in top destinations.

75% at 2 & 3 Crown/Diamond properties (combined) in top Government destinations*

Quarterly, rolled up Annually

6 Negotiated rates vs. comparable benchmark of accepted properties in the top Government destinations*

Measure the value of the FedRooms rate against top negotiated corporate rates that use Government per diem lodging rates as a guideline.

FedRooms® rates are less than or competitive to best corporate (Government -like) negotiated rates

Annually, by March 30

Table 2 represents required service level performance measures where the offeror is invited to propose an acceptable quality level based on their commercial capabilities and understanding of the government requirement. The final negotiated acceptable quality levels established in the offeror’s final proposal will be included in the initial post-award QASP.

Table 2: Required Service Level Performance Measures with AQLs proposed by Offeror for evaluation by Government Item Performance Measure

Performance

Standards Acceptable Quality

Levels Methods / Frequency of Surveillance

Requirement Reference n/a

1 INTRODUCTION
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance, define the acceptable quality levels, and to identify the required documentation and resources to be employed to assess performance. The QASP provides a ...
1.2 Performance Management Strategy
1.2.1 The contractor is responsible for the quality of all work performed and achieving the objectives outlined in the contract. The contractor measures that quality through the contractor’s own quality control program, which will be documented in its...
2 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
3 METHODOLOGIES TO MONITOR PERFORMANCE
3.1 Surveillance Techniques
3.2 Acceptable Quality Levels
4 QUALITY ASSURANCE DOCUMENTATION
4.1 The Performance Management Feedback Loop
4.2 Feedback Format
5 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
5.1 Determining Performance
5.1.1 Government shall use the monitoring methods cited to determine whether the service levels/performance standards/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to sh...
5.2 Reporting
5.2.1 At least semi-annually, the Government’s Contracting Officer Representative (COR) will prepare a written report for the Contracting Officer summarizing the overall results of the Quality Assurance Surveillance of the contractor’s performance. T...
5.3 Reviews and Resolution
5.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO and other government personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with ...
5.3.2 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics wil...

6 SERVICE LEVEL AGREEMENT PERFORMANCE MEASURES FOR THE GOVERNMENT-WIDE TDY LODGING CONTRACT SOLUTION