This document includes mechanical plans and notes for the 12th floor of the Dr. A.H. McCoy Federal Building. The plans show the locations of existing variable air volume boxes, fan powered boxes, computer room units, and other HVAC equipment. Notes provide specifications for pipe insulation, refrigerant line sizing, VAV terminal unit pipe runout sizing, and call out the need to reference additional plan sheets for more information. Locations of rooms and spaces on the floor are labeled. The document appears to be record documents last revised in October 2013.

The related federal contract opportunity is a solicitation for a General Construction Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple-Award Term Contract with design-build capabilities for the states of Alabama and Mississippi. Solicitation number 47PE0119R0005 was issued by the General Services Administration Public Buildings Service Region 4 on February 1, 2019. The solicitation seeks an IDIQ contract vehicle for general construction services including design-build.

Jackson McCoy 12th Floor Existing VAV & Thermostat Locations (1)

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ENLARGED MECHANICAL ROOM PLAN

SHEET M412 FOR WORK TO BE DONE IN

THIS AREA.

T

T

1 2

E F

G

HDC

B

A

3 4

CRU 12-1

CRU 12-2

FPB 12-1FPB 12-2

FPB 12-3

FPB 12-4

FPB 12-5

FPB 12-6

FPB 12-7

FPB 12-8

FPB 12-9

FPB 12-10

FPB 12-11

FPB 12-12

FPB 12-13

FPB 12-14

FPB 12-15

FPB 12-16

FPB 12-17

FPB 12-18

FPB 12-20

FPB 12-21

FPB 12-22

FPB 12-23

FPB 12-24

FPB 12-19

VAV 12-1

VAV 12-2

VAV 12-3

VAV 12-4

VAV 12-5

VA

V

VAV 12-7

VAV 12-8

VA

V -9

VAV 12-10

VAV 12-11

VAV 12-12

VAV 12-13

VAV 12-14

VAV 12-15

VAV 12-16

NOTES BY SYMBOL " " GENERAL NOTES

A. PIPE INSULATION SHALL NOT BE INTERRUPTED

WHEN PASSING THRU (OR WITHIN) WALLS OR

SLABS.

B. REFRIGERANT PIPING TO/FROM COMPUTER ROOM

UNITS SHALL BE SIZED PER MANUFACTURER'S

RECOMMENDATIONS.

VAV TERMINAL UNIT - PIPE RUNOUT

SIZING CHART

HEATING WATER

FLOW (GPM)

PIPE RUNOUT

SIZE (IN.)

1/2

3/4

1-1/4

1-1/2

0 - 1.5

1.6 - 3.1

3.2 - 6.0

6.1 - 12.5

12.6 - 19

1. REFER TO ENLARGED PLAN SHEET M412 FOR CONTINUATION.

2. IEQ SAMPLE PORT. SEE CONTROL SCHEMATIC FOR DETAILS.

3. PROVIDE VAV BOX WITH 3-WAY VALVE.

4. THERMOSTAT SHALL BE USED FOR AIR HANDLER NIGHT SETBACK/OPTIMUM

START.

5. PROVIDE AND INSTALL VENTURI FLOW MEASURING DEVICE (EQUAL TO

GERAND VENTURIS). INSTALL VENTURI PER MANUFACTURERS MINIMUM

STRAIGHT PIPE DIAMETER REQUIREMENTS. SEE DETAIL.

3/4"

1"

1"

1"

2"

1-1/2"

1-1/2"

1-1/2"

1-1/2"

1-1/2"

1-1/4"

1-1/4" 1-1/4"

1-1/4"

1-1/4"

1"

1"

1"

1"

1"

3/4"

3/4"

TT

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

TT

T

T

T

T

T

T T

T

T

T

T

T

T

T

MEN

WOMEN

STAIRS

MECHANICAL

MECHANICAL

STAIRS

1214JANITOR

CLOSET

ELEC.

ELEC.

TELE.

ELEC.

