Solicitation Amendment 47PB0024R0068_0004 2025 06 12.pdf

PDF 570 KB Posted

Attached to
Construction Manager as Constructor (CMc) Services for the Land Port of Entry (LPOE), Coburn Gore, ME
Solicitation number
47PB0024R0068
Issued by

About this file

This document is a Solicitation Amendment for the Coburn Gore Land Port of Entry (LPOE) Construction Manager as Constructor (CMc) project. The amendment (Number 0004) extends the proposal due date to June 24, 2025 at 2:00 PM EST and introduces new requirements for a Project Labor Agreement (PLA). Key additions include mandatory negotiation of a project labor agreement with labor organizations, requirements for contractors and subcontractors to become parties to the agreement, and a stipulation that an executed and acceptable PLA must be provided prior to exercising the Guaranteed Maximum Price (GMP) Construction Option.

The amendment modifies the original solicitation by incorporating FAR provisions 52.222-33 and 52.222-34, which detail specific requirements for labor organizations, construction definitions, and project labor agreement terms. The project involves constructing a new Land Port of Entry in Coburn Gore, Maine, with an estimated total construction cost between $90M and $100M. The procurement will follow a two-step CMc method, with design phase services anticipated to commence in Fall/Winter 2025 and construction phase work expected to be awarded in Summer 2026, with a construction performance period of approximately 32 months.

View the file

Other files

File Type Posted
Solicitation Amendment 47PB0024R0068_0005.pdf PDF
C. Phase I Agreement Document - Two-Step CMc Updated 2025 06 12.pdf PDF
B. Phase I Solicitation Document - Two-Step CMc Updated 2025 06 12.pdf PDF
Solicitation Amendment 47PB0024R0068_0003 2025 05 29.pdf PDF
Solicitation Amendment 47PB0024R0068_0002 2025 05 21.pdf PDF
B. Phase I Solicitation Document - Two-Step CMc Amendment 01 Update 2025 05 02.pdf PDF
Solicitation Amendment 47PB0024R0068_0001 2025 05 02.pdf PDF
C. Phase I Agreement Document - Two-Step CMc Amendment 01 Update 2025 05 02.pdf PDF
Phase I Pre-Proposal Conference Final Slides 2025 04 22.pdf PDF
Coburn Gore Phase I Pre-Proposal Conference Attendance 2025 04 22.pdf PDF
10. PBS Core Building Standards Memorandum 2025 02 24.pdf PDF
11. GSA Commissioning Guide September 2020.pdf PDF
G. CBP Non-Disclosure Agreement Form.pdf PDF
D. Coburn Gore Offeror Representations and Certifications 2025 04 07.pdf PDF
C. Phase I Agreement Document - Two-Step CMc 2025 04 07.pdf PDF
1. Coburn Gore LPOE CMc SOW Final 2025 03 27.pdf PDF
3. Coburn Gore AE SOW_FINAL 2024 08 06.pdf PDF
A. RFP 47PB0024R0068 SF1442 2025 04 08.pdf PDF
E. Past Performance Questionnaire 2025 04 07.pdf PDF
5. Colby Coburn Gore Three-Phase Final Report 2022 12 22.pdf PDF
4. Coburn Gore LPOE - CMa w CxP SOW 2023 10 12.pdf PDF
B. Phase I Solicitation Document - Two-Step CMc 2025 04 07.pdf PDF
2. Coburn Gore Three phase SOW Final 2025 04 04.pdf PDF
6. P-120 Public Buildings Service Cost and Schedule Management Policy Requirements, October 2022.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

Description of Modification Continuation Page

Amendment 04 â The Solicitation 47PB0024R0068, Coburn Gore LPOE CMc New Construction, is hereby amended as follows:

1. The proposal due date is extended to June 24, 2025 at 2:00PM EST.

2. Phase I Solicitation, Table of Contents, Section IV. The following is added to Section IV:

IV.J. Project Labor Agreement

3. Phase I Solicitation, Section IV. FAR/GSAR Solicitation Provisions. The following Provision is added to Section

IV:

IV.J. Project Labor Agreement (PLA)

FAR 52.222-33 Notice of Requirement for Project Labor Agreement (JAN 2024), Alternate II

(a) Definitions. As used in this provision, the following terms are defined in clause 52.222-34, Project Labor Agreement, of this solicitation âconstruction,â âlabor organization,â âlarge-scale construction project,â and âproject labor agreement.â

(b) If awarded the contract, the Offeror shallâ

(1) Negotiate or become a party to a project labor agreement with one or more labor organizations for the term of the resulting construction contract; and

(2) Require its subcontractors to become a party to the resulting project labor agreement.

