This document provides details for a federal solicitation seeking general construction services for hurricane repair projects at the Jose V. Toledo U.S. Courthouse in San Juan, Puerto Rico. The General Services Administration is seeking proposals for repair work with an estimated price range of $2-4 million to be completed within 362 calendar days. This requirement is set aside only for small businesses with average annual sales under $36.5 million as defined by NAICS code 236220 for commercial and institutional building construction. Proposals are due by December 13, 2019 and must be submitted electronically to the contracting officer. A pre-proposal conference and site visit will be held on November 18, 2019 to provide an overview of the project and site. Requests for information must be submitted by December 6th.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Conference & Site Visit Puerto Rico Hurricane Repair Project
Jose V. Toledo U.S. Courthouse at San Juan, PR
Solicitation 47PC0620R0001
November 18, 2019
Agenda
1 Opening Remarks and Introductions
2 General Information about the Solicitation
3 Project Overview Presentation
4 Site Visit
Disclaimer
• The information contained in this presentation is for informational purposes only.
• In the event of a discrepancy between the information contained herein and the solicitation documents, the solicitation documents will take precedence.
Opening Remarks and Introductions
Opening Remarks and Introductions
• Pre-Proposal Conference Goals:
– Provide general information about the Solicitation
– Promote awareness of the project
– Encourage maximum participation
• All information discussed today is “For Information Only”
Introducing the Project Team
GSA Team:
Natalia Lugo-Viña Cruz Contracting Officer
Rey Martinez Project Manager
Richard Kurrasch Contracting Officer Representative
Owner
4 Osvaldo Laboy Caribbean Branch Chief GSA PMD
Introducing the Project Team
Dattner Architects
Jacobs
Architect / Engineer
Construction Manager as Advisor (CMa)
• Paul Bauer – Project Executive
• Eduardo Bolivar – Project Manager
• Ron Terrell – Project Coordinator
• Tamary Alvarez – Construction PM
General Information about the Solicitation
Solicitation Information
Project Name: General Construction Services for the Hurricane Repair Project at the Jose V. Toledo U.S. Courthouse, San Juan, Puerto Rico
Solicitation Number: 47PC0620R0001
Estimated Price Range: $2,000,000 - $4,000,000
Performance Period: 362 calendar days
Set-Aside: Total Small Business
Government Point of Entry
• All information, amendments and questions concerning the solicitation will be electronically posted at official U.S. Government website www.beta.sam.gov
• Interested parties are strongly encouraged to register to the solicitation notice to receive notification of actions, including posting of amendments. However, offerors are advised to check the solicitation site frequently as they are responsible for obtaining amendments.
http://www.beta.sam.gov
System for Award Management
• Interested firms must be registered in the System for Award Management (SAM), in order to receive procurement documents and, ultimately, a contract award.
• Firms can register via the internet site at https://www.sam.gov or by contacting SAM Service Desk at http://www.fsd.gov https://www.sam.gov/ http://www.fsd.gov/
Socioeconomic Considerations
• This requirement will be issued as a Total Small Business Set Aside in accordance with Federal Acquisition Regulation (FAR) 6.203.
• The North American Industry Classification System (NAICS) code associated with this procurement is 236220, Commercial and Institutional Building Construction. The U.S. Small Business Administration size standard is $36.5 million dollars in annual sales and receipts averaged over the last three (3) completed fiscal years.
Discussions
• The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306 (a))
• Therefore, the offeror’s initial proposal should contain the offeror’s best terms form a price and technical standpoint.
• The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
Requests for Information (RFIs)
• The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers, but does not warrant that all such requests will be answered within 10 calendar days.
• Prospective Offerors should make such requests not less than 7 calendar days prior to the date set of receipt of offers.
• RFIs shall be submitted in writing to the Contracting Officer:
– Natalia Lugo-Viña Cruz, natalia.lugo-vinacruz@gsa.gov
Please copy the following people as well on the RFIs:
olga.rodriguez@gsa.gov and rey.martinez@gsa.gov mailto:natalia.lugo-vinacruz@gsa.gov mailto:olga.rodriguez@gsa.gov mailto:rey.martinez@gsa.gov
Receipt of Offers
• In order to be considered for award, offers conforming to the requirements of the Solicitation must be received electronically on the following date and time:
– Date: Friday, December 13th
– Time: 4:00PM (PR local time)
• Only electronic proposal will be accepted at:
– Natalia Lugo-Viña Cruz, natalia.lugo-vinacruz@gsa.gov
• Paper copies will not be accepted.
mailto:natalia.lugo-vinacruz@gsa.gov
Project Overview
Dattner Preproposal Presentation.pdf
Site Visit
Site Visit
• The site visit will be conducted in groups of 6 attendees
• Questions will not be answered during the site visit and shall be submitted through the formal RFI process.
• Areas to be visited:
– Roof
– Skylight
– Temporary office and storage
– Loading dock
– Generator room
– Building Exterior
Thank you for participating!
Submit inquiries in writing to Contracting Officer:
- Natalia Lugo-Vina Cruz, natalia.lugo-vinacruz@gsa.gov