FIRE_ALARM_INSPECTION_QTLY_REPORT_LOS_INDIOS_ADMIN.pdf
PDF 110 KB Posted
- Solicitation number
- 47PH0219R0023
About this file
Bidder's Library addition of Fire Alarm Inspections
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE ALARM AND TESTING REPORT
Property/Customer Service Organization
System Testing Information
Date: Name:
Name: Address:
Address: Representative:
Representative: License No.
Control Unit Manufacturer: Type of Service:
Model No: Quarterly:
Last Date of Service: Annually:
Alarm Verification: Semi- Annually:
Other:
Prior to testing notifications are made to: Monitoring Entity:
Monitoring Entity: Contact:
Building Manager: Telephone:
Other: Account No:
Are signals transmitting properly?
Type Visual Functional Pass Fail
Control Unit
Lamps/Led Fuses
Silence Switch
Reset Switch
Primary power supply
Superior Alarms6/12/19 Los Indios Admin Building
460709
600 Ash ave. McAllen, Tx
Yes
FAL1821836
100 Los Indios blvd. Los Indios, Tx
Superior Central
Allen Helmer
Simplex
Comments:____________________________________________________________________
Device count and testing information Device type Quantity # Tested Functional Visual Pass Fail
Comments:____________________________________________________________________
Auxiliary Function testing information Type Quantity # Tested Funtional Visual Pass Fail
Comments:____________________________________________________________________
Monitoring Central Station Upon completion, were these signals transmitted?
Alarm signal _________________ Supervisory Signal _______________ Alarm Restoration _________________ Supervisory Restoration ________________
Battery back up
Remote Annunciator
NAC power supply
Primary phone line
Secondary phone line
Yes
Pullstations
Yes
3 3Valve tamp
Waterflow
N/A
N/A
Yes Yes
Trouble Signal ___________________ Trouble Restoration ___________________ Comments:____________________________________________________________________
After testing, notifications are made to:
Building Manager: _____________________ Time:__________________ Monitoring Entity: _____________________ Time:__________________ Other: _____________________ Time:__________________
Comments:_____________________________________________________________________
System restored to normal operation Date: ________________________ Time:__________________
This testing was performed in accordance with NFPA standards Name of inspector:______________ Signature:__________________ Date: __________ Name of Representative:__________ Signature:__________________ Date: __________
Yes
6/12/19
6/12/19
6/12/19 Juan Martinez
Yes
Allen Helmer
File details come from the government source that posted it.