General Construction Services for the Hurricane Repair Project at the Jose V. Toledo U. S. Courthouse, San Juan, Puerto Rico
Solicitation number
47PC0620R0001
Issued by

About this file

This solicitation package requests proposals for general construction services for hurricane repair projects at the Jose V. Toledo U.S. Courthouse in San Juan, Puerto Rico. The General Services Administration Public Buildings Service is seeking to award an indefinite delivery/indefinite quantity contract for a one year base period plus four one-year options to complete repairs and renovations resulting from hurricane damage. Offerors must be small businesses with average annual receipts less than $36.5 million according to NAICS code 236220. A pre-proposal site visit will be held on November 18, 2019, and proposals are due by the date and time specified in the solicitation. Interested parties must register for the site visit and submit any requests for information by the deadlines provided. The selected contractor will be responsible for repairs, construction, and project management services.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A1 – EXPERIENCE SUMMARY TABLE

FORM A1 - Experience Summary Table

Name of Offeror:____________________________

Project 1 Project 2 Project 3 Example Project (for Illustrative purposes only, not a real project)

Project Name X Building

Location (City, State, Country) San Juan, Puerto Rico

Contract Amount ($ USD) $100,000

Final Contract Amount ($USD) $150,000

Completion Date (Substantial Completion) 01 January 2019

Which elements of Experience does the project demonstrate?

Contract involved the replacement of Clay Tiles at Roof (Yes or No) Yes

Performed phase construction within an occupied and operational site, campus or multi-story building (Yes or No)

Yes

New or Replacement Roof Work over 5,000 square feet (Yes or No) Yes

Performed phased construction on a construction project with a minimum value of $500,000. (Yes or No)

Yes

Construction within an occupied multistory building (Yes or No) Yes

Construction Project Completed within the past ten (10) years (Yes or No) Yes

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at Jose V. Toledo

Attachment A2 – Project Fact Sheet Instructions: Complete all blocks. Limit the length to a maximum of three (3) pages per project, any information beyond the first three (3) pages will not be considered.

1. Name of Company that Performed this Work (this should be the name of your company, the Offeror)

Role (Prime GC, CMc, Subcontractor, Joint-Venture Partner, etc.):

2. Name of Project

3. Location of Project

4. Project Owner Information 4a. Agency or Company Name

4b. Point of Contact (Name, Phone, and Email)

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at Jose V. Toledo

5. Date Started

6. Date Completed (Substantial Completion)

7. Contract Amount ($ USD)

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at Jose V. Toledo

8. Description of Project and Work Actually Performed by your Company

8a. Size of project (gross square feet)

8b. Project Photos (provide at least two (2))

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at Jose V. Toledo

8d. Narrative description of the work including the major disciplines and trades involved. Make sure you identify the work you performed, the work that you subcontracted, and whether any work was performed by others.

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at Jose V. Toledo

ATTACHMENT A3 – KEY PERSONNEL RESUME

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at Jose V. Toledo

ATTACHMENT A4 - PAST PERFORMANCE QUESTIONNAIRE

PBS PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor/Offeror to complete Blocks 1-4)

1. CONTRACTOR/OFFEROR INFORMATION

Firm Name:

Address:

Phone Number: DUNs Number:

Contact Name

Email Address: : Contact Phone Number:

2. GENERAL WORK INFORMATION

Work performed as: ☐ Prim e C ontractor ☐ S ub C ontractor ☐ Joint V enture ☐ O ther (P lease explain):

Percent (%) of project work performed:

If a subcontractor, who was the prime (Name/Phone #):

3. CONTRACT INFORMATION

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: ☐ Firm Fixed P rice ☐ C ost R eim bursem ent ☐ O ther (P lease explain)

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at Jose V. Toledo

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. PROJECT DESCRIPTION

Complexity of Work: ☐ H igh ☐ M ed ☐ R outine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at Jose V. Toledo

INSTRUCTIONS FOR CLIENTS COMPLETING THIS QUESTIONNAIRE: PBS requests that the client completes this questionnaire and submits it directly back to the offeror. The offeror will submit the completed questionnaire to PBS with their proposal, and may duplicate this questionnaire for future submission on PBS solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to PBS. Please contact the offeror for PBS POC information. The government reserves the right to verify any and all information on this form.

Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner.

There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.

The contractor's proposed actions appear

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at only marginally effective or were not fully implemented.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

CLIENT INFORMATION

Client Point of Contact Information Name:

Title:

Phone Number:

Email Address:

Project Information Contract Type:

Contract Title:

Contract Location:

Describe your role in the project:

Date Questionnaire was completed (mm/dd/yy):

Client’s Signature:

Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance.

1. QUALITY: E VG S M U N

(a) Quality of technical data/report preparation efforts. ☐ ☐ ☐ ☐ ☐ ☐

(b) Ability to meet quality standards specified for technical performance. ☐ ☐ ☐ ☐ ☐ ☐

(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance. ☐ ☐ ☐ ☐ ☐ ☐

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at

(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).

2. SCHEDULE/TIMELINESS OF PERFORMANCE: E VG S M U N

(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.)

(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract. ☐ ☐ ☐ ☐ ☐ ☐

3. CUSTOMER SATISFACTION: E VG S M U N

(a) To what extent were the end users satisfied with the project? ☐ ☐ ☐ ☐ ☐ ☐

(b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication).

(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? ☐ ☐ ☐ ☐ ☐ ☐

(d) Overall customer satisfaction. ☐ ☐ ☐ ☐ ☐ ☐

4. MANAGEMENT/ PERSONNEL/LABOR E VG S M U N

(a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? ☐ ☐ ☐ ☐ ☐ ☐

(b) Ability to hire, apply, and retain a qualified workforce to this effort. ☐ ☐ ☐ ☐ ☐ ☐

4. MANAGEMENT/ PERSONNEL/LABOR - Continued E VG S M U N

(c) Government Property Control. ☐ ☐ ☐ ☐ ☐ ☐

(d) Knowledge/expertise demonstrated by contractor personnel. ☐ ☐ ☐ ☐ ☐ ☐

(e) Utilization of Small Business concerns. ☐ ☐ ☐ ☐ ☐ ☐

(f) Ability to simultaneously manage multiple projects with multiple disciplines. ☐ ☐ ☐ ☐ ☐ ☐

(g) Ability to assimilate and incorporate changes in requirements ☐ ☐ ☐ ☐ ☐ ☐

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at and/or priority, including planning, execution and response to Government changes.

(h) Effectiveness of overall management (including ability to effectively lead, manage and control the program). ☐ ☐ ☐ ☐ ☐ ☐

5. COST/FINANCIAL MANAGEMENT E VG S M U N

(a) Ability to meet the terms and conditions within the contractually agreed price(s)? ☐ ☐ ☐ ☐ ☐ ☐

(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.

(c) If this is/was a Government cost type contract, or a CMc/CMc at Risk Contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).

(d) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in comment section below.)

☐ Yes ☐ N o

(e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.)

☐ Yes ☐ N o

(f) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.)

☐ Yes ☐ N o

6. SAFETY/SECURITY E VG S M U N

(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).

(b) Contractor complied with all security requirements for the project and personnel security requirements. ☐ ☐ ☐ ☐ ☐ ☐

7. GENERAL E VG S M U N

(a) Ability to successfully respond to emergency and/or surge ☐ ☐ ☐ ☐ ☐ ☐

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below ☐ ☐ ☐ ☐ ☐ ☐

(c) In summary, provide an overall rating for the work performed by this contractor. ☐ ☐ ☐ ☐ ☐ ☐

8. SUSTAINABILITY

Did this project include sustainable methods, materials, processes or certifications? (See Whole Building Design Guide for acceptable requirements. Link to guide WBDG Green Building Standards and Certification Systems.) (If yes, please explain in the comments section below.)

☐ Yes ☐ N o

9. SUMMARY

Would you hire or work with this firm again? (If no, please explain in the comments section below.) ☐ Yes ☐ N o

COMMENTS SECTION

Please provide additional information below, and attach additional pages if necessary.

Please provide responses to the above questions (if applicable) and/or additional remarks. Also please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

Solicitation 47PC0620R0001-General Construction Services for the Puerto Rico Hurricane Recovery Project at Jose V. Toledo http://www.wbdg.org/resources/gbs.php#rcas http://www.wbdg.org/resources/gbs.php#rcas