47PG0121R0005 Section J.pdf
PDF 951 KB Posted
- Solicitation number
- 47PG0121R0005
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 47PG0121R0005, Section J Page 1 of 58
Table of Contents
Section J: List of Attachments 2
J.1.0 Building Information Sheet 2
J.1.1 Sioux City Federal Building and Courthouse (IA0087ZZ) BIS 2
J.2.0 Energy and Water Efficiency Monthly Report 8
J.3.0 Contractor Maintenance Performance Plans 15
J.3.1 General: 15
J.4.0 Contractor Chart of Deliverables 18
J.4.1 General: 18
J.5.0 Smart and Sustainable Buildings 26
J.5.1 Specific BAS Requirements 26
J.5.1.1 Monthly Requirements 26
J.5.1.2 Semi-Annual / Seasonal 28
J.5.2 Appendices to BAS 31
J.6.0 Maintained Equipment Inventory 35
J.6.1 Sioux City Federal Building and US Courthouse Equipment Inventory 35
J.6.1.1 Sioux City Federal Building and US Courthouse (GSA-Owned) 35
J.6.1.2 Sioux City Federal Building and Courthouse Equipment Inventory (Agency-Owned) 47
J.6.2 Government Owned Equipment 48
J.7.0 Asbestos Operations and Maintenance Guidance 50
J.7.2 Class III Work 50
J.7.3 Asbestos Management Requirements 51
J.7.4 Quick Reference of Provisions for Class III & Class IV 52
J.8.0 GSA Approved Devices 55
J.9.0 Authorization for Waste Generator 57
Solicitation 47PG0121R0005, Section J Page 2 of 58
Section J: List of Attachments
J.1.0 Building Information Sheet
Building information sheets (BIS) are created to provide building statistics and are for informational purposes to help the contractor with a broad view of the facility. Each facility within the contractor will have its own BIS. The figures below are estimates only. When necessary, the CO or their designee will provide access to assignment drawings and blueprints
J.1.1 Sioux City Federal Building and Courthouse (IA0087ZZ) BIS
1. Building Data For:
O&M Contractor Contact Information:
LB&B Associates Inc
9891 Broken Land Parkway Suite 400
Columbia, MD 21046
Name of Building: Sioux City FB and CTHS
Location: 320 6th St. Sioux City, IA 51102
Quantity of Floors 4
Square Footage (Building Total) 110,805 GSF
Quantity of Elevators 3 Traction
Judges none
Passenger's 2
Sally Port/Prisoner none
Freight 1
Age of Building Built: 1932
Normal Building Operating Hours: M-F (exclude Federal Holidays)
Start
Time 7:30 AM
End
Time 5:30 PM
Building Operating Plan BOP (Y/N) YES
Quantity of Agencies 12
List of Agencies:
Bankruptc y Court
4,839 usf
District
Court
18,511 usf
Federal
Public
Defender s 501 usf
Magistrat e Court
6,228 usf
Probatio n 7,066 usf
Wage and
Hour
Division
253 sf
Indian U.S. Senate SBA Marshall Congressma
Solicitation 47PG0121R0005, Section J Page 3 of 58
Health
Services
2,245 usf
Attorney
1,762 usf
1,560 usf 835 usf. Services
10,000 usf n 502 usf
2 Child Care Centers: (Yes / NO) No
3 Environmental (Quantity)
Fuel Tanks (GSA Owned) No
Generators (GSA owned) No
Firing Range No
Asbestos Yes
Lead Based Paint Yes
PCBs No
Copy of environmental Permits
(Air, UST, etc.) Yes
NOTE TO CONTRACTOR: Asbestos, Lead, or any other hazardous material may be in the building (particularly older ones) and has not been discovered yet so all suspicious material found should be treated assuming it is.
4 MAJOR ALTERATION PROJECTS None
Build-outs/Prospectus/Agencies moving In/Out
BUILDING AUTOMATION SYSTEMS AND OTHER CRITICAL
EQUIPMENT
(Included # of equipment, Manufacturer Names, model #s, tonnage, KW, etc)
EMS/BAS/SMART TECHNOLOGY BAS / Niagara Version 4.7
Chillers 2 Each
York, Unit model # YTC3B2-
CGF 180 Ton
Daikin, Unit model #
WMC250DBS-ER10 250 Ton
UPS Systems No
Generators NO
Solicitation 47PG0121R0005, Section J Page 4 of 58
Boilers (Steam or Hot Water): 4
#1
Hot
Water Cleaver Brooks - 604369600115
#2
Hot
Water Cleaver Brooks - 604369600114
#3
Hot
Water Cleaver Brooks - 604369600113
#4
Hot
Water Cleaver Brooks - 604369600112
Water Treatment
Open Loop (coupon racks) No
Closed Loop (coupon racks) Yes
Glycol Loops(ethylene or propylene) No
Chemical Free Systems (type/which loops) No
Roof Anchorage Points and Systems None
Quantity-Description
Roof Anchorage Point and System Certification
(Weight Test Date) N/A
6 HISTORICAL REPAIR AND SERVICE REQUEST INFORMATION
Work Requests (6) six / monthly
7.
ANNIVERSARY DATES OF THE LAST TESTING
OF MAJOR
MAINTENANCE ITEMS
Eddy Current Yes: Date last performed 2018
Evaporator Yes: Date last performed 2018
Condenser Yes: Date last performed 2018
Infrared Testing
Switchgear Yes: Date last performed 2018
Boiler Yes: Date last performed 2018
Pressure Vessels Yes: Date last performed 2018
Steam traps:
8. HISTORICAL AND AESTHETIC ATTRIBUTES
Care should be taken to protect historical elements and artwork when performing work and maintenance around those items
Solicitation 47PG0121R0005, Section J Page 5 of 58
Yes/No Location
Artwork No Statues No
Artifacts No
9.
CAFETERIAS/CONCESSION
S Vending Machines only
. FIRE ALARM SYSTEMS
Is Centeral station Monitoring Phone lines currently handled by GSA or the O&M Contractor?
