Amendment 0003 - 47PF0022R0001 RFIs.pdf
PDF 85 KB Posted
- Solicitation number
- 47PF0022R0001
About this file
This document provides details on a federal solicitation for general construction services for the Health and Human Services Chicago Federal Backfill Project. The solicitation seeks a general contractor to provide construction and renovation services at the John C. Kluczynski and Ralph H. Metcalfe Federal Buildings in Chicago, Illinois. Services include interior construction, demolition, hazardous materials abatement, and HVAC, electrical, and plumbing upgrades. The estimated value of the contract is between $10-20 million. The award is set aside for small businesses and will be awarded using a best value determination considering technical factors and price. The technical evaluation will assess experience, project management, key personnel qualifications, and past performance. The pre-proposal conference will be held on July 19, 2022 and proposals are due on August 11, 2022. Award is targeted for November 2022 with a 250-day performance period ending October 2023. The soliciting agency is the General Services Administration and the work will consolidate Health and Human Services leased space into federally owned locations.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 03 RFP 47PF0022R0001 HHS Chicago Federal Backfill RFIs
This Amendment incorporates the last round of submitted RFIs and the GSA provided response, and also hereby incorporates a revised supplemental pricing sheet to include
Allowance 01 - XL Pipe Replacement for the JCK, and Allowance 02 – JCK and Metcalf Floor
Prep Area.
Question/RFI Answer
To confirm the existing Fire Alarm system at
Metcalfe is an EST system as indicated on FA-
000.
Metcalfe Fire Alarm System is an EST 3 system.
Please confirm if there are any isolation valves for MEPFP systems to isolate the floors we are working on from the rest of the building.
JCK: For the fire protection system there is a main control valve for each floor located in the NW stairwell. There are hot/cold water shut off valves in the men's and women's washrooms, serving the bathrooms. Kitchen/pantry water lines would need to be traced as some are served from the floor below or floor above. There is no HVAC isolation by floor. The air handlers at JCK all serve multiple floors.
Metcalfe: Common area restrooms and gear rooms should remain operational, but all of the utilities can be isolated as necessary.
Please confirm the material of the signage along with the sizes of the signs. The specs were a little confusing and I would like some clarification.
Signage documentation is not yet complete and will be further clarified in final document issuance.
Signage sizes (drawn full size) are correct on drawings. Spec requires an update to match.
General design intent is that all signage occuring in public corridors will be brushed stainless steel mounted to bar stock supports and mechanically fastened to wall surface. Room numbers to be black acrylic text inset into an etched pocket; room names are screened printed polyurethane enamel paint. Interior signs to be Satin Aluminum Polymer with Black Raised Copy to be applied with tape adhesive at walls/glass and benching stations, mounting pins at work stations (fabric panels). At glass fronts include matching blank back panels.
All signs to include Grade II Braille room numbers.
07 9200-1 /2.02/A/1 - Is Gasketing and caulk required at all locations where new partition meet existing column covers/existing partitions? Confirm all locations and
Yes, at all locations.
specification.
Metcalfe level 21 - Please provide documentation of existing conditions and areas that need to be patched/painted. Or provide allowance to cover this scope of work unquantifiable.
Patch & paint/repairs would be required, if damaged as a result of the construction work, not correct existing outside the project scope area.
Protection of existing spaces outside the project scope area can also be provided.
Metcalfe Level 21 - Please provide documentation of existing conditions at window frames and accessories; or provide allowance to cover this scope of work unquantifiable.
Patch & paint/repairs would be required, if damaged as a result of the construction work, not correct existing outside the project scope area.
Protection of existing spaces outside the project scope area can also be provided.
D121 - Metcalfe - Please confirm if the perimeter walls are to receive a level 5 finish.
Yes, Level 4 is acceptable. Will clarify in spec in the next submission.
D131 & D133 - JCK - Please confirm if the perimeter walls are to receive a level 5 finish.
Yes, Level 4 is acceptable. Will clarify in spec in the next submission.
D121 - Please provide detailed scope of work of what furniture is required to be removed
Will remove requirement for GC to handle salvage/disposal of furniture at current lease space.
21st floor at Metcalfe does not currently have any furniture for removal/disposal.
31st floor at JCK - Remove/dispose of any remaining furniture as observed during the pre-proposal conference.
33rd floor at JCK - This information is to be determined.
D133 - JCK 33rd Floor- Please confirm storage location of lights that are to be salvaged during demolition
There is approximately 2500sf of vacant space on the 32nd floor that can potentially be used for storage of these salvaged lights during the demolition/construction phases. If this space is utilized for storage, it must be turned back over in original, clean condition at conclusion of the project
D121 - Metcalfe - Is there enough attic stock to replace the corridor wallcovering
Corridor wallcovering should be replaced with new.
Attic stock will not be available for this project
A121 and all elevations on A400 and A402 -
Please provide thickness and glass type to be used in each of the aluminum glass office front systems
That information is already in the Demountable
Partition specification which indicates that 3/8” clear glass is to be used, and that the demountable partition system is to have an STC rating of 34.
