FIRE_ALARM_INSPECTION_QTLY_REPORT_LOS_TOMATES_IMPORT.pdf
PDF 112 KB Posted
- Solicitation number
- 47PH0219R0023
About this file
Bidder's Library addition of Fire Alarm Inspections
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE ALARM AND TESTING REPORT
Property/Customer Service Organization
System Testing Information
Date: Name:
Name: Address:
Address: Representative:
Representative: License No.
Control Unit Manufacturer: Type of Service:
Model No: Quarterly:
Last Date of Service: Annually:
Alarm Verification: Semi- Annually:
Other:
Prior to testing notifications are made to: Monitoring Entity:
Monitoring Entity: Contact:
Building Manager: Telephone:
Other: Account No:
Are signals transmitting properly?
Type Visual Functional Pass Fail
Control Unit
Lamps/Led Fuses
Silence Switch
Reset Switch
Primary power supply
Allen Helmer
FAL 1821836
1300 S. Exp. 77/83 Brownsville, Tx.
3/13/19
Notifier
Superior Alarms
System 500
Los tomates import building
Superior Central
600 Ash ave. McAllen, Tx
6/10/19
Comments:____________________________________________________________________
Device count and testing information Device type Quantity # Tested Functional Visual Pass Fail
Comments:____________________________________________________________________
Auxiliary Function testing information Type Quantity # Tested Funtional Visual Pass Fail
Comments:____________________________________________________________________
Monitoring Central Station Upon completion, were these signals transmitted?
Alarm signal _________________ Supervisory Signal _______________ Alarm Restoration _________________ Supervisory Restoration ________________
Battery back up
Remote Annunciator
NAC power supply
Primary phone line
Secondary phone line
Yes
N/A
Pullstations
Waterflow
1Valve tamp
Yes
Yes
SASH
Trouble Signal ___________________ Trouble Restoration ___________________ Comments:____________________________________________________________________
After testing, notifications are made to:
Building Manager: _____________________ Time:__________________ Monitoring Entity: _____________________ Time:__________________ Other: _____________________ Time:__________________
Comments:_____________________________________________________________________
System restored to normal operation Date: ________________________ Time:__________________
This testing was performed in accordance with NFPA standards Name of inspector:______________ Signature:__________________ Date: __________ Name of Representative:__________ Signature:__________________ Date: __________
Allen Helmer
Yes
6/10/19
Joaquin garcia jr
6/10/19
File details come from the government source that posted it.