ELEC.

ELEVATOR

LOBBY

TELE.

VACANT

GENERAL

STORAGE

FIREBIRD/TELE./SECURITY

TECH OPS

WORKSHOP

WEAPONS

STORAGE

WEAPONS

CLEANING

CLEAN

LAB

SHOWER

CLEAN

LAB

STORAGE

FITNESS

EXCERCISE

ROOM

WOMEN'S

LOCKER

MEN'S

LOCKER

BREAK

ROOM

TRAINING

EQUIP.

STORAGE

CORRIDOR

REST

ROOM

REST

ROOM

FIRS

CORRIDOR

TRAINING

CLASSROOM

OFFICE

CONFERENCE

FILE/SUPPLIES

OFFICE

RECEPTION

WAITING

WORKSTATION

AREA

OFFICE

BREAK

SERVER/MISC.

VESTIBULE

ID

BADGING

SUPPLIES

VACANT

S

S

S

RS/L

RS

/L

RS

/L

SEE ENLARGED MECHANICAL ROOM PLAN

SHEET M412 FOR WORK TO BE DONE IN

THIS AREA.

T

T

1 2

E F

G

HDC

B

A

3 4

CRU 12-1

CRU 12-2

FPB 12-1FPB 12-2

FPB 12-3

FPB 12-4

FPB 12-5

FPB 12-6

FPB 12-7

FPB 12-8

FPB 12-9

FPB 12-10

FPB 12-11

FPB 12-12

FPB 12-13

FPB 12-14

FPB 12-15

FPB 12-16

FPB 12-17

FPB 12-18

FPB 12-20

FPB 12-21

FPB 12-22

FPB 12-23

FPB 12-24

FPB 12-19

VAV 12-1

VAV 12-2

VAV 12-3

VAV 12-4

VAV 12-5

VA

V

VAV 12-7

VAV 12-8

VA

V -9

VAV 12-10

VAV 12-11

VAV 12-12

VAV 12-13

VAV 12-14

VAV 12-15

VAV 12-16

NOTES BY SYMBOL " " GENERAL NOTES

A. PIPE INSULATION SHALL NOT BE INTERRUPTED

WHEN PASSING THRU (OR WITHIN) WALLS OR

SLABS.

B. REFRIGERANT PIPING TO/FROM COMPUTER ROOM

UNITS SHALL BE SIZED PER MANUFACTURER'S

RECOMMENDATIONS.

VAV TERMINAL UNIT - PIPE RUNOUT

SIZING CHART

HEATING WATER

FLOW (GPM)

PIPE RUNOUT

SIZE (IN.)

1/2

3/4

1-1/4

1-1/2

0 - 1.5

1.6 - 3.1

3.2 - 6.0

6.1 - 12.5

12.6 - 19

1. REFER TO ENLARGED PLAN SHEET M412 FOR CONTINUATION.

2. IEQ SAMPLE PORT. SEE CONTROL SCHEMATIC FOR DETAILS.

3. PROVIDE VAV BOX WITH 3-WAY VALVE.

4. THERMOSTAT SHALL BE USED FOR AIR HANDLER NIGHT SETBACK/OPTIMUM

START.

5. PROVIDE AND INSTALL VENTURI FLOW MEASURING DEVICE (EQUAL TO

GERAND VENTURIS). INSTALL VENTURI PER MANUFACTURERS MINIMUM

STRAIGHT PIPE DIAMETER REQUIREMENTS. SEE DETAIL.

3/4"

1"

1"

1"

2"

1-1/2"

1-1/2"

1-1/2"

1-1/2"

1-1/2"

1-1/4"

1-1/4" 1-1/4"

1-1/4"

1-1/4"

1"

1"

1"

1"

1"

3/4"

3/4"

TT

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

TT

T

T

T

T

T

T T

T

T

T

T

T

T

T

MEN

WOMEN

STAIRS

MECHANICAL

MECHANICAL

STAIRS

1214JANITOR

CLOSET

ELEC.

