F2F Site Visit Presentation for Grand Forks AFB Environmental Services
This is a presentation document for a face-to-face site visit conducted on April 20, 2026, by the Air Force Civil Engineer Center (AFCEC) at Grand Forks Air Force Base (GFAFB). The acquisition covers F2F Environmental Services for GFAFB under a General Services Administration (GSA) contract vehicle using an Environmental Services BPA (now competitive). The contract structure includes Tasks-FFP pricing with Travel and Miscellaneous Equipment Services (MES) priced on a Time and Materials basis. The period of performance is five years (1 base year plus 4 option years). The GSA Contracting Officer is Wes Mason, with Project Manager Neal Hurst and USAF Contracting Officer's Representative Marisa Gibb. The site visit established ground rules that all technical or contractual questions must be submitted per solicitation instructions (with a vendor questions due date identified but not specified in this presentation), no questions will be answered during the site visit, written responses take precedence over verbal information, and Q&A will be shared with all GSA contractors regardless of attendance. Vendor attendance is voluntary with no government reimbursement provided.
GFAFB is a 5,745-acre installation in Grand Forks, North Dakota, hosting the 319th Reconnaissance Wing under Air Combat Command (ACC) with primary missions in Intelligence, Surveillance, and Reconnaissance (ISR). The environmental services scope encompasses eight program areas: Hazardous Waste (8 Satellite Accumulation Points, Small Quantity Generator status, 2 270-day accumulation sites), Hazardous Materials (tracked via EESOH-MIS with 50+ shops requiring hazardous materials and EPCRA reporting), Air Quality (1 True Minor permit with approximately 1,000 permitted sources), Water Quality (Industrial Storm Water Permit with 4 outfalls requiring monthly sampling and Wastewater Permit with 2 outfalls, both administered through North Dakota DEQ systems), Cultural Resources (Integrated Cultural Resources Management Plan due 2027, 24 tribes with consultation requirements, 3,277.42 acres requiring Class III Archaeological survey), Solid Waste (no Qualified Recycling Program due to local market constraints), Environmental Management System maintenance, and Petroleum, Oil, Lubricants (POL) Storage Tank management (67 above-ground tanks and 19 underground tanks with current SPCC/FRP plans). The contractor must furnish all personnel, services, equipment, tools, materials, vehicles, and supervision, with no tasks designated as mission-essential. Base access is available through Main Gate (24/7) and South Gate (Monday-Friday, 0630-1700, commercial inspections beginning 0700).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Air Force Civil Engineer Center
Battle Ready… Built R ight!
20 April 2026
F2F Site Visit for Grand Forks AFB
Kristen Rundquist, Env Chief
Purpose of the Site Visit
Provide a forum for vendor(s) to view the installation, site conditions, and example locations, as well as develop questions to assist the AF in clarifying scope requirements.
Overview of Schedule
• Acquisition Overview
– Introductions
– Type of Acquisition
– Ground Rules
– Acquisition Timeline
• Installation Overview
– Introductions
– Installation Facts
– Environmental Program Areas
– Unique Considerations
• Site Tour
Acquisition Overview
Acquisition Team Introductions
• USAF
– Contracting Officer’s Representative (COR):
• Marisa Gibb
• GSA
– Contracting Officer: Wes Mason
– Project Manager: Neal Hurst
Only the CO has authority to bind government contractually
Acquisition Overview
• Contract Title: F2F Environmental Services for Grand Forks AFB
• Contract Vehicle: ES BPA now Competitive
• Contract Type: Tasks-FFP
Travel & MES-T&M
• Period of Performance: 5 Years
(1 BY + 4 OYs)
Ground Rules for Site Visit
• Attendance at site visit is based on each company’s decision to participate
• Government will not provide reimbursement for site visit
• Offerors shall not contact any AFCEC or Base personnel
All communication MUST be through the GSA CO/PM
Ground Rules for Site Visit
• All Technical or Contractual questions resulting from this site visit must be submitted per the Contracting Officer’s instructions in the solicitation.
• No questions will be asked or answered during the site visit.
• If questions are asked/answered orally, the vendor takes a risk in relying on that response rather than receiving the response in writing.
• Written responses to questions shall take precedence over information given verbally during the site visit.
• Q&A from this site visit will be shared with all GSA contractors, regardless of attendance.
Overview of PWS General
• Includes support for 4 geographically separate bases in 3 states
• Scope encompasses the full range of methods, technologies, and supporting activities necessary to conduct environmental operations and services
• Contractor shall furnish the personnel, services, equipment, tools, materials, vehicles, supervision, and other requirements necessary to perform work unless otherwise noted
– i.e., government furnished material, vehicle, etc.