O&M
Historically has the Fire Alarm, Sprinkler testing been performed during normal or after hours?
Normal
Device Count for each building for the fire alarm system:
Smoke Detector 42
Heat Detector 7
Duct Detector 9
Pull Stations 17
Water Flows 4
Tampers
Dry Pipe Systems (low air)
Notification devices (strobe / speaker / combo) 35 / 29 / 104
Batteries 12 ea. 12 Volt
Fire Extinguisher 43
12-year Hydrostatic test per CY
6-Year test per CY 1/6/2020
. FILTERS (Size/MERV Rating/Type)
Type MERV Rating Size
Pleated 8 16/20/x2=18
Pleated 8 20/20/x2=16
Pleated 8 12/24x2=22
Pleated 8 20/24x2=13
Pleated 8 24/24x2=18
Pleated 8 16/25x2=25
Pleated 8 20/25/x2=6
Pleated 8 12/24x4=5
Pleated 8 24/24x4=9
Canister 14 12/24/x12=12
Canister 14 24/24/x12=3
Canister 14 20/20/x12=12
Solicitation 47PG0121R0005, Section J Page 6 of 58
Canister 14 20/24/x12=15
. Lighting Systems
(1) Lamp/ 48” 35
(2) Lamps/48” 198
Incandescent/Halogen Interior - Special Features 4
Incandescent/Halogen Exterior – Special Features 4
Specialty
Security Systems
Quantity of card readers for perimeter access and types (readers and keypads)
T-20 – 9 EA.
Turnstiles 0
Garage doors / gates 0
Sally Port Garage Doors 0
Loading Dock Gates 0
. PLUMBING
Quantity of automatic soap dispensers Not included in contract
(quantity and type of batteries per dispenser)
Quantity of automatic towel dispenser Not Included in contract
Quantity of automatic flush valves Not Included in contract
Quantity of automatic faucets Not Included in contract
Quantity of waterless urinals requiring cartridge replaced (i.e. Sloan, Falcon, etc.):
Not Included in contract
Quantity Backflow Prevention Devices (5) Yes- Date 1/5/2019
14 MISCELLANEOUS
Is Any equipment currently under Warranty Elkay Bi-Level Drinking Coolers- ends 8/4/2022
Built-up Roofing System-ends 10/28/2040
What is the age of the building roof(s)? 19 years
Solicitation 47PG0121R0005, Section J Page 7 of 58
Solicitation 47PG0121R0005, Section J Page 8 of 58
J.2.0 Energy and Water Efficiency Monthly Report
J.2.1 General: This energy and water efficiency report is to be completed per the requirements of section 5.6, Energy & Water Efficiency, of the O&M services contract. The Contractor shall use this report template and submit completed reports as part of the monthly report to the Facility
Manager.
J.2.2 Energy and Water Efficiency Reporting Template. The Contractor shall use this template to complete the energy and water efficiency report sections for “Contract Information” and “Contractor Reporting Elements.” The GSA Property Manager shall complete the section
“GSA Review and Response Elements.”
Contract Information
Contract Number:
Report Prepared by:
Building Information
Building Number: (if the building is part of a combined facility use the facility level data)
Building Name:
Building gross square foot:
Energy Technology & Analytic Tools Available at this Building:
Advanced Meters: yes/no
GSA Link: yes/no
Renewable Energy Systems: yes/no (describe)
Most Recent Energy Audit: yes/no (date)
Annual Performance Target
(To be filled out by in conjunction with the regional energy coordinator and the facility manager at the beginning of the Contractor’s performance period and 1 year thereafter until the end of contract)
Energy Water
TARGET Annual Usage XX,XXX BTU/GSF X.X Gal./GSF
TARGET Annual Variance + / - 5% of target BTU/GSF + / - 5% of target Gallon/GSF
ACTUAL Annual Usage XX,XXX BTU/GSF X.X GAL./GSF
- Actual Usage is Within
Target Variance (Yes/No) Yes/No Yes/No
ACTUAL Annual Usage, Previous Year
XX<XXX BTU/GSF X.X Gal./GSF
- Actual Usage is
Improving Relative to
Previous Year (Yes/No)
Yes/No Yes/No
If actual energy or water usage is not within target variance, provide narrative justification
If actual energy or water
Usage is not improving
Solicitation 47PG0121R0005, Section J Page 9 of 58 relative to previous year, provide justification
Monthly Utility Bill Reporting
(To be filled out monthly)
Actual Usage for
Difference Between This
Year and Previous Year
Purchased
Utility
Recommended
Reporting Unit
Current
Billing
Cycle
Ending
Month a
Current
Billing
Cycle
Same
Month
Previous
Year
Actual
Units
Percentage
Difference
Electricity kWh
Electric
Demand Peak kW
Natural Gas 100 Cubic Feet b
(Therms)
Steam MLB / mmBTU
Chilled Water Ton-Hours
Other Energy c
Total Energy Usage mmBTU d
Domestic Water Gallons e
a. Current cycle ending month refers to the most recent month in which data is available. EUAS and utility invoices are typically not available until 45 days after the month’s end. E.g. June data is available around August 15th.
b. EUAS data is reported in cubic feet. 100 cubic feet = 1 CCF = 1 Therm
c. Other energy can refer to biomass or other purchased utilities that should add to show total building energy consumption
d. Total mmBTU = (3,413 X kWh + 1.031 X 100 Cubic Feet + 1,000,000 X MLB + 12,000 X
Ton-Hours) / 1,000,000
e. Water is sometimes billed on quarterly (3 month) intervals. If water is billed quarterly, use the total quarterly value from the most recent quarter available.
Renewable Energy Production
(If applicable, to be filled out monthly)
Energy Output Difference Between This
Year & Previous Year
System Recommended
Reporting Unit
Current
Month
Current
Month
Same Month
Previous
Year
Actual
Units
Percentage
Difference
Solar Photovoltaic kWh
Solicitation 47PG0121R0005, Section J Page 10 of 58
Solar Hot Water mmBTU
Wind kWh
Geothermal mmBTU
Other Other
Discussion & Analysis
(If applicable, to be filled out monthly)
Are there any significant (>15%) Increases in energy or water usage?