ELEC.

TELE.

ELEC.

ELEC.

ELEVATOR

LOBBY

TELE.

VACANT

GENERAL

STORAGE

FIREBIRD/TELE./SECURITY

TECH OPS

WORKSHOP

WEAPONS

STORAGE

WEAPONS

CLEANING

CLEAN

LAB

SHOWER

CLEAN

LAB

STORAGE

FITNESS

EXCERCISE

ROOM

WOMEN'S

LOCKER

MEN'S

LOCKER

BREAK

ROOM

TRAINING

EQUIP.

STORAGE

CORRIDOR

REST

ROOM

REST

ROOM

FIRS

CORRIDOR

TRAINING

CLASSROOM

OFFICE

CONFERENCE

FILE/SUPPLIES

OFFICE

RECEPTION

WAITING

WORKSTATION

AREA

OFFICE

BREAK

SERVER/MISC.

VESTIBULE

ID

BADGING

SUPPLIES

VACANT

S

S

S

RS/L

RS

/L

RS

/L

SEE ENLARGED MECHANICAL ROOM PLAN

SHEET M412 FOR WORK TO BE DONE IN

THIS AREA.

T

T

1 2

E F

G

HDC

B

A

3 4

CRU 12-1

CRU 12-2

FPB 12-1FPB 12-2

FPB 12-3

FPB 12-4

FPB 12-5

FPB 12-6

FPB 12-7

FPB 12-8

FPB 12-9

FPB 12-10

FPB 12-11

FPB 12-12

FPB 12-13

FPB 12-14

FPB 12-15

FPB 12-16

FPB 12-17

FPB 12-18

FPB 12-20

FPB 12-21

FPB 12-22

FPB 12-23

FPB 12-24

FPB 12-19

VAV 12-1

VAV 12-2

VAV 12-3

VAV 12-4

VAV 12-5

VA

V

VAV 12-7

VAV 12-8

VA

V -9

VAV 12-10

VAV 12-11

VAV 12-12

VAV 12-13

VAV 12-14

VAV 12-15

VAV 12-16

NOTES BY SYMBOL " " GENERAL NOTES

A. PIPE INSULATION SHALL NOT BE INTERRUPTED

WHEN PASSING THRU (OR WITHIN) WALLS OR

SLABS.

B. REFRIGERANT PIPING TO/FROM COMPUTER ROOM

UNITS SHALL BE SIZED PER MANUFACTURER'S

RECOMMENDATIONS.

VAV TERMINAL UNIT - PIPE RUNOUT

SIZING CHART

HEATING WATER

FLOW (GPM)

PIPE RUNOUT

SIZE (IN.)

1/2

3/4

1-1/4

1-1/2

0 - 1.5

1.6 - 3.1

3.2 - 6.0

6.1 - 12.5

12.6 - 19

1. REFER TO ENLARGED PLAN SHEET M412 FOR CONTINUATION.

2. IEQ SAMPLE PORT. SEE CONTROL SCHEMATIC FOR DETAILS.

3. PROVIDE VAV BOX WITH 3-WAY VALVE.

4. THERMOSTAT SHALL BE USED FOR AIR HANDLER NIGHT SETBACK/OPTIMUM

START.

5. PROVIDE AND INSTALL VENTURI FLOW MEASURING DEVICE (EQUAL TO

GERAND VENTURIS). INSTALL VENTURI PER MANUFACTURERS MINIMUM

STRAIGHT PIPE DIAMETER REQUIREMENTS. SEE DETAIL.

3/4"

1"

1"

1"

2"

1-1/2"

1-1/2"

1-1/2"

1-1/2"

1-1/2"

1-1/4"

1-1/4" 1-1/4"

1-1/4"

1-1/4"

1"

1"

1"

1"

1"

3/4"

3/4"

TT

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

TT

T

T

T

T

T

T T

T

T

T

T

T

T

T

MEN

WOMEN

STAIRS

MECHANICAL

MECHANICAL

STAIRS

1214JANITOR

CLOSET

ELEC.