FP-121& FP-221 (Metcalfe) - At locations of deleted or relocated sprinkler heads, please confirm if branches will have to be removed as well?
Branch piping can be reused if the piping is in good condition and new sprinklers are being installed using the existing branch. Branches that are not able to be reused should be removed back to the main.
FP-131 & FP-233 (JCK) - At locations of deleted or relocated sprinkler heads, please confirm if branches will have to be removed as well?
Branch piping can be reused if the piping is in good condition and new sprinklers are being installed using the existing branch. Branches that are not able to be reused should be removed back to the main.
A133.1 Red Notes (JCK) - Will the engineering report be available before bids are due or will an allowance be given for the cutting of any new penetrations of existing steel beams?
The report will not be completed prior to the bid due date.
An allowance is not anticipated for this work.
Based on the current design and information; it is anticipated that three beams will require a hole cored and web stiffener plates welded to each side of the beam, along with replacement of fireproofing.
P-133 GN 1 (JCK) - Is there a location on site where we can store the icemaker, set for reinstallation, during construction?
There is approximately 2500sf of vacant space on the 32nd floor that can potentially be used for storage of these salvaged material and/or appliances during the demolition/construction phases. If this space is utilized for storage, it must be turned back over in original, clean condition at conclusion of the project
A121/9 - We will need a specified quantity of floor prep area or an allowance to cover this scope of work
Provide an allowance in the amount of $50,000.00 for both JCK & Metcalfe cumulatively.
07 9200-2 2.02/D - Per the specs, STC ratings are called out for walls and ceilings but are not shown on drawing. Can you provide specific locations and detailed scope of work.
Refer to JCK sheet A500 for acoustical sealant locations
A401 (Metcalfe) - Steel Angle and Plate need to be sized and the anchoring system needs to be specified for the folding partition
Information will be forthcoming but is not yet available.
Details 3 / A401 (Metcalfe) - We need clarification on the work from the exterior glass frame to the foldable partition; it is unclear on what is being done with the framing and drywall at the window.
Condition at Metcalfe is identical to typical new partition interface with exterior wall (Detail 3/A500).
The referenced "partition closure" is a product which will be added to the spec. Example is
"Mullion Mate" by Gordon.
AF121 (JCK) - Will the markerboards/white boards/projector screens be provided by the furniture contractor? If not please provide a specification for these items.
Marker boards will be in the GC contract. A spec and location info will be provided. Projector screens are part of the AV Equipment package which is not in contract
AF121 (Metcalfe) - Will the markerboards/white boards/projector screens be provided by the furniture contractor? If not please provide a specification for these items.
Marker boards will be in the GC contract. A spec and location info will be provided. Projector screens are part of the AV Equipment package which is not in contract
Specification Section 08 43 13 (JCK) - Please confirm whether or not the entries to the office spaces will be aluminum and glass or hollow metal and wood; specifications and door schedule are conflicting
Main and secondary entry doors in JCK should be aluminum and glass. The "back of house" perimeter doors will be painted hollow metal. No perimeter doors will be wood. Documents will be corrected accordingly.
Specification Section 08 43 14 (Metcalfe) -
Please confirm whether or not the entries to the office spaces will be aluminum and glass or hollow metal and wood; specifications and door schedule are conflicting
Main and secondary entry doors in JCK should be aluminum and glass. The "back of house" perimeter doors will be painted hollow metal. No perimeter doors will be wood. Documents will be corrected accordingly.
Electrical/Low Voltage (JCK) - Please provide the required subcontractor and contact information for the telecommunications/data for the building system
There is no required subcontractor for telecom/data
Fire Alarm (JCK) - Please provide the required subcontractor and contact information for the fire alarm system for the building system
Convergent Technologies - Corey Shoop - 847-
620-5000
HVAC & Temperature Controls (JCK) - Please provide the required subcontractor and contact information for the temperature control system for the building system
O&M Service provider: Jones, Lang, LaSalle
POC: Joshua Bruschuk
Joshua.bruschuk@am.jll.com
630.930.1689
Please provide a phasing plan for bidding purposes as it relates to the areas and floors that will be occupied during the construction phase.
This will be clarified in the next construction documents issuance. For planning and pricing purposes, in Metcalfe, A121, general vicinity of column lines D1 to B3 will be occupied during construction and should be planned for construction toward the end of the construction schedule.
For Signs ST-3 CORRIDOR SIGN & ST-4
MECHANICAL ROOM SIGN please confirm if the signs use frame and end caps, if yes, please provide the material & thickness of frame & end caps as well.
Signs ST-3 and ST-4 do use end caps of a 3/8" by
3/8" and a backer panel of 1/8" thick. Signs ST-3 and ST-4 are to match building standard existing signs. All signs in public spaces are to be stainless steel horizontal grain satin finish
Please provide the material & thickness for all signs
Signs ST-1 and ST-2 are satin finish aluminum 1/8" thick. Signs ST-3 and ST-4 are stainless steel horizontal grain satin finish 3/8" thick.