Yes: No:
- If yes, what is the cause?
Are there any significant decreases or improvements energy or water usage?
Yes: No:
- If yes, what is the cause? Is it something that can be replicated across additional GSA Buildings?
Are there any significant changes in renewable energy production?
Yes: No:
- If yes, what is the cause?
Please describe any planned adjustments to operations or physical changes to the building
(by the Contractor, a project, or at the request of tenants) since the last report that may result in improved energy or water efficiency.
Please describe any planned adjustments to operations or changes made to the building (by the Contractor, a project, or at the request of tenants) since the last report that may result in increased energy or water usage.
Were planned adjustments from the last report implemented?
Solicitation 47PG0121R0005, Section J Page 11 of 58
Advanced Meter Analysis
(To be filled out monthly. If advanced meters are not available for this building, skip to next section.)
Electric Demand Profile (example)
Electric Sub-Meter Demand Profile
(example)
Steam Demand Profile Gas Demand Profile
Solicitation 47PG0121R0005, Section J Page 12 of 58
Chilled Water Demand Profile Domestic Water Demand Profile (example)
System & Efficiency Checks
(To be filled out monthly)
Are advanced meters functioning properly (i.e. are any meters not communicating or reporting data or reporting faulty data)?
Yes No
Malfunctioning meters reported to regional metering point of contact?
Is GSA Link functioning and are Sparks being addressed?
Yes No
Malfunctioning GSA Link reported to regional point of contact?
Are space temperatures set at 72 degrees F. +/- 2 degrees F. for heating mode?
If no, are there plans to adjust temperatures to the desired range?
Are space temperatures set at 75 degrees F. +/- 3 degrees F. for cooling mode?
If no, are there plans to adjust temperatures to the desired range?
Are the night and weekend set back temperatures set to no more than 550 in the winter and no less than 900 in the summer?
Yes No
If no, are the night/weekend setback temperatures at the level that promotes
Solicitation 47PG0121R0005, Section J Page 13 of 58 maximum energy savings without disrupting comfort?
Are holiday schedules verified for upcoming holidays?
If no, are there plans to verify or add holiday schedules?
Is the optimum start/stop sequence programmed into the building automation system?
If no, are there plans to implement optimum start/stop?
Is there a chilled water reset programmed into the chiller controls?
If chilled water reset schedule is available, but not in use, is there a plan to implement it?
Is there a hot water reset programmed into the boiler controls?
If a hot water reset schedule is available, but not in use, is there a plan to implement it?
Are the AHU schedules correctly programmed into the BAS and for the shortest possible time to maintain temperatures for the spaces served?
Yes No Comments
Are AHUs currently allowed to cycle off near the end of the day so building temperatures can
“coast”?
Are computer room temperature set points at 78 degrees or higher, and are overtime utilities being collected for this space?
If applicable, have steam traps been inspected internally and, if needed, rebuilt prior to the heating season?
Yes No
If no, are there plans to inspect and rebuild steam traps?
If applicable, have boiler efficiency tests been scheduled and performed in October -
November?
Yes No
If no, are there plans to schedule tests?
Solicitation 47PG0121R0005, Section J Page 14 of 58
Have advanced meters and/or leak detection sensors been checked for signs of water leaks?
If applicable, have cooling towers been checked for signs of leaks or excessive drift?
If no, are there plans inspect cooling towers?
GSA Review & Concurrence
GSA1. GSA Reviewing
Official:
GSA2. Date Reviewed:
GSA3. Comments:
Solicitation 47PG0121R0005, Section J Page 15 of 58
J.3.0 Contractor Maintenance Performance Plans
J.3.1 General:
Submittal Schedule provided from proposal to within 60 days. (See Section J.4.0 for additional deliverables throughout contract)
Deliverable Reference Due
Staffing Plan C.1.2 As part of the Contractor Proposal
Subcontracting Plan C.1.2 As part of the Contractor Proposal
Preventive Maintenance Plan C.6.0
As part of the Contractor Proposal and incorporated into BOP and updated in
NCMMS within 5 business days of approval
Facility Specific Quality Control
Plan C.1.3.1
The facility specific QCP must be submitted for review and approval to the CO or designee within 30 calendar days, prior to the contract start date.
Key Control C.1.5.1 Part of Quality Control Plan
Conservation of Utilities C.1.8 Part of Quality Control Plan
Transition Phase Services C.7.2 Within 60 Calendar days of transition services prior to the Contract start date
Initial Inspection C.7.0
Within 7 business days of award coordinate with COR/Designee for
Initial inspection with Incoming, Outgoing and GSA COR/designee)
Initial Deficiency Report C.7.2(h) No later than 15 calendar days after award
Transition Phase Schedule: Work and oncoming Staffing schedule C.7.2.1
Within 30 calendar days of the transition phase commencement
Work completion report (during transition) C.7.2.1
At the end of each week during the transition phase
Certification (staffing) C.1.2.7 No later than 7 days prior to employee beginning work
Communication Equipment (key operational personnel) C.1.2.3 At the commencement of the contract.
Contract Project Manager C.1.2.1
A detailed resume must be submitted to the CO or their designee for approval prior to the assignment of the project manager to the contract
Building Operating Plan C.5.2 /
C.7.2(a)
No later than end of the transition phase
Tour and Rounds Plan C.5.10.1 No later than end of transition phase
Employee Training Plan C.1.2.8 At Contract Commencement
Solicitation 47PG0121R0005, Section J Page 16 of 58
PM Plan/Schedule review/verification C.1.9.2(g)
No later than 60 days after award or at start as outlined in C.6
Site-Specific Safety and Health
Program C.5.4.2.1
Within 30 calendar days of contract start date
Fall Protection C.5.4.4 Within 30 calendar days of contract start date
Hazardous Energy Control plan
(Lockout/Tagout) C.5.4.6
Within 30 calendar days of contract start date
Safety Data Sheets C.5.4.11.1 Within 30 calendar days of contract start date
Hazard communication Plan C.5.4.11.2 As an appendix to the BOP, HazComm
Plan
Respirable Crystalline Silica
Management C.5.5.10
As part of Site-Specific Safety and
Health program
Initial Water Treatment analysis
(laboratory analysis) C.6.6.5.a
Within 30 calendar days from contract start date
BAS Technician Bldg specific certification/qualifications C.1.2.7.5
Within 60 calendar days of contract start date.