• No work/task is considered mission essential
• PWS requirements apply to each applicable installations, unless otherwise identified
Overview of PWS Table 1 Requirements
• Table 1 summarizes requirements by Basic and Optional requirements
– Basic requirements are included in each year for the installation identified
– Optional requirements may be exercised in the year identified for the base, as determined by bona fide need / funding and as executed via modification
PWS References
• Task Requirements (Section C.4 of the PWS)
• Contract Data Requirements List (CDRLs) Deliverables
– Distribution to AFCEC (COR and/or Base PM)
– Primary Format is electronic unless specified hard copy
– eMail, CD, or Files Transfer Program/eDASH acceptable
– Format: 1) IAW Standardized Format; 2) Coordinated w/PM
– Submit all required deliverables/reports through ASSIST
• Supporting Documents (List on Atch 2)
– Program Requirements, Permit Requirements, Sampling
Requirements, Deadlines, Formatting, etc.
– Available electronically (no hard copy)
• Program Details (Atch 3)
– HW, HM, Air Quality, Water Quality, Solid Waste, Cultural
Resources, POL Storage Tanks (in addition to plans/permits)
– Contains historical averages to be used as reference only and includes relevant Government Furnished Equipment
• Additional References: GIS Maps
Acquisition Timeline
• RFQ Posted:
• Site Visit:
• Vendor Questions Due:
• Anticipated Government Response:
• RFQ Closing Date:
• Estimated Award Date:
Any Requests for Information after the required Due date and time WILL NOT be accepted. No Exceptions.
Questions?
Installation Overview
Discussion
• Installation Facts
• Infrastructure
– Base Access
– Communications
– Data Systems
• Program Review (PWS Requirements)
– Hazardous Waste and Hazardous Materials
– Air Quality
– Water Quality
– Cultural Resources
– Solid Waste
– Environmental Management System
– Petroleum, Oil, Lubricants Storage Tanks
• Unique Considerations
Installation Facts
• MAJCOM: Air Combat Command (ACC)
• Host Unit: 319th Reconnaissance Wing
• Wings: 319th Reconnaissance Wing
• Major Tenants: 10th Space Warning System (Cavalier Air Force Station), 9
RG Detachment 1 (ACC/Global Hawk), Army Corps of Engineers Resident Office, Air Force Office of Special Investigation, and Area Defense Council, Balfour Beatty Communities, Base Utilities Inc, GrandSky (Grand Forks County), Department of Homeland Security
• Mission: The base’s primary mission is focused on Intelligence, Surveillance, and Reconnaissance (ISR). GFAFB provides decisional advantage to warfighters and national leaders through ISR support and strategic command and control.
• Size: GFAFB is a 5,745 Acre installation in Grand Forks, ND.
• Runway(s): GFAFB has a 12,350 ft flightline
Base Access
• Gates:
• Main Gate - (Main Gate): Visitors Center, open 24/7.
• South Gate - near Hwy 2 on the east side of base, open Mon-Fri: 0630-1700
– Commercial inspections/passes begin 0700
– Closed on weekends, holidays and wing goal/family days
• Essential Activities:
• Visitor Center – 80 Steen Blvd, Grand Forks AFB, ND 58204
– 1 (701) 747-3587
– M-F 0900-1700
– Passes available at Main Gate after Visitor Center’s normal hours and weekends, holidays and wing goal/family days
Environmental Program Areas
• Hazardous Waste
• Hazardous Materials
• Air Quality
• Water Quality (Wastewater, Stormwater)
• Cultural Resources
• Solid Waste
• EMS
• POL Storage Tanks
Hazardous Waste
• Cradle to Grave HW tracking
• EESOH-MIS used to track
• 8 Satellite Accumulation Points (SAPs)
• 13 with EAFB (expected vacating Nov 2025)
• Small Quantity Generator (SQG)
• 270 Day Accumulation Sites: 2
• 180 Day Accumulation Sites: 0
• TSDF Permit: 0
Hazardous Materials
• HazMat purchased through or brought on base by Contractors is tracked using EESOH-
MIS
• EPCRA
• Tier 2 required biennially
• TRI is required annually
• 50+ Shops requiring use of hazardous materials (80+ with EAFB deployed to GFAFB)
Air Quality
• Currently operating under 1 True Minor permit
• 12-month rolling limits
• Approximately 1,000 permitted Sources
• Base wide AEI completed in APIMS
• Air Equipment Field Verification and update in APIMS
• Permit AEI due 15 March annually submitted electronically using SLEIS online ND DEQ program
• Last permit AEI submitted by base personnel w/support from contractor
• Refrigerant Model
Water Quality
• Industrial Storm Water Permit
• Permit Issued 24 Mar 2025, expires 31 Mar 2030
• Base has four (4) outfalls that require field sampling, and analysis at a Laboratory with a State of North Dakota Certification
• At a minimum, GFAFB must conduct monthly sampling beginning with the first month of deicing activities through the final month of deicing activities.
• General Requirements of SW Permit
• Semi-annual Discharge Monitoring Reports signed by 319 RW through ND DEQ online CERIS program
• Runoff management
• Quarterly Compliance inspections, but monthly during deicing operations
• Visual monitoring and documentation
• Revise 5-Yr Storm Water Pollution Prevention Plan (most recent due 27 Sep
2025 to ND DEQ)
• Training and Awareness
• AFCEC Annual report completed in September
• NPDES Permit renewal completed in March 2025
• WET (subset of APIMS)
Water Quality
• Wastewater Permit
• Permit issued 1 Oct 2024, expires 30 Sep 2029
• Renewal must be completed 6 months prior to expiration
• Last renewal completed by base personnel
• Wastewater Inventory Report
• Required with permit renewal
• Base has two outfalls that must be field sampled and sent to a
Laboratory with a state of ND Certification prior to any discharges
• Last Lagoon Discharge was Sep 2020
• DMRs are completed monthly and submitted electronically by
319 RW quarterly via ND DEQ CERIS online program
• Negative reports required
• WET (subset of APIMS)
• Industrial Waste Management Report due 30 APR annually
• Last report completed by base personnel
Cultural Resources
• ICRMP Date: 2027 (Base Responsibility)
• Architectural Survey: 6 facilities require initial survey, 86 require re-evaluation with survey
• Historical Facilities: 1 NHRP-eligible
• Archaeological Survey
• 3277.42 require Class III Archaeological survey
• Traditional Cultural Property (TCP) surveys must be included with the Class III
• 2478.38 acres completed
• Archaeological Sites: 9 sites, 6 isolated finds, 0 NRHP-eligible
• Tribal Interaction: 24 Tribes (29 tribal POC’s, Minnesota
Chippewa Tribe is a 6-Band union)
Solid Waste/Recycling
• Solid Waste Program
• Solid waste diverted from disposal – Scrap metal and used batteries
• Recycling Program
• GFAFB has no QRP
• Challenges
• Local market doesn’t support recycling
POL Storage Tanks
• Spill Plan- separated out into SPCC/FRP 5-year plans
• Current FRP approved by 319 RW, 10 Dec 2024
• EPA Reviewed 6 May 2025 and required revisions by 29 Aug
(mostly for missing information)
• Does not require re-signature of substantial harm statement
• Current SPCC
• PE signed 28 Feb 2024
• 319 RW Signed 4 Oct 2024
• Currently 67 ASTs
• Currently 19 USTs
Map of Stormwater Sampling Points
Data Management Systems
• Hazardous Waste/Materials tracking
• Will be completed using Enterprise Environmental, Safety and Occupational Health – Management Information System (EESOH-MIS), Hazconnect, RCRAinfo
• Air Permit Information System (APIMS, STAR, WET, SLEIS, CERIS, Power Home and Refrigerant)
• Used to track material usage along with calculations for air emission sources and inventory
• STAR has an updated inventory of storage tanks
Unique Considerations
Site Tour
Site Tour
• 90-Day Storage
• HAZMAT
• Waste Water Lagoons
• Outfalls
| Slide Number 1 |
| Purpose of the Site Visit |
| Overview of Schedule |
| Acquisition Overview |
| Acquisition Team�Introductions |
| Acquisition Overview |
| Ground Rules for Site Visit |
| Ground Rules for Site Visit |
| Overview of PWS�General |
| Overview of PWS�Table 1 Requirements |
| PWS References |
| Acquisition Timeline |
| Questions? |
| Installation Overview |
| Discussion |
| Installation Facts |
| Base Access |
| Environmental Program Areas |
| Hazardous Waste |
| Hazardous Materials |
| Air Quality |
| Water Quality |
| Water Quality |
| Cultural Resources |
| Solid Waste/Recycling |
| POL Storage Tanks |
| Map of Stormwater Sampling Points |
| Data Management Systems |
| Unique Considerations |
| Questions? |
| Site Tour |
| Site Tour |
| Questions? |
| Slide Number 34 |
File details come from the government source that posted it. Updated .