ELEC.

TELE.

ELEC.

ELEC.

ELEVATOR

LOBBY

TELE.

VACANT

GENERAL

STORAGE

FIREBIRD/TELE./SECURITY

TECH OPS

WORKSHOP

WEAPONS

STORAGE

WEAPONS

CLEANING

CLEAN

LAB

SHOWER

CLEAN

LAB

STORAGE

FITNESS

EXCERCISE

ROOM

WOMEN'S

LOCKER

MEN'S

LOCKER

BREAK

ROOM

TRAINING

EQUIP.

STORAGE

CORRIDOR

REST

ROOM

REST

ROOM

FIRS

CORRIDOR

TRAINING

CLASSROOM

OFFICE

CONFERENCE

FILE/SUPPLIES

OFFICE

RECEPTION

WAITING

WORKSTATION

AREA

OFFICE

BREAK

SERVER/MISC.

VESTIBULE

ID

BADGING

SUPPLIES

VACANT

S

S

S

RS/L

RS

/L

RS

/L

SEE ENLARGED MECHANICAL ROOM PLAN

SHEET M412 FOR WORK TO BE DONE IN

THIS AREA.

T

T

1 2

E F

G

HDC

B

A

3 4

CRU 12-1

CRU 12-2

FPB 12-1FPB 12-2

FPB 12-3

FPB 12-4

FPB 12-5

FPB 12-6

FPB 12-7

FPB 12-8

FPB 12-9

FPB 12-10

FPB 12-11

FPB 12-12

FPB 12-13

FPB 12-14

FPB 12-15

FPB 12-16

FPB 12-17

FPB 12-18

FPB 12-20

FPB 12-21

FPB 12-22

FPB 12-23

FPB 12-24

FPB 12-19

VAV 12-1

VAV 12-2

VAV 12-3

VAV 12-4

VAV 12-5

VA

V

VAV 12-7

VAV 12-8

VA

V -9

VAV 12-10

VAV 12-11

VAV 12-12

VAV 12-13

VAV 12-14

VAV 12-15

VAV 12-16

NOTES BY SYMBOL " " GENERAL NOTES

A. PIPE INSULATION SHALL NOT BE INTERRUPTED

WHEN PASSING THRU (OR WITHIN) WALLS OR

SLABS.

B. REFRIGERANT PIPING TO/FROM COMPUTER ROOM

UNITS SHALL BE SIZED PER MANUFACTURER'S

RECOMMENDATIONS.

VAV TERMINAL UNIT - PIPE RUNOUT

SIZING CHART

HEATING WATER

FLOW (GPM)

PIPE RUNOUT

SIZE (IN.)

1/2

3/4

1-1/4

1-1/2

0 - 1.5

1.6 - 3.1

3.2 - 6.0

6.1 - 12.5

12.6 - 19

1. REFER TO ENLARGED PLAN SHEET M412 FOR CONTINUATION.

2. IEQ SAMPLE PORT. SEE CONTROL SCHEMATIC FOR DETAILS.

3. PROVIDE VAV BOX WITH 3-WAY VALVE.

4. THERMOSTAT SHALL BE USED FOR AIR HANDLER NIGHT SETBACK/OPTIMUM

START.

5. PROVIDE AND INSTALL VENTURI FLOW MEASURING DEVICE (EQUAL TO

GERAND VENTURIS). INSTALL VENTURI PER MANUFACTURERS MINIMUM

STRAIGHT PIPE DIAMETER REQUIREMENTS. SEE DETAIL.

3/4"

1"

1"

1"

2"

1-1/2"

1-1/2"

1-1/2"

1-1/2"

1-1/2"

1-1/4"

1-1/4" 1-1/4"

1-1/4"

1-1/4"

1"

1"

1"

1"

1"

3/4"

3/4"

TT

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

TT

T

T

T

T

T

T T

T

T

T

T

T

T

T

MEN

WOMEN

STAIRS

MECHANICAL

MECHANICAL

STAIRS

1214JANITOR

CLOSET

ELEC.