BAS Operator/Programs certification of training C.1.2.7.6
Within 60 calendar days of contract start date.
Asbestos Awareness Training C.1.2.8.1 Within 60 calendar days of Contract start date
Re-Tuning Training C.1.2.8.2
Within 60 calendar days of Contract start date; submit written certification within 5 business days of completion of training
NCMMS Training C.1.2.8.4 Within 60 calendar days of Contract start date
Smart and Sustainable Building
Training C.1.2.8.5
Within 60 calendar days of Contract start date
Lead Awareness Training C.1.2.8.6 Within 60 calendar days of Contract start date
Permit-Required Confined
Space Program and Employee
Training
C.5.4.7 Within 60 calendar days of contract start date
Emergency Shutdown
Instructions C.5.4.13
Within 60 calendar days of contract start date (reviewed and posted as applicable).
HVAC Water Management Plan 6.6.2 Within 60 Days of Contract start date
Solicitation 47PG0121R0005, Section J Page 17 of 58
Solicitation 47PG0121R0005, Section J Page 18 of 58
J.4.0 Contractor Chart of Deliverables
J.4.1 General:
Contractor Chart of Deliverables to CO or Designee throughout the contract:
(For deliverables required from proposal to within 60 days of contract start date see J.3)
Deliverable Referenc e Due Standard
Due to Change
Contract Project
Manager - Removal, replacement Diverting
C.1.2.1
Before removing, replacing, or diverting the Contract Project
Manager, the Contractor must
(1) notify the CO two weeks in advance and (2) submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this
Contract.
Staffing Changes C.1.2
Vacancies due to extended absences, resignation, retirement, etc. greater than 30 days must be filled by the 31st day of absence
Employee Training C.1.2.8 Addition of new staff member throughout contract
Certifications (new staffing) C.1.2.7
7 business days prior to employee beginning work
Permit-Required
Confined Space Entry
System Debrief
C.5.4.7.c At conclusion of entry into permit space
Tools - Burn Permits C.5.4.9.1 In advance for each day required
Reporting - Refrigerant leaks C.5.5.2.5
Immediately at or above 10% leak rate
BAS Alarms C.5.8.3.2 After 24-hour temporary override
Re-Tuning
Testing/Inspection C.5.8.4
Semi-annual within base year to coincide with heating and cooling season - after 2 cycles
CO or designee and contractor to determine appropriate frequency of additional re-tuning http://retuningtraining.lab works.org/training/lms/
Solicitation 47PG0121R0005, Section J Page 19 of 58
BAS Reporting C.5.8.5 Immediately report deficiencies
Fire Protection and
Life Safety Equipment and Systems
C.5.9.1.e
Immediately notify the CO or designee of the condition requiring immediate action.
Within 24 hours following the notification of the CO, the
Contractor must provide to the
CO or designee a written report of the hazardous condition and recommended corrective action.
Daily
Advanced Metering
Program Operations C.5.7.2
Performed daily as required/requested
Advanced Metering
Program Operations
Cooling Towers C.6.5 daily Report if off-line or not operating properly
Monthly
Government
Monitoring C.1.4.2
Monthly or at the discretion of the CO/designee
Conservation of
Utilities C.1.8
Part of Energy and Water
Efficiency Monthly Report
Waste Reports C.5.5.14
(a)
Submit by the 15th of each month and upon request by the
CO or designee.
Environmental
Compliance
C.5.5.14(
b) Monthly
Resource Conservation and Recovery Act
(RCRA), USDA, and EO
13834
Sustainable Purchasing
Practices
C.5.5.14(
c) Monthly
Energy and Water
Efficiency Reporting C.5.6.3
Report monthly energy and water usage as compared to the previous year and to explain usage trends. The report must be submitted to the CO or designee by the 5th business day of the subsequent month
Energy and Water
Efficiency Monthly Report format (See J.2.0)
Advanced Metering
Program Reporting C.5.7.4 Monthly
Escorting and
Miscellaneous Utility
C.5.14.1
& 2 Monthly
Monthly Progress
Reports C.5.15
The Monthly Progress Report must be submitted to the CO or designee by the last Friday of the month.
See Spec for all-inclusive requirements
Solicitation 47PG0121R0005, Section J Page 20 of 58
HVAC Water
Management Reporting C.6.6.6 Monthly
Subcontract reports C.5.15 With monthly reports
Annual
HVAC Education and certification C.1.2.8.3
Maintain a minimum of 16 hours of continuing education per year from either NATE, HVAC Excellence, or UA Star recognized provider program and maintain a Smart and
Sustainable Building
Certification.
Record Keeping C.1.6.2.5
In accordance with this clause, including those maintained by any subcontractors and suppliers, and submit them to the CO or designee annually
Building Operating
Plan C.5.2
The contractor must revise as needed and annually review and update the BOP and submit to the CO or designee an electronic file (MS Word, Google.doc) of the complete updated BOP on the anniversary of the Contract start date of each Contract year.
Equipment Inventory C.5.3.3.b
Annually certify that the
Maintained Equipment
Inventory is up-to-date and submit the certified inventory to the CO or designee.
Equipment condition assessment C.5.3.3.c
Annually submit to the CO or designee an itemized equipment condition assessment with its recommendation for equipment or system upgrades or replacements (that has reached the end of their life cycle), including a text description of each recommended upgrade or replacement and its life-cycle cost analysis including estimated project cost.
Safety Data Sheets C.5.4.11.
Annually by September 30 and anytime an item is added.
29 C.F.R. 1910.1200
Solicitation 47PG0121R0005, Section J Page 21 of 58
Refrigerant
Testing/Inspections C.5.5.2.3
The contractor must be responsible for obtaining any needed test kits, performing an annual gas test and, should a failure occur, having the failing part(s) repaired or replaced with working ones that allow for the successful completion of the required test.
Disposition of
Hazardous waste (for
Universal waste)
C.5.5.11
/ C.6.8.3
The contractor must provide a report to the CO or designee as required for Hazardous waste and at least annually for the disposition of universal waste.
40 C.F.R. part 260 40
C.F.R. part 273 1095.8
PBS Regulated Waste
Management
Backflow Prevention
Devices C.5.5.12 Annually NFPA 25
Every 2 Years
Re-Tuning Training C.1.2.8.2 Refresher training
As Required/Requested
Recording Presence C.1.2.11
Corrected within 3 calendar days of the end of work week:
upon request
Quality Control Plan
Review C.1.3.1
As requested, Initiated by direction of CO/designee
Ordinances, Taxes, Permits, and Licenses C.1.11 As required/requested
Tenant Environment C.5.1 As required ASHRAE Standard 55-
2004, ASHRAE 62.1-2016
Labeling and signage C.5.4.12 Immediately as required
Emergency Shutdown
Instructions C.5.4.13 As required
Electrical Safety C.5.4.14 As required/requested
Labeling Electrical
Circuits and Panels C.5.4.15 As required/requested
Refrigerants C.5.5.2.1 As required/requested
40 CFR Part 82 under
Section 608 of the Clean
Air Act
Stationary Engines C.5.5.4 As required/requested
Fuel Storage Tank
Management C.5.5.5 As required/requested
GSA Order 1095.2 PBS
Fuel Storage Tank
Management
Solicitation 47PG0121R0005, Section J Page 22 of 58
Solid Waste C.5.5.6 As required/requested Resource Conservation and Recovery Act
Asbestos Management C.5.5.8 As required/requested 29 CFR 1926.1101
Lead Management C.5.5.9 As required 29 CFR 1910.1025 or 29
CFR 1926.62
Disposition of
Hazardous Waste C.5.5.11 As required/requested
40 C.F.R. part 260 40
C.F.R. part 273 1095.8
PBS Regulated Waste
Management
Potable Water Systems C.5.5.13 As required/requested
The Safe Drinking Water
Act, PL 99-339 and 40
CFR 141.43, Sections A and D
Environmental
Compliance
C.5.5.14
(b) As required/requested Reports
Building Automated
Systems and IT
Controls Operations
C.5.8.2 As required/requested
BAS Alarms C.5.8.3.2 As required/requested
BAS
Testing/Inspecting C.5.8.4 As required/requested
BAS Reporting C.5.8.5 As required/requested
Fire Alarm System
Services C.5.9.2 As required/requested
NFPA 72 National Fire
Alarm and Signaling Code
Water-Based Fire
Protection Systems C.5.9.3 As required/requested NFPA 25
Fire-rated Door
Assemblies C.5.9.4 As required/requested
NFPA 80, Standard for
Fire Doors and Other
Opening Protectives and
NFPA 101, Life Safety
Code
Solicitation 47PG0121R0005, Section J Page 23 of 58
Fire Damper and
Combination
Fire/Smoke Dampers
C.5.9.5 As required/requested
NFPA 80, Standard for
Fire Doors and Other
Opening Protectives and
NFPA 105, Standard for the Installation of Smoke
Door Assemblies and
Other Opening Protectives.
Smoke Doors
Assemblies C.5.9.6 As required/requested
NFPA 105, Standard for the Installation of Smoke
Door Assemblies and
Other Opening Protectives
Smoke Dampers C.5.9.7 As required/requested the NFPA 105, Standard for the Installation of
Smoke Door Assemblies and Other Opening
Protectives
Portable Fire
Extinguishers C.5.9.8 As required/requested
NFPA 10, Standard for
Portable Fire
Extinguishers
Non-Water-Based Fire
Extinguishing Systems C.5.9.9 As required/requested
NFPA 12, Standard on
Carbon Dioxide
Extinguishing Systems;
NFPA 12A, Standard on
Halon 1301 Fire
Extinguishing Systems;
NFPA 17, Standard for
Dry Chemical
Extinguishing Systems;
NFPA 17A, Standard for
Wet Chemical
Extinguishing Systems;
NFPA 96, Standard for
Ventilation Control and
Fire Protection of
Commercial Cooking
Operations; NFPA 2001, Standard for Clean Agent
Fire Extinguishing
Systems.
Smoke Control
Systems C.5.9.10 As required/requested
NFPA 92, Standard for
Smoke Control Systems
Solicitation 47PG0121R0005, Section J Page 24 of 58
Emergency and
Standby Power
Systems
C.5.9.11 As required/requested
NFPA 110, Standard for
Emergency and Standby
Power Systems; NFPA
111, Standard on Stored
Electrical Energy
Emergency and Standby
Power Systems
Emergency Lighting
Systems and Exit
Signage
C.5.9.12 As required/requested NFPA 101, Life Safety
Code
Lightning Protection
Systems C.5.9.14 As required/requested
NFPA 780, Standard for the Installation of
Lightning Protection
Systems.
Chemical sensors C.5.9.15 As required/requested
Proactive Facility
Tours C.5.10.2 As required/requested
Minimum Tour
Frequencies C.5.10.3 As required/requested
Monitoring of Central
Plant Equipment C.5.10.4 As required/requested
Flag Procedures C.5.14.5 As required/requested
Reference Library C.5.16. As required/requested
Boiler Systems C.6.2 As required/requested
Air Distribution
Equipment: Air
Handling Units (AHU), Exhaust Fans (EF), Ductwork, Variable
Volume (VAV), Actuators, Intakes
C.6.3 As required/requested
HVAC Water
Management C.6.6
As Required
Monthly - Water treatment
Monthly report
Meter Readings
Glycol Monthly Testing
Maintenance - Lighting
Systems C.6.8.3 As Required
Plumbing and
Restrooms C.6.7 As Required
Recycling program for fluorescent lamps and other light bulbs
C.6.8.3 As Required 40 CFR 260
Solicitation 47PG0121R0005, Section J Page 25 of 58
Electrical Switchgear and Switchboards C.6.9
As Required, Shut down plan submitted 6 months in advance
Oil Analysis and Oil
Changes C.6.11 As required
Vertical Transportation
Systems C.6.12 As required
Replacement Items and
Painting C.6.13.2 As required
Directories. C.6.13.6 As required
Phase-out Transition
Period C.7.3
Up to 60 days of contract end date
Solicitation 47PG0121R0005, Section J Page 26 of 58
J.5.0 Smart and Sustainable Buildings
J.5.1 Specific BAS Requirements
The Contractor shall provide and schedule monthly and seasonal reviews I.A.W. in-house capabilities corresponding to normal operating hours of the facility. In addition, personnel of this caliber shall be available on a 24-hour basis to service any problems as might be required. This person shall be designated as the “BAS System Programmer” and shall be responsible for providing technical support to GSA personnel, and troubleshooting/repair of system problems.
All contracted services shall have qualification requirements reviewed prior to any services being performed
The System Programmer shall, on a minimum semiannual basis, exercise all control points in the system to demonstrate that the software, hardware, and controlled devices are operating as designed as noted in the seasonal review checklists. Whereas the contractor does not have in-house capabilities to perform the monthly reviews, a BAS System Programmer shall be contracted to perform the monthly reviews. ONLY BAS System Programmers are permitted to complete seasonal reviews.
a. Appendix A - BAS Monthly Review Checklist
b. Appendix B - BAS Change Request and Completion Log
c. Appendix C - BAS Seasonal Review Checklist - Cooling
d. Appendix C - BAS Seasonal Review Checklist – Heating
The Contractor shall provide any required labor for repairs which may be needed on a 24-hour basis. Required repairs which do not significantly affect environmental conditions nor energy consumption may be performed during normal working hours.
J.5.1.1 Monthly Requirements
As described in the overview, a monthly review is used to determine a quick status of the BAS to determine overall functionality. To conduct a monthly review only a few areas are required. This provides a quick glance into possible issues going on with the building and associated building control systems being controlled by the BAS. All of the items are required as part of the monthly review shall be documented and submitted to GSA facility management staff for review.
Using the provided “Monthly Review Checklist” located in APPENDIX A, complete the initial document requirements such as date of service, check in time of service, and technician’s name.
Log into the BAS and perform the following checks:
a. Discover and record the total amount of devices currently in communication fail
1. As a supplement, take screenshots of the devices in communication failure and attach them to a word document so they can be included with the monthly review checklist
2. An overview summary page can be used without the need to take individual screenshots of each graphic page. This provides GSA facility management with the exact devices that are in communication failure.
b. Discover and record the total amount of devices currently in override
Solicitation 47PG0121R0005, Section J Page 27 of 58
1. As a supplement, take screenshots of the devices in override and attach them to a word document so they can be included with the monthly review checklist
2. An overview summary page can be used without the need to take individual screenshots of each graphic page. This provides GSA facility management with the exact devices that are currently in override.
c. Review general trends to look for anomalies.
1. Record any anomalies on the monthly review checklist.
d. Review existing and previous alarms since last visit.
1. Determine if alarms pose a potential issue and record the potential issues on the monthly review checklist.
e. Review existing schedules and determine if adjustments are required.
1. Record the proposed adjustments on the monthly review checklist.
f. Perform any changes as noted from the “Change Request and Completion Log” and record completion information on the log. This includes but is not limited to additional trends, alarms, and program changes.
1. An allotted amount of time as noted in the “Additional Hours” section shall be used to complete any requests related to programming. This requirement does not cover the cost of hands-on repairs to components or any materials associated with such.
g. Perform any scheduling additions (i.e., Holiday Additions, Afterhours Schedules).
h. Once completed with the above monthly review tasks, complete the Monthly Review
Checklist by indicating the check-out time of the service.
1. Completion of the required documentation is also considered part of the time allotted for each location and should be considered when completing the documentation.
J.5.1.1.1 Monthly Time Allotment Requirements
The monthly time allotment requirements shall be based on the size of facility and the BAS associated with the building. For contracting purposes, this section represents the time associated with completing a monthly review and can be used for the purposes of quotations. This section is also intended as a basic guideline and can be adjusted based on GSA facility management preferences. Below is a table showing a breakdown of hours based on facility size. The table is broken into several columns indicating building size, hours required to complete the review, utility hours used for documentation and miscellaneous programming changes, and the overall total. The total should be taken into consideration for quotation purposes. It is highly encouraged to seek a discounted remote review rate to reduce costs if possible.
Square Footage Review Hours Utility Hours Total Hours
Up to 150K 3 1 4
151K to 400K 4 2 6
401K to 750 K 5 2 7
750K and above 6 2 8
Solicitation 47PG0121R0005, Section J Page 28 of 58
J.5.1.2 Semi-Annual / Seasonal
The ongoing seasonal review process is used to determine the status of the BAS controlled
HVAC equipment going into cooling and heating seasons. The review should be conducted, by a
BAS Programmer, on a twice a year targeted towards the beginning of cooling and heating seasons to maintain system health and normal functionality. A total of two ongoing seasonal reviews will be conducted per year which would also take the place of a monthly review. In the case where schedules conflict with regular monthly reviews, no less than a two week is spread between reviews is permitted. Upon the completion of the ongoing seasonal review, the results as documented (APPENDIX C).
