Amend 04 - Section M - M.12 Proposal Matrix.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Sioux City Operations and Mechanical Maintenance Services Federal contract opportunity
Solicitation number
47PG0121R0005
Issued by
General Services Administration Public Buildings Service Region 6

View the file

Other files for this federal contract opportunity

Other files attached to Sioux City Operations and Mechanical Maintenance Services, newest first.
File Type Posted
Amend 04 - 47PG0121R0005.pdf PDF
Amend 04 - Section B.1 - Price Sheets.xlsx XLSX spreadsheet
Section J.8.0.JPG JPG image
Amend 03 - 47PG0121R0005.pdf PDF
Amend 03 - Section M.pdf PDF
Amend 03 - Section C.pdf PDF
Amend 03 - Section L.pdf PDF
8 - Exhibit 6A - Region 6 BAS Review Guideline Rev A - Appendices.pdf PDF
Amend 03 - Section B.1 - Price Sheets.xlsx XLSX spreadsheet
Amend 03 - Intro.pdf PDF
Amend 02 - 47PG0121R0005.pdf PDF
Amend 02 - B.2 Cost Breakout - REVISED.xlsx XLSX spreadsheet
Amend 01 - 47PG0121R0005.pdf PDF
47PG0121R0005 Section A - SF1449.pdf PDF
47PG0121R0005 Section C.pdf PDF
47PG0121R0005 Section D.pdf PDF
47PG0121R0005 Section M.pdf PDF
47PG0121R0005 Section M - M.12 Proposal Matrix.xlsx XLSX spreadsheet
47PG0121R0005 Section K.pdf PDF
47PG0121R0005 Section I.pdf PDF
47PG0121R0005 Section L.pdf PDF
47PG0121R0005 Section G.pdf PDF
47PG0121R0005 - Cover Pages.pdf PDF
47PG0121R0005 Section J.pdf PDF
47PG0121R0005 Section F.pdf PDF
47PG0121R0005 Section B.2 - Cost Breakout.xlsx XLSX spreadsheet
47PG0121R0005 Section B.1 - Price Sheets.xlsx XLSX spreadsheet
47PG0121R0005 Section I - Wage Determination.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical

PROPOSAL MATRIX - TECHNICAL PROPOSAL

Solicitation
SectionSolicitation

Section Page No. Title of Document Requirement Proposal Page No.

Section M3STAFFING PLANM.2.1.2.A.2.
Section M3Positions, titles, responsibilities, and physical locationsM.2.1.2.A.2.
Section M3Subcontractors/Contractor Team Arrangements (CTA) that will be used
and their areas of responsibilityM.2.1.2.A.2.
Section M3Description of how the contractor plans to recruit and retain personnel, particularly key personnel.M.2.1.2.A.2.
Section M3Description of how the contractor plans to fill vacancies as a result of attrition, including a proposed schedule for recruitment, selection, training, and transition.M.2.1.2.A.2.
Section M3Description of how the offeror will manage resources with a
union agreement.M.2.1.2.A.2.
Section M3Description of how resources will be shared amongst the buildings
and on campus.M.2.1.2.A.2.
Section M3Overall approach, priorities, and the work to be accomplished during
the transition phaseM.2.1.2.A.2.
Section M3MONTHLY PROGRESS AND COMMUNICATIONS PLANM.2.1.2.A.4
Section M3method for providing GSA /stakeholders with monthly progress infoM.2.1.2.A.4
Section M3describe the status and impact of all current and future contract and
asset programs including custodial and mechanical, projects, energy usage, tenants, etc. The Contractor should articulate specifics on how this update will be accomplished, including the information to be provided, goals and objectives.M.2.1.2.A.4
Section M3QUALITY CONTROL PLANM.2.1.2.A.6
Section M3detail method, frequency, documentation, and remedies for ensuring
work is highest quality.M.2.1.2.A.6
Section M3Describe procedures for correcting problems and correcting quality
assurance findings.M.2.1.2.A.6
Section M4PREVENTATIVE/PREDICTIVE MAINTENANCE PLANM.2.1.2.B.2
Section M4detail the Contractor’s approach for ensuring all equipment and

systems covered under the scope of the PWS requiring a PM procedure, tour, inspection, and/or testing is continually accounted for, scheduled,

documented, and completed as scheduled each monthM.2.1.2.B.2
Section M4articulate how the Contractor’s approach will provide for the efficient

operation of all equipment and systems; maximum equipment life;

minimum downtime for accomplishing procedures, and a system that identifies equipment requiring upgrades or replacement, and

warranty management.M.2.1.2.B.2
Section M4detail the Contractor’s approach to using the 2018 GSA Maintenance
Guide, any deviations and the rationale for doing so.M.2.1.2.B.2
Section M4The plan should detail what equipment will receive tours, the frequencies,

the methodology for documentation, and the application of data in

efficient operations.M.2.1.2.B.2
Section M4The Contractor should articulate specifics on the employee(s) using

the BAS system, the training they will receive, the ways they will use the system and associated benefits, any subcontractor(s) and the

support they will provide quantified in hours and associated services.M.2.1.2.B.2
Section M4NCMMS USAGE AND DATA MANAGEMENT PLANM.2.1.2.B.4
Section M4The offeror shall provide credential and/or training plan for the employee
managing NCMMS for the contractor and how they will be utilized, i.e., services provided on location or remotely.M.2.1.2.B.4
Section M4The plan shall detail intended daily usage, data validation and quality control management methodology and timeline for inventory verifications, and reports integration with other program areas. This shall include but not limited to, subcontract work, records documentation, equipment maintenance, locations and inventories, warranty information, job plans, preventive maintenance plans and tracking, O&M manuals, reports, systems inspection, tour sheets, operating logs, safety plans, quality control inspections, Work Orders, Work Order close out, miscellaneous hours information, Overtime Utilities information, all tests, equipment photos, certifications, meter readings, permits, existing deficiency reports, initial deficiency reports and other records required by current and future policies. The Contractor must use the NCMMS to validate and update the equipment inventory and all locations where Contractor work occurs on a continuous basis including an annual certification that the equipment inventory is up to date and complete.M.2.1.2.B.4
Section M4BAS MONITORING, USAGE, AND MAINTENANCE PLANM.2.1.2.B.6
Section M4The plam shall address how the offeror intends to monitor and respond
to BAS alarms 24 hours a day, 7 days a week.M.2.1.2.B.6
Section M5The plan shall include the various types of alarms such as minor to
critical and how the response shall occur for each. While onsite during normal business hours, the offeror shall provide a plan that includes how the overall health of the system shall be maintained for proper functionality. This shall include but is not limited to the calibration of sensors, verification of alarm functionality, and overall HVAC controllers. Proposals will be evaluated on the extent to which the plan demonstrates quality control, usage management, proper response, and system maintenance and service practices to ensure reliable data and responses within the system. If a subcontractor is to be used for BAS service and maintenance that plan must identify the subcontractor and provide a description of their experience with the system.M.2.1.2.B.6
Section M5PRIOR EXPERIENCE FORM M.8 AND NARRATIVE REFERENCE 1M.2.2.2
Section M5Type of facility, number and geographical locations of associated

buildings, nature of tenant mission and population, square footage,

complexity of equipment, age of facilities.M.2.2.2.a
Section M5Estimated annual dollar value of contract.M.2.2.2.b
Section M5Description of services provided and the offeror’s level of responsibility
and authority on the project.M.2.2.2.c
Section M5List of subcontracted services and subcontractors used, along with
estimated annual cost of each subcontracted service.M.2.2.2.d
Section M5Type of contract (e.g., cost reimbursable, incentive fee, award fee,
time and materials, fixed price, etc.).M.2.2.2.e
Section M5Date of contract start and completion, including options.M.2.2.2.f
Section M5Name, title, address, phone number, and email of customer contact.
It is incumbent on the offeror to ensure the customer information is current and accurate.M.2.2.2.g
Section M5Name, title, address, phone number, and email of the building's owner

or a representative of the owner who can attest to the quality of the services provided. It is incumbent on the offeror to ensure this information is current

and accurate.M.2.2.2.h
Section M5PRIOR EXPERIENCE FORM M.8 AND NARRATIVE REFERENCE 2M.2.2.2
Section M5Type of facility, number and geographical locations of associated

buildings, nature of tenant mission and population, square footage,

complexity of equipment, age of facilities.M.2.2.2.a
Section M5Estimated annual dollar value of contract.M.2.2.2.b
Section M5Description of services provided and the offeror’s level of responsibility
and authority on the project.M.2.2.2.c
Section M5List of subcontracted services and subcontractors used, along with
estimated annual cost of each subcontracted service.M.2.2.2.d
Section M5Type of contract (e.g., cost reimbursable, incentive fee, award fee,
time and materials, fixed price, etc.).M.2.2.2.e
Section M5Date of contract start and completion, including options.M.2.2.2.f
Section M5Name, title, address, phone number, and email of customer contact.
It is incumbent on the offeror to ensure the customer information is current and accurate.M.2.2.2.g
Section M5Name, title, address, phone number, and email of the building's owner

or a representative of the owner who can attest to the quality of the services provided. It is incumbent on the offeror to ensure this information is current

and accurate.M.2.2.2.h
Section M5PRIOR EXPERIENCE FORM M.8 AND NARRATIVE REFERENCE 3M.2.2.2
Section M5Type of facility, number and geographical locations of associated

buildings, nature of tenant mission and population, square footage,

complexity of equipment, age of facilities.M.2.2.2.a
Section M5Estimated annual dollar value of contract.M.2.2.2.b
Section M5Description of services provided and the offeror’s level of responsibility
and authority on the project.M.2.2.2.c
Section M5List of subcontracted services and subcontractors used, along with
estimated annual cost of each subcontracted service.M.2.2.2.d
Section M5Type of contract (e.g., cost reimbursable, incentive fee, award fee,
time and materials, fixed price, etc.).M.2.2.2.e
Section M5Date of contract start and completion, including options.M.2.2.2.f
Section M5Name, title, address, phone number, and email of customer contact.
It is incumbent on the offeror to ensure the customer information is current and accurate.M.2.2.2.g
Section M5Name, title, address, phone number, and email of the building's owner

or a representative of the owner who can attest to the quality of the services provided. It is incumbent on the offeror to ensure this information is current

and accurate.M.2.2.2.h
Section M6M.9 PAST PERFORMANCE REFERENCE INFORMATION #1M.2.3.2
Section M6M.9 PAST PERFORMANCE REFERENCE INFORMATION #2M.2.3.2
Section M6M.9 PAST PERFORMANCE REFERENCE INFORMATION #3M.2.3.2
Section M6M.10 SITE INSPECTION FORMM.2.4.A
Section L6M.12 PROPOSAL MATRIXL.2.3.5

Price Proposal

PROPOSAL MATRIX - PRICING
DO NOT INCLUDE ANY PRICING INFO

IN THIS DOCUMENT

Solicitation
SectionSolicitation

Section Page No. Title of Document Requirement Proposal Page No.

Section L7Standard Form 1449, signedL.2.4.1
Section L7B.1 - Price Sheets (Excel)L.2.4.2
Section L7B.2 Cost Breakout (Excel)L.2.4.3
Section L7Section KL.2.4.4
Section L7Solicitation Amendments, acknowledgedL.2.4.5

File details come from the government source that posted it. Updated .