Text version
Remove built-in millwork security desk, granite countertops, decorative metal. Patch and repair existing terrazzo flooring.
Door should be removed as part of seperate project.
Conirm.
Remove storefront vestibule, including automatic sliding doors and hardware. Provide temporary, secure enclusore.
Remove existing storefront up to height of existing header panel. Remove existing trim as required for new work.
Sawcut and remove existing slab as required for new vestibule
Remove built-in millwork security desk, granite countertops, decorative metal. Patch and repair existing terrazzo flooring.
Remoe security barrier turnstiles. Patch and repair existing terrazzo flooring.
1/4" = 1'-0" 1/4" = 1'-0"
8' - 0"
14' - 6"
8' - 0" 1' - 3"1' - 3"
EXTENTS OF EX SECURITY
DESK. PATCH + REPAIR
TERRAZZO AS REQUIRED.
10' - 10" 5' - 0"
EXISTING STOREFRONT
CURTAINWALL AND EXITS
TO REMAIN
EX SOFIT TO REMAIN. NEW DOWNLIGHTING. INFILL
NEW ACT GRID + DRYWALL SOFFIT AS REQUIRED.
MAIN SECURITY DESKSSTL + GLASS
SECURITY BARRIER
EX MILLWORK CLAD
COLUMNS TO REMAIN
Guard Post
EX MILLWORK-
CLAD COLUMNS
TO REMAIN
GRANITE COUNTERTOPS +
MILLORK DESK (BELOW)
PROVIDE POWER +
DATA OUTLETS BUILT-IN AT
EACH WORKSTATION.
14'-0".
MILLWORK VENEER DESK W/ 1/2"
EDGEBAND + 2" SOLID STOCK
TRIM.
SSTL ACCENT PANELS W/
CONCEALED FASTENERS
SSTL POST + GLASS SECURITY
BARRIER
SCREENING EQUIPMENT
BY OWNER
MILLWORK VENEER DESK W/ 1/2"
EDGEBAND + 2" SOLID STOCK
TRIM.
SSTL ACCENT PANELS W/
CONCEALED FASTENERS
New terrazzo flooring to match existing. Includes matching three custom colors and pattern of expansion and control joints.
New millwork desk with stone countertops and stainless steel accents. See addiitional notes and drawings.
New security barrier with stainless steel posts and framing with tempered, laminated glass infill panels. Install baseplate within shallow recess, allow for terrazzo cover.
Provide power and 2-jack data connections at existing millwork columns and main desk as indicated for computer and screening equipment.
SSTL BRACKET W/
COUNTERSUNK HARDWARE
RECESS BASEPLATE INTO
EX SLAB. GROUT SOLID +
PATCH TERRAZZO
Mantain check-in and screening capabilities during construction.
Provide seperation, dust and noise control between construction spaces and open lobby area.
Prioritize off-hours and weekend work for active construction work.
1/4" = 1'-0"
1/4" = 1'-0"
1/2" = 1'-0"
1/2" = 1'-0"
SECURITY DESK FRONT
1/2" = 1'-0"
1" = 1'-0"
FIRST LOOR KEY PLAN
1" = 1'-0"
PHASE 2: DEMO EX CONCIERGE DESK.
COMPLETE FIT-OUT AND RENOVATIONS
TEMPERED GLASS +
MILLWORK STOREFRONT
ASSESMBLY.
SSTL ACCENT PANELS W/
CONCEALED FASTENERS
MILLWORK VENEER PANELS W/
1/2" EDGEBAND + 2" SOLID STOCK
TRIM.
TERRAZZO BASE TO MATCH
EX FLOORING
SCREENING
EQUIPMENT BY
OWNER
REPAIR + REPLACE EX
BRICK PAVERS
RECESSED WALK-OFF
CARPET
NEW STOREFRONT
CURTAINWALL, WITH AUTO-
OPERATED SLIDING DOORS.
NEW STOREFRONT
CURTAINWALL, WITH
OPERABLE DOORS. EXISTING CURTAINWALL TO
REMAIN
STL + GLASS SECURITY
BARRIER. PATCH + REPAIR
TERRAZZO AT POST INSTALLATION
EXTENTS OF EX SECURITY
DESK. PATCH + REPAIR
TERRAZZO AS REQUIRED.
EX STAIRS TO
MAIN LEVEL
EXTENTS OF EX SECURITY
DESK. PATCH + REPAIR
TERRAZZO AS REQUIRED.
PATCH + REPAIR TERRAZZO
AT DEMOLISHED VESTIBULE
18' - 4"
GRANITE COUNTERTOPS +
MILLWORK DESK (BELOW)
PROVIDE POWER + DATA
OUTETS BUILT-IN AT WORKSTATION.
PROVIDE POWER + DATA
FOR SCREENING EQUIPMENT
BY OWNER
19' - 9"
TEMPERED GLASS + MILLWORK STOREFRONT
ASSEMBLY. DRYWALL HEADER TO EX GWB CEILING ABOVE.
REPAIR + REPLACE EX
BRICK PAVERS
RECESSED WALK-OFF
CARPET
CABINET UNIT HEATER
(ABOVE)
AT REPLACEMENT STOREFRONT,
TIE INTO WEATHERPOOFING
SIM TO EXISTING
STANDING SEAM METAL
ROOM ASSEMBLY
GWB CEILING +
DOWNLIGHTS
TRANSITION BETWEEN
NEW AND EX SLAB
Scope Notes
New terrazzo flooring to match existing. Includes matching three custom colors and pattern of expansion and control joints.
New millwork desk with stone countertops and stainless steel accents. See addiitional notes and drawings.
New security barrier with stainless steel posts and framing with tempered, laminated glass infill panels.
New storefront vestiibule and auto-operated sliding doors. Include perimeter footing, roofing assembly.
New storefront curtainwall, tied into existing system. Include 2 exit doors with panic hardware.
1/2" = 1'-0"
1/4" = 1'-0"
1/2" = 1'-0"
1/2" = 1'-0" 1/2" = 1'-0"
PHASE 1: BUILD NEW VESTIBULE
AND SECURITY DESK.
PHASSE 2: DEMO EX VESTIBULE
AND SECRITY DESK. MANTAIN
ACCESS THROUGH LOBBY.
EXISTING CURTAINWALL TO
REMAIN
STL + GLASS SECURITY
BARRIER. PATCH + REPAIR
TERRAZZO AT POST INSTALLATION
MAIN SECURITY DESK
EXTENTS OF EX SECURITY
DESK. PATCH + REPAIR
TERRAZZO AS REQUIRED.
EX STAIRS TO
MAIN LEVEL
REPAIR + REPLACE EX
BRICK PAVERS
RECESSED WALK-OFF
CARPET
NEW STOREFRONT
CURTAINWALL, WITH AUTO-
OPERATED SLIDING DOORS.
EXISTING CURTAINWALL TO
REMAIN
STL + GLASS SECURITY
BARRIER. PATCH + REPAIR
TERRAZZO AT POST INSTALLATION
EXTENTS OF EX SECURITY
DESK. PATCH + REPAIR
TERRAZZO AS REQUIRED.
EX STAIRS TO
MAIN LEVEL
PATCH + REPAIR TERRAZZO
AT DEMOLISHED VESTIBULE
1/4" = 1'-0" 1/4" = 1'-0"