J.5.1.2.1 Ongoing Seasonal Review Requirements
Using the provided “Ongoing Seasonal Review Checklist” located in APPENDIX C, complete the initial document requirements such as date of service, check in time of service, and technician’s name. Log into the BAS and perform the following checks:
a. Discover and record the total amount of devices currently in communication fail
1. As a supplement, take screenshots of the devices in communication failure and attach them to a word document so they can be included with the monthly review checklist
2. An overview summary page can be used without the need to take individual screenshots of each graphic page. This provides GSA facility management with the exact devices that are in communication failure.
b. Discover and record the total amount of devices currently in override
1. As a supplement, take screenshots of the devices in override and attach them to a word document so they can be included with the monthly review checklist
2. An overview summary page can be used without the need to take individual screenshots of each graphic page. This provides GSA facility management with the exact devices that are currently in override.
c. Manually actuate hot/cold water valves (depending on the season) and verify changes in discharge air temperature for the following:
1. All AHUs, OAUs
2. All perimeter heating (if heating season review)
3. 10 percent sample of VAVs, FPUs, CAVs
i. NOTE: In the event a full time BAS technician services the facility, a 100 percent check is required.
4. Record the results on the ongoing review checklist
d. Manually engage electric heat (if heating season review) and verify changes in discharge air temperature for the following:
1. 10 percent sample of VAVs, FPUs, CAVs
i. NOTE: In the event a full time BAS technician services the facility, a 100 percent check is required.
2. Test each stage independently on multi-stage units
3. Record the results on the ongoing review checklist
e. Verify proper functionality of chiller water/hot water resets on either systems depending on the season.
Solicitation 47PG0121R0005, Section J Page 29 of 58
1. Record the results on the ongoing review checklist
f. Review general trends to look for anomalies.
1. Record any anomalies on the monthly review checklist.
g. Review existing and previous alarms since last visit.
1. Determine if alarms pose a potential issue and record the potential issues on the monthly review checklist.
h. Review existing schedules and determine if adjustments are required.
1. Record the proposed adjustments on the ongoing review checklist review checklist.
i. Perform any changes as noted from the “Change Request and Completion Log” and record completion information on the log. This includes but is not limited to additional trends, alarms, and program changes.
1. An allotted amount of time as noted in the “Additional Hours” section shall be used to complete any requests related to programming. This requirement does not cover the cost of hands-on repairs to components or any materials associated with such.
j. Perform any scheduling additions (i.e., Holiday Additions, Afterhours Schedules).
k. Once completed with the above monthly review tasks, complete the Monthly Review
Checklist by indicating the check-out time of the service.
1. Completion of the required documentation is also considered part of the time allotted for each location and should be considered when completing the documentation.
J.5.1.2.2 Ongoing Seasonal review time allotment requirements
The ongoing seasonal review time allotment requirements shall be based on the size of facility, HVAC equipment quantities, and the BAS associated with the building. For contracting purposes, this section represents the time associated with completing an ongoing seasonal review and can be used for the purposes of quotations. This section is also intended as a basic guideline and can be adjusted based on GSA facility management preferences. In cases where buildings contain several smaller air handling units, additional time should be allotted to account for the added time associated with completing an ongoing seasonal review. Below is a table showing a breakdown of hours based on facility size. The table is broken into several columns indicating building size, hours required to complete the review, utility hours used for documentation and miscellaneous programming changes, additional time for additional AHUs, and the overall total.
The total should be taken into consideration for quotation purposes.
Square
Footage
Review
Hours
Utility
Hours
Additional AHUs Total Hours
Up to 150K 6 2 30 Min – Each
AHU after 3
8 plus AHUs
151K to 400K 8 3 30 Min – Each
AHU after 5
11 plus AHUs
Solicitation 47PG0121R0005, Section J Page 30 of 58
401K to 750
K
10 4 30 Min – Each
AHU after 7
14 plus AHUs
750K and above
12 4 30 Min – Each
AHU after 8
16 plus AHUs
Solicitation 47PG0121R0005, Section J Page 31 of 58
J.5.2 Appendices to BAS
APPENDIX A – BAS Monthly Review Checklist
BAS Monthly Review Checklist
Site Name:
Date of Service:
Technician Name:
Check Out Time:
Item
BAS Monthly Tasks Notes
Date
Completed
1.
Discover and record the total amount of devices currently in communication fail.
2.
Discover and record the total amount of devices currently in override
3. Review general trends to look for anomalies.
4.
Review existing and previous alarms since last visit.
5.
Review existing schedules and determine is adjustments are required.
6.
Perform any changes as noted from the “Change
Request and Completion Log” and record completion information on the log. This includes but is not limited to additional trends, alarms, and program changes.
7.
Perform any scheduling additions (i.e. Holiday
Additions, After Hours Schedules).
Solicitation 47PG0121R0005, Section J Page 32 of 58
APPENDIX B – Change Request and Completion Log
BAS Change Request and Completion Log
Site Name:
Date of Service:
Date
Equipment
ID Original BAS Settings/Programming BAS Changes
APPENDIX C – BAS Seasonal Cooling Checklist
BAS Seasonal Review Checklist - Cooling
Site Name:
Date of Service:
E Q U I
P M E N T
MISC
SCHEDULI
NG
RESETS
ONGOING SEASONAL
REVIEW CHECKS
NOTES
Solicitation 47PG0121R0005, Section J Page 33 of 58
T re n d s
A la rm s
O p er a to r
O v er ri d es
D ev ic es i n
C o m
F a il u re
H o li d a y C a le n d a r
T en a n t O v er ti m e
U ti li ti es
O cc u p ie d
S ta rt
U n o cc u p ie d
S to p
D is ch a rg e A ir em p R et
S ta ti c P re ss u r e
R
C h il le d W a te r
R o n d en se r
W a te r
R m m a n d C h il le d
W te r V a lv e F u ll y p en
D is ch a rg e p er a tu m m a n d C h il le
W te r V a lv e F u lo se m m a n d O u ts id e
A ir
D a m p er
F u ch a rg e p er a m m a n d O u ts id e
A ir
D a m p er
F u lo
Solicitation 47PG0121R0005, Section J Page 34 of 58
APPENDIX C – BAS Seasonal Heating Checklist
BAS Seasonal Review Checklist - Heating
Site Name:
Date of Service:
E Q
U
IP
M E
N
MISC
SCHEDULI
NG
RESETS
ONGOING SEASONAL
REVIEW CHECKS
NOTES
T re n d s
A la rm s
O p er a to r O v er ri d es
D ev ic es i n
C o
F il u re
H o li d a y C a le n d r a n t O v er ti m e
U ti li ti cc u p ie d
S ta rt
U n o cc u p ie d
S to p
D is ch a rg e A ir T e
R
S ta ti c
P re ss u r e
R es e t
H o t
W a te r
R m m a n d H o t
W a te r
V a lv e F u ll y O ch a rg e p er a m m a n d H o t
W a te r
V a lv e F u ll y C lo m m a n d E le ct ri c
H ea ti n g S ta g e
N ch a rg e p er a m m a n d O u ts id e m p er
F u ll y O ch a rg e p er a m m a n d O u ts id e m p er
F u ll y C lo
Solicitation 47PG0121R0005, Section J Page 35 of 58
J.6.0 Maintained Equipment Inventory
The following is a list of the Maintained Equipment Inventory for this contact by building. All provisions of section C.5 and other applicable areas within the contract must be followed. This inventory is for information purposes only and is not guaranteed to be 100% accurate, however;
the Contractor is responsible for the operation, maintenance, and repair of all equipment
(mechanical, electrical, structural, and architectural) and utilities, located on, within, or beneath, this facility’s interior and exterior extending to the legal property line. There may be multiple
PM Guides for each equipment type listed.