ELEC.

TELE.

ELEC.

ELEC.

ELEVATOR

LOBBY

TELE.

VACANT

GENERAL

STORAGE

FIREBIRD/TELE./SECURITY

TECH OPS

WORKSHOP

WEAPONS

STORAGE

WEAPONS

CLEANING

CLEAN

LAB

SHOWER

CLEAN

LAB

STORAGE

FITNESS

EXCERCISE

ROOM

WOMEN'S

LOCKER

MEN'S

LOCKER

BREAK

ROOM

TRAINING

EQUIP.

STORAGE

CORRIDOR

REST

ROOM

REST

ROOM

FIRS

CORRIDOR

TRAINING

CLASSROOM

OFFICE

CONFERENCE

FILE/SUPPLIES

OFFICE

RECEPTION

WAITING

WORKSTATION

AREA

OFFICE

BREAK

SERVER/MISC.

VESTIBULE

ID

BADGING

SUPPLIES

VACANT

S

S

S

RS/L

RS

/L

RS

/L

SEE ENLARGED MECHANICAL ROOM PLAN

SHEET M412 FOR WORK TO BE DONE IN

THIS AREA.

T

T

1 2

E F

G

HDC

B

A

3 4

CRU 12-1

CRU 12-2

FPB 12-1FPB 12-2

FPB 12-3

FPB 12-4

FPB 12-5

FPB 12-6

FPB 12-7

FPB 12-8

FPB 12-9

FPB 12-10

FPB 12-11

FPB 12-12

FPB 12-13

FPB 12-14

FPB 12-15

FPB 12-16

FPB 12-17

FPB 12-18

FPB 12-20

FPB 12-21

FPB 12-22

FPB 12-23

FPB 12-24

FPB 12-19

VAV 12-1

VAV 12-2

VAV 12-3

VAV 12-4

VAV 12-5

VA

V

VAV 12-7

VAV 12-8

VA

V -9

VAV 12-10

VAV 12-11

VAV 12-12

VAV 12-13

VAV 12-14

VAV 12-15

VAV 12-16

NOTES BY SYMBOL " " GENERAL NOTES

A. PIPE INSULATION SHALL NOT BE INTERRUPTED

WHEN PASSING THRU (OR WITHIN) WALLS OR

SLABS.

B. REFRIGERANT PIPING TO/FROM COMPUTER ROOM

UNITS SHALL BE SIZED PER MANUFACTURER'S

RECOMMENDATIONS.

VAV TERMINAL UNIT - PIPE RUNOUT

SIZING CHART

HEATING WATER

FLOW (GPM)

PIPE RUNOUT

SIZE (IN.)

1/2

3/4

1-1/4

1-1/2

0 - 1.5

1.6 - 3.1

3.2 - 6.0

6.1 - 12.5

12.6 - 19

1. REFER TO ENLARGED PLAN SHEET M412 FOR CONTINUATION.

2. IEQ SAMPLE PORT. SEE CONTROL SCHEMATIC FOR DETAILS.

3. PROVIDE VAV BOX WITH 3-WAY VALVE.

4. THERMOSTAT SHALL BE USED FOR AIR HANDLER NIGHT SETBACK/OPTIMUM

START.

5. PROVIDE AND INSTALL VENTURI FLOW MEASURING DEVICE (EQUAL TO

GERAND VENTURIS). INSTALL VENTURI PER MANUFACTURERS MINIMUM

STRAIGHT PIPE DIAMETER REQUIREMENTS. SEE DETAIL.

