Remove built-in millwork security desk, granite countertops, decorative metal. Patch and repair existing terrazzo flooring.

Door should be removed as part of seperate project.

Conirm.

Remove storefront vestibule, including automatic sliding doors and hardware. Provide temporary, secure enclusore.

Remove existing storefront up to height of existing header panel. Remove existing trim as required for new work.

Sawcut and remove existing slab as required for new vestibule

Remove built-in millwork security desk, granite countertops, decorative metal. Patch and repair existing terrazzo flooring.

Remoe security barrier turnstiles. Patch and repair existing terrazzo flooring.

1/4" = 1'-0" 1/4" = 1'-0"

8' - 0"

14' - 6"

8' - 0" 1' - 3"1' - 3"

EXTENTS OF EX SECURITY

DESK. PATCH + REPAIR

TERRAZZO AS REQUIRED.

10' - 10" 5' - 0"

EXISTING STOREFRONT

CURTAINWALL AND EXITS

TO REMAIN

EX SOFIT TO REMAIN. NEW DOWNLIGHTING. INFILL

NEW ACT GRID + DRYWALL SOFFIT AS REQUIRED.

MAIN SECURITY DESKSSTL + GLASS

SECURITY BARRIER

EX MILLWORK CLAD

COLUMNS TO REMAIN

Guard Post

EX MILLWORK-

CLAD COLUMNS

TO REMAIN

GRANITE COUNTERTOPS +

MILLORK DESK (BELOW)

PROVIDE POWER +

DATA OUTLETS BUILT-IN AT

EACH WORKSTATION.

14'-0".

MILLWORK VENEER DESK W/ 1/2"

EDGEBAND + 2" SOLID STOCK

TRIM.

SSTL ACCENT PANELS W/

CONCEALED FASTENERS

SSTL POST + GLASS SECURITY

BARRIER

SCREENING EQUIPMENT

BY OWNER

MILLWORK VENEER DESK W/ 1/2"

EDGEBAND + 2" SOLID STOCK

TRIM.

SSTL ACCENT PANELS W/

CONCEALED FASTENERS

New terrazzo flooring to match existing. Includes matching three custom colors and pattern of expansion and control joints.

New millwork desk with stone countertops and stainless steel accents. See addiitional notes and drawings.

New security barrier with stainless steel posts and framing with tempered, laminated glass infill panels. Install baseplate within shallow recess, allow for terrazzo cover.

Provide power and 2-jack data connections at existing millwork columns and main desk as indicated for computer and screening equipment.

SSTL BRACKET W/

COUNTERSUNK HARDWARE

RECESS BASEPLATE INTO

EX SLAB. GROUT SOLID +

PATCH TERRAZZO

Mantain check-in and screening capabilities during construction.

Provide seperation, dust and noise control between construction spaces and open lobby area.

Prioritize off-hours and weekend work for active construction work.

1/4" = 1'-0"

1/4" = 1'-0"

1/2" = 1'-0"

1/2" = 1'-0"

SECURITY DESK FRONT

1/2" = 1'-0"

1" = 1'-0"

FIRST LOOR KEY PLAN

1" = 1'-0"

PHASE 2: DEMO EX CONCIERGE DESK.

COMPLETE FIT-OUT AND RENOVATIONS

TEMPERED GLASS +

MILLWORK STOREFRONT

ASSESMBLY.

SSTL ACCENT PANELS W/

CONCEALED FASTENERS

MILLWORK VENEER PANELS W/

1/2" EDGEBAND + 2" SOLID STOCK

TRIM.

TERRAZZO BASE TO MATCH

EX FLOORING

SCREENING

EQUIPMENT BY

OWNER

REPAIR + REPLACE EX

BRICK PAVERS

RECESSED WALK-OFF

CARPET

NEW STOREFRONT

CURTAINWALL, WITH AUTO-

OPERATED SLIDING DOORS.

NEW STOREFRONT

CURTAINWALL, WITH

OPERABLE DOORS. EXISTING CURTAINWALL TO

REMAIN

STL + GLASS SECURITY

BARRIER. PATCH + REPAIR

TERRAZZO AT POST INSTALLATION

EXTENTS OF EX SECURITY

DESK. PATCH + REPAIR

TERRAZZO AS REQUIRED.

EX STAIRS TO

MAIN LEVEL

EXTENTS OF EX SECURITY

DESK. PATCH + REPAIR

TERRAZZO AS REQUIRED.

PATCH + REPAIR TERRAZZO

AT DEMOLISHED VESTIBULE

18' - 4"

GRANITE COUNTERTOPS +

MILLWORK DESK (BELOW)

PROVIDE POWER + DATA

OUTETS BUILT-IN AT WORKSTATION.

PROVIDE POWER + DATA

FOR SCREENING EQUIPMENT

BY OWNER

19' - 9"

TEMPERED GLASS + MILLWORK STOREFRONT

ASSEMBLY. DRYWALL HEADER TO EX GWB CEILING ABOVE.

REPAIR + REPLACE EX

BRICK PAVERS

RECESSED WALK-OFF

CARPET

CABINET UNIT HEATER

(ABOVE)

AT REPLACEMENT STOREFRONT,

TIE INTO WEATHERPOOFING

SIM TO EXISTING

STANDING SEAM METAL

ROOM ASSEMBLY

GWB CEILING +

DOWNLIGHTS

TRANSITION BETWEEN

NEW AND EX SLAB

Scope Notes

New terrazzo flooring to match existing. Includes matching three custom colors and pattern of expansion and control joints.

New millwork desk with stone countertops and stainless steel accents. See addiitional notes and drawings.

New security barrier with stainless steel posts and framing with tempered, laminated glass infill panels.

New storefront vestiibule and auto-operated sliding doors. Include perimeter footing, roofing assembly.

New storefront curtainwall, tied into existing system. Include 2 exit doors with panic hardware.

1/2" = 1'-0"

1/4" = 1'-0"

1/2" = 1'-0"

1/2" = 1'-0" 1/2" = 1'-0"

PHASE 1: BUILD NEW VESTIBULE

AND SECURITY DESK.

PHASSE 2: DEMO EX VESTIBULE

AND SECRITY DESK. MANTAIN

ACCESS THROUGH LOBBY.

EXISTING CURTAINWALL TO

REMAIN

STL + GLASS SECURITY

BARRIER. PATCH + REPAIR

TERRAZZO AT POST INSTALLATION

MAIN SECURITY DESK

EXTENTS OF EX SECURITY

DESK. PATCH + REPAIR

TERRAZZO AS REQUIRED.

EX STAIRS TO

MAIN LEVEL

REPAIR + REPLACE EX

BRICK PAVERS

RECESSED WALK-OFF

CARPET

NEW STOREFRONT

CURTAINWALL, WITH AUTO-

OPERATED SLIDING DOORS.

EXISTING CURTAINWALL TO

REMAIN

STL + GLASS SECURITY

BARRIER. PATCH + REPAIR

TERRAZZO AT POST INSTALLATION

EXTENTS OF EX SECURITY

DESK. PATCH + REPAIR

TERRAZZO AS REQUIRED.

EX STAIRS TO

MAIN LEVEL

PATCH + REPAIR TERRAZZO

AT DEMOLISHED VESTIBULE

1/4" = 1'-0" 1/4" = 1'-0"