Note: Where a quantity is provided the equipment may not be updated in the NCMMS system at the time of this solicitation.
J.6.1 Sioux City Federal Building and US Courthouse Equipment Inventory
J.6.1.1 Sioux City Federal Building and US Courthouse (GSA-Owned)
Qty Asset # Description
6 Door, Hydraulic, Electric or Pneumatic Operated
11 Door, Hydraulic, Electric or Pneumatic Operated
11 Door, Manual, Overhead
855749 Door, Main Entrance
855749 Door, Main Entrance
287,400 sf Roof Inspection - Built-up type
292937 Ctrl-DDC -Field Panel
292882 DDC - field level controller
855648 DDC - field level controller
292937 DDC - field level controller
855623 DDC - field level controller
855628 DDC - field level controller
19 Circuit Breaker; Low Voltage Power (Over 100 amps)
145 Emergency Lights, Closed Systems
114 Emergency Lights, Wet Cell
Motor Starters 100 Hp and greater (individually enclosed less than 600 volt)
856170 Motor Controller Unit (600 volts and above)
856175 Motor Controller Unit (600 volts and above)
40 Motors, Preventive Maintenance 1 to 7.5 hp
293030 Surge Arrestor; Medium Voltage, Surge Protection Devices
855851 Surge Arrestor; Medium Voltage, Surge Protection Devices
855856 Surge Arrestor; Medium Voltage, Surge Protection Devices
855866 Surge Arrestor; Medium Voltage, Surge Protection Devices
855871 Surge Arrestor; Medium Voltage, Surge Protection Devices
855876 Surge Arrestor; Medium Voltage, Surge Protection Devices
855879 Surge Arrestor; Medium Voltage, Surge Protection Devices
855880 Surge Arrestor; Medium Voltage, Surge Protection Devices
855881 Surge Arrestor; Medium Voltage, Surge Protection Devices
Solicitation 47PG0121R0005, Section J Page 36 of 58
855883 Surge Arrestor; Medium Voltage, Surge Protection Devices
855890 Surge Arrestor; Medium Voltage, Surge Protection Devices
855891 Surge Arrestor; Medium Voltage, Surge Protection Devices
855893 Surge Arrestor; Medium Voltage, Surge Protection Devices
855894 Surge Arrestor; Medium Voltage, Surge Protection Devices
855895 Surge Arrestor; Medium Voltage, Surge Protection Devices
855896 Surge Arrestor; Medium Voltage, Surge Protection Devices
855898 Surge Arrestor; Medium Voltage, Surge Protection Devices
855899 Surge Arrestor; Medium Voltage, Surge Protection Devices
855900 Surge Arrestor; Medium Voltage, Surge Protection Devices
855901 Surge Arrestor; Medium Voltage, Surge Protection Devices
855903 Surge Arrestor; Medium Voltage, Surge Protection Devices
855904 Surge Arrestor; Medium Voltage, Surge Protection Devices
855905 Surge Arrestor; Medium Voltage, Surge Protection Devices
855906 Surge Arrestor; Medium Voltage, Surge Protection Devices
855908 Surge Arrestor; Medium Voltage, Surge Protection Devices
855910 Surge Arrestor; Medium Voltage, Surge Protection Devices
855911 Surge Arrestor; Medium Voltage, Surge Protection Devices
855912 Surge Arrestor; Medium Voltage, Surge Protection Devices
855914 Surge Arrestor; Medium Voltage, Surge Protection Devices
855919 Surge Arrestor; Medium Voltage, Surge Protection Devices
855922 Surge Arrestor; Medium Voltage, Surge Protection Devices
855924 Surge Arrestor; Medium Voltage, Surge Protection Devices
Switchboards, Medium Voltage (per cubicle)(600 volt to 15 kV)
1887633 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
1887634 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
1887635 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
1887636 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
292902 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
292940 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855636 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855641 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855655 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855665 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
Solicitation 47PG0121R0005, Section J Page 37 of 58
855667 to 200 amp rating)
855669 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855672 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855679 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855704 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855709 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
856427 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
292907 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855639 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855670 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855671 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855675 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855680 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855690 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855696 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855707 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855712 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855713 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855717 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855724 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855728 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
292912 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
292917 to 200 amp rating)
Solicitation 47PG0121R0005, Section J Page 38 of 58
292918 to 200 amp rating)
292921 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
292936 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
292941 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
292947 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855644 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855649 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855654 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855659 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855701 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855714 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855718 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855719 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855722 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855727 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855732 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855736 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855666 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855677 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855682 Disconnects; High Voltage (Isolating Switch, Per Switch) (Up to 200 amp rating)
855730 Low Voltage Dry Type Transformer, (30 KVA and up, 600 volts or less)
855734 Low Voltage Dry Type Transformer, (30 KVA and up, 600 volts or less)
855734 Low…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .