47QMCA23R0076 Attachment 1 - Proposal Checklist.docx
DOCX document 19 KB Posted
- Attached to
- 2024 Star of Life Ambulances
- Solicitation number
- 47QMCA23R0076
- Issued by
-
GSA Federal Acquisition Service
About this file
This document provides a proposal checklist and instructions for offerors responding to solicitation 47QMCA23R0076 for 2024 Star of Life Ambulances. The solicitation seeks offers for ambulances that meet Federal Specification KKK-A-1822F, with exceptions and equivalencies to be noted by offerors. Proposals must include three volumes: an administrative volume with forms and supplier information; a technical volume outlining the technical approach and additional required documents; and a price volume with an AutoBid printout using the "AutoBid Print All - Final" function. Proposals are due by the date and time listed in the solicitation. The solicitation is issued by the GSA Federal Acquisition Service for the procurement of ambulances to be delivered in 2024.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1 – PROPOSAL CHECKLIST
This proposal checklist is to assist Offerors in ensuring that proposals are complete. An electronic copy of this completed checklist must be included with all offers submitted. Prior to preparation of your offer, be sure to read the entire solicitation. Offers shall be prepared and submitted in the format outlined below.
Proposal Checklist
Volume 1—Administrative Requirements (ELECTRONIC VERSION ONLY - .zip file) Included/ Completed
GSA
Use
Completed Proposal Checklist
TAB A – SF1449 {complete with blocks 17(a), 30(a), 30(b) and 30(c)}
TAB B – Vendor Response Document (DO NOT include entire solicitation document)
TAB C – Financial Information
TAB D – SAM Information
TAB E – Proof of completion of VETS-4212 reporting requirement
TAB F – Letter(s) of Supply
TAB G – Inspection Point(s) / Place(s) of Performance
TAB H – Projects
TAB I – Subcontracting Plan
Volume 2—Technical Proposal
Included/ Completed
GSA
Factor 1 – Technical Capability
TAB A – Technical Approach
TAB B – Additional Documents Required by Federal Specification KKK-A-1822F
TAB C – Exceptions to Federal Specification KKK-A-1822F and Brand-Name Equivalency Statements (EXCEL ONLY)
Factor 2 – Management Capability
TAB A – Management Approach
Volume 3—Price Proposal
Included/ Completed
GSA
Factor 3 – Price
Tab A – AutoBid printout using the “AutoBid Print All – Final” function
AutoBid submission shall be completed by the DATE & TIME listed in the Solicitation
SOLICITATION 47QMCA23R0076
File details come from the government source that posted it. Updated .