3/4"

1"

1"

1"

2"

1-1/2"

1-1/2"

1-1/2"

1-1/2"

1-1/2"

1-1/4"

1-1/4" 1-1/4"

1-1/4"

1-1/4"

1"

1"

1"

1"

1"

3/4"

3/4"

TT

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

TT

T

T

T

T

T

T T

T

T

T

T

T

T

T

MEN

WOMEN

STAIRS

MECHANICAL

MECHANICAL

STAIRS

1214JANITOR

CLOSET

ELEC.

ELEC.

TELE.

ELEC.

ELEC.

ELEVATOR

LOBBY

TELE.

VACANT

GENERAL

STORAGE

FIREBIRD/TELE./SECURITY

TECH OPS

WORKSHOP

WEAPONS

STORAGE

WEAPONS

CLEANING

CLEAN

LAB

SHOWER

CLEAN

LAB

STORAGE

FITNESS

EXCERCISE

ROOM

WOMEN'S

LOCKER

MEN'S

LOCKER

BREAK

ROOM

TRAINING

EQUIP.

STORAGE

CORRIDOR

REST

ROOM

REST

ROOM

FIRS

CORRIDOR

TRAINING

CLASSROOM

OFFICE

CONFERENCE

FILE/SUPPLIES

OFFICE

RECEPTION

WAITING

WORKSTATION

AREA

OFFICE

BREAK

SERVER/MISC.

VESTIBULE

ID

BADGING

SUPPLIES

VACANT

S

S

S

RS/L

RS

/L

RS

/L

MECHANICAL

HVAC PIPING PLAN - 12TH FLOOR

M312

K. MILLER

R. BYRD

RECORD DOCUMENTS

October 15, 2013

RE

VI

SI

ON

B

LO

CK

DE

SI

GN

ER

ID

EN

TI

FI

CA

TI

ON

ST

AM

P

OR

S

EA

L

KE

Y

PL

AN

GR

AP

HI

C

SC

AL

E

PROJECT TITLE

GSA PROJECT NO.

SUBMISSION STAGE

SUBMISSION DATE

DRAWN BY

CHECKED BY

FLOOR NO.

DISCIPLINE

PLAN TYPE

SHEET NUMBER

AND FILENAME

VMS00002

SH

EE

T

Dr. A.H. McCoy Federal Building

OW

NE

R

ID

EN

TI

FI

CA

TI

ON

BU

ILD

IN

G

PR

OJ

EC

T

Professional Services Division Peachtree Summit Federal Building 401 W. Peachtree St.

Atlanta, GA 30308

Dr. A. H. McCoy Federal Building

Jackson, MS 39269-1620 Dr. A. H. McCoy Federal Building

100 W Capitol St

CO

NT

RA

CT

P R

O P

E R

T Y

O F

T H

E U

N

IT

E D

S T

A T

E S

G O

V E

R N

M E

N T

F

O R

O F

F

IC

IA

L

U S

E O

N L

Y

D O

N O

T R

E M

O V

E T

H

IS

N O

T

IC

E

P R

O P

E R

L Y

D E

S T

R O

Y D

O C

U M

E N

T S

W H

E N

N O

L O

N G

E R

N E

E D

E D

General Services Administration Public Buildings Service Southeast Sunbelt Region

CONST. CONTRACT NO.

DELIVER ORDER NO.

A/E CONTRACT NO.

BUILDING NAME

ADDRESS

CITY, STATE, ZIP

BUILDING NO.

MARK DATE DESCRIPTION

SCHWARTZ/SILVER

ARCHITECTS, PC

75 Kneeland Street Boston, Massachusetts 02111

Telephone 617/542-6650 Facsimile 617/951-0779

COOKE DOUGLASS FARR LEMONS

A R C H I T E C T S & E N G I N E E R S P A

3100 N. STATE STREET SUITE 200/JACKSON, MS 39216 / 601.366.3110

RECORD DOCUMENTS10-15-2013

0' 4' 8' 16' 32'

12TH FLOOR

SCALE 1/8"=1'0"

NORTH

HVAC PIPING PLAN