AN EXECUTED AND ACCEPTABLE PROJECT LABOR AGREEMENT WILL BE REQUIRED PRIOR TO THE

EXERCISE OF THE GUARANTEED MAXIMUM PRICE (GMP) CONSTRUCTION OPTION.

(End of Provision)

4. Phase I Agreement, Table of Contents, Section IV.B. The following is added to Section IV as Number 13:

FAR 52.222-34 Project Labor Agreement (JAN 2024), Alternate I (JAN 2024)

5. Phase I Agreement, Section IV.B., Clauses Incorporated in Full Text. The following is added to Section IV.B. as Number 13:

FAR 52.222-34 Project Labor Agreement (JAN 2024), Alternate I (JAN 2024)

(a) Definitions. As used in this clause- Construction means construction, reconstruction, rehabilitation, modernization, alteration, conversion, extension, repair, or improvement of buildings, structures, highways, or other real property.

Labor organization means a labor organization as defined in 29 U. S.C. 152(5) of which building and construction employees are members.

Large-scale construction project means a Federal construction project within the United States for which the total

47PB0024R0068/0004

estimated cost of the construction contract(s) to the Federal Government is $35 million or more.

Project labor agreement means a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C.158(f).

(b) The Contractor shallâ

(1) Negotiate or become a party to a project labor agreement with one or more labor organizations for the term of this construction contract; and

(2) Submit an executed copy of the project labor agreement to the Contracting Officer as required in the solicitation.

(c) The project labor agreement reached pursuant to this clause shall-

(1) Bind the Contractor and all subcontractors engaged in construction on the construction project to comply with the project labor agreement;

(2) Allow the Contractor and all subcontractors to compete for contracts and subcontracts without regard to whether they are otherwise parties to collective bargaining agreements;

(3) Contain guarantees against strikes, lockouts, and similar job disruptions;

(4) Set forth effective, prompt, and mutually binding procedures for resolving labor disputes arising during the project labor agreement;

(5) Provide other mechanisms for labor-management cooperation on matters of mutual interest and concern, including productivity, quality of work, safety, and health; and

(6) Fully conform to all statutes, regulations, Executive orders, and agency requirements.

(d) Any project labor agreement reached pursuant to this clause does not change the terms of this contract or provide for any price adjustment by the Government.

(e) The Contractor shall maintain in a current status throughout the life of the contract the project labor agreement entered into pursuant to this clause.

(f) Subcontracts. The Contractor shall require subcontractors engaged in construction on the construction project to agree to any project labor agreement negotiated by the prime contractor pursuant to this clause, and shall include the substance of paragraphs (d) through (f) of this clause in all subcontracts with subcontractors engaged in construction on the construction project.

AN EXECUTED AND ACCEPTABLE PROJECT LABOR AGREEMENT WILL BE REQUIRED PRIOR TO THE

EXERCISE OF THE GUARANTEED MAXIMUM PRICE (GMP) CONSTRUCTION OPTION.

(End of clause)

All other information provided in the Solicitation remains the same.

NOTE: Offerors are reminded to acknowledge receipt of this amendment by one of the methods cited in Block 11.

47PB0024R0068/0004

topmostSubform[0]:
Page2[0]:
TextField1[5]:
TextField1[2]:
TextField1[1]:
TextField1[4]:
TextField1[3]:
TextField1[0]:
Page1[0]:
Code[0]: 1PQ
Copies[0]: 1
CheckBox9[0]: 1
Code[2]: 1PQ
NameandTitleOfficer[0]: James Adamo, Director, Acquisition Management Division
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 4
AmendmentNo[0]: 0004
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]: Acquisition Management Division (1PQ) GSA/PBS

10 CAUSEWAY ST., RM 1100

BOSTON, MA 02222-1077 USA

FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQ1PC-24-0025
Dated9B[0]: 4/8/2025
C13[0]:
Description[0]:

[See Description of Modification Continuation Page]

NotExtended[0]: Off
Code[1]:
AmendmentNo[1]: 47PB0024R0068
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 6/12/2025
A13[0]:
ProjectNo[0]:
CheckBox13C[0]: Off
Extended[0]: 1
D13[0]:
IssuedBy[0]: Acquisition Management Division (1PQ) GSA/PBS

10 CAUSEWAY ST., RM 1100

BOSTON, MA 02222-1077 USA

NameandTitleSigner[0]: