47PF0025R0027_Amendment 0002.pdf

PDF 746 KB Posted

Attached to
Elevator Modernization- Grand Rapids, MI Federal contract opportunity
Solicitation number
47PF0025R0027
Issued by
General Services Administration Public Buildings Service Region 5

About this file

This document is an Amendment of Solicitation (Standard Form 30) for the Elevator Modernization Project at the Gerald R. Ford Federal Building and U.S. Courthouse in Grand Rapids, Michigan. Amendment 0002 revises the specifications for both passenger and service elevators, specifically modifying the maximum continuous shutdown periods. The amendment clarifies that each passenger elevator can have a maximum continuous shutdown of 98 calendar days without penalties, and the total construction duration for all four elevators (3 passenger and 1 service) must not exceed 587 calendar days. The solicitation remains set aside for small businesses, with an estimated project value between $3.5-$4.5 million under NAICS code 238290, and is being issued by the GSA Public Buildings Service Region 5 Repair & Alterations Contracting Branch Northern Team.

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Modernization- Grand Rapids, MI, newest first.
File Type Posted
47PF0025R0027_Amendment 0001.pdf PDF
Preproposal Conf Agenda_GR Elevator Modernization.pdf PDF
Preproposal Conf Sign In Sheet_GR Elevator Modernization.pdf PDF
GR Passenger Elevators 1_2_4_Drawings.pdf PDF
GR Service Elevator 3_Drawings.pdf PDF
GR Passenger Elevator Spec_REV03.pdf PDF
Preproposal Mtg Registration_GR Elevator.pdf PDF
RFP 47PF0025R0027.pdf PDF
GR Service Elevator Spec_REV03.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

5P2QC

Joseph E. Daniero

Solicitation# 47PF0025R0027 Amendment 0002 - Elevator Modernization Project, Gerald R Ford Federal Building and U.S.

Courthouse, Grand Rapids, MI

This amendment is being issued to revise the specifications for both the passenger and service elevator. These files are labeled as 'GR Passenger Elevator Spec_REV03.pdf' and 'GR Service Elevator Spec_REV03.pdf' within the sam.gov posting.

5P2QC

R5 AMD Repair & Alterations Contracting Branch Northern Team 110 Michigan St, NW, Suite 293 Grand Rapids, MI 49503 USA

R5 AMD Repair & Alterations Contracting Branch Northern Team 110 Michigan St, NW, Suite 293 Grand Rapids, MI 49503 USA

EQ5P1NEC-24-0023

47PF0025R0027

N342607605/19/2025

04/15/2025

1 2

5/19/25

Description of Modification Continuation Page

This amendment hereby modifies both specifications.

Passenger Elevator Specification Section 14 22 11, Paragraph 1.09.B.2 and Service Elevator Specification Section 14 22 12, Paragraph 1.09.B.2 are replaced in their entirety and shall read as follows:

The intended maximum continuous shut down for each passenger elevator is 98 calendar days. Exceeding this time period will not result in penalties. However, the total construction duration to reach substantial completion for all four elevators (3 passengers and 1 service) shall not exceed 587 calendar days.

47PF0025R0027/0002

File details come from the government source that posted it. Updated .