Phase I Pre-Proposal Conference Final Slides 2025 04 22.pdf

PDF 646 KB Posted

Attached to
Construction Manager as Constructor (CMc) Services for the Land Port of Entry (LPOE), Coburn Gore, ME
Solicitation number
47PB0024R0068
Issued by

About this file

These slides outline the Phase I Pre-Proposal Conference for the Coburn Gore, Maine Land Port of Entry (LPOE) Construction Manager as Constructor (CMc) project. The U.S. General Services Administration (GSA) is conducting a two-phase Request for Proposal (RFP) #47PB0024R0068 for design and potential construction services, with a total estimated contract value between $90-$100 million. The project involves modernizing a historic 1932 border inspection station, with key objectives including maintaining full operational capabilities, site security, and utility continuity during construction while preserving the site's historic character.

The Phase I technical proposal is due on May 27, 2025, at 2:00 PM EST, with evaluation based on four non-price factors: 1) Experience in Similar Projects (30%), 2) Management and Technical Approach (25%), 3) Qualifications of Key Personnel (20%), and 4) Past Performance (20%). Phase II will include a 5% evaluation factor for Small Business Participation. The solicitation uses an advisory multi-step process, with an initial advisory shortlist to be developed after Phase I proposal review. Design phase services are expected to commence in Fall/Winter 2025, with potential construction phase work anticipated to begin in Summer 2026 and last approximately 32 months.

View the file

Other files

File Type Posted
Solicitation Amendment 47PB0024R0068_0005.pdf PDF
C. Phase I Agreement Document - Two-Step CMc Updated 2025 06 12.pdf PDF
B. Phase I Solicitation Document - Two-Step CMc Updated 2025 06 12.pdf PDF
Solicitation Amendment 47PB0024R0068_0004 2025 06 12.pdf PDF
Solicitation Amendment 47PB0024R0068_0003 2025 05 29.pdf PDF
Solicitation Amendment 47PB0024R0068_0002 2025 05 21.pdf PDF
B. Phase I Solicitation Document - Two-Step CMc Amendment 01 Update 2025 05 02.pdf PDF
Solicitation Amendment 47PB0024R0068_0001 2025 05 02.pdf PDF
C. Phase I Agreement Document - Two-Step CMc Amendment 01 Update 2025 05 02.pdf PDF
Coburn Gore Phase I Pre-Proposal Conference Attendance 2025 04 22.pdf PDF
10. PBS Core Building Standards Memorandum 2025 02 24.pdf PDF
11. GSA Commissioning Guide September 2020.pdf PDF
G. CBP Non-Disclosure Agreement Form.pdf PDF
D. Coburn Gore Offeror Representations and Certifications 2025 04 07.pdf PDF
C. Phase I Agreement Document - Two-Step CMc 2025 04 07.pdf PDF
1. Coburn Gore LPOE CMc SOW Final 2025 03 27.pdf PDF
3. Coburn Gore AE SOW_FINAL 2024 08 06.pdf PDF
A. RFP 47PB0024R0068 SF1442 2025 04 08.pdf PDF
E. Past Performance Questionnaire 2025 04 07.pdf PDF
5. Colby Coburn Gore Three-Phase Final Report 2022 12 22.pdf PDF
4. Coburn Gore LPOE - CMa w CxP SOW 2023 10 12.pdf PDF
B. Phase I Solicitation Document - Two-Step CMc 2025 04 07.pdf PDF
2. Coburn Gore Three phase SOW Final 2025 04 04.pdf PDF
6. P-120 Public Buildings Service Cost and Schedule Management Policy Requirements, October 2022.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Proposal Conference

Phase I RFP 47PB0024R0068 Coburn Gore, ME LPOE

CMc Construction Services April 22, 2025

12:00-2:00PM EST

Ground Rules

• Presentation will be approximately 45 minutes; remaining time will be for any questions and/or discussion;

• Please hold all questions until the end of the presentation;

• We are not going to cover the entire solicitation today; we only have time to hit some highlights; this conference is not a substitution for reading and understanding the solicitation;

• Nothing said here today will change the Request for Proposal (RFP) as written. All changes to the RFP will be made via a formal Amendment;

• Questions:

• If a question requires a response that should be provided to all potential offerors, we will ask that you put that question in writing – to be answered later;

• If a question can be responded to today without impacting all potential offerors, we will provide an answer today.

GSA PBS Points of Contract

• Contracting Officer: James Adamo; 857-207-0555; james.adamo@gsa.gov

• Alternate Contracting Officer: Michele Valenza; 617-565-8508;

michele.valenza@gsa.gov

• Contracting Specialist: Caitlyn Egan; 857-208-3798; caitlyn.egan@gsa.gov

• Project Manager and Contracting Officer’s Representative (COR): Li-Hang Wang;

(617) 306-5344; li-hang.wang@gsa.gov

• Architect-Engineer (AE) Design Contractor: Dattner Architects

• Construction Manager as Advisor (CMa): Jacobs Technology Inc.

mailto:james.adamo@gsa.gov mailto:michele.valenza@gsa.gov mailto:caitlyn.egan@gsa.gov mailto:li-hang.wang@gsa.gov

The Requirement

• Delivery Method: Construction Manager as Constructor (CMc);

• Solicitation Method: Advisory Multi-Step RFP

• Phase I Technical Proposal is due on May 27, 2025, at 2:00PM EST

• Government evaluation and Advisory Shortlist (exclusion from the advisory shortlist shall not preclude offerors from submitting a Phase II Proposal); The Advisory Short List is not made public.

• Phase II RFP will be issued around July 2025 with design concept – requires a Phase II Technical

Proposal and the Price Proposal;

• A second Pre-Proposal Conference will be held prior to the submission of Phase II proposals. Site visits will be by appointment only.

• The Phase II RFP requirements contained within the Phase I RFP are for informational purposes only and are subject to change with the Phase II RFP. Examples include, but are not limited to, the sustainability requirements and pricing structure.

Period of Performance

• Design Phase Services

• The Contractor shall commence performance of the Design Phase Services within ten (10) calendar days after the Contractor receives the Notice to Proceed (NTP);

• Design Phase Services shall be complete upon acceptance of all deliverables required by the Design Phase Services Statement of Work;

• Note: Design Completion is expected to be achieved in June 2026.

• Construction Services (the Work)

• If the Government exercises the GMP Option, the Contractor shall commence performance of the construction within ten (10) calendar days after the Contractor receives the NTP for the Work.

Period of Performance (cont.)

• Construction Services (the Work)

• If the Government exercises the GMP Option, the Contractor shall achieve Substantial Completion of the Construction Phase Work no later than 32 months from issuance of Notice to Proceed (NTP) for the Work.

• If the Government exercises the GMP Option, the Contractor shall achieve Contract Completion within sixty (60) calendar days of Substantial Completion.

Phase I Solicitation

• The Phase I documents are comprised of:

• Standard Form (SF) 1442 – Solicitation, Offer and Award – Phase I;

• Phase I Solicitation;

• Phase I Agreement and Attachments to the Agreement;

• Representations and Certifications

• Past Performance Questionnaire (PPQ);

• CBP Non-Disclosure Agreement Form

• To be filled out in order to access controlled documents on SAM.gov, offerors must also have an active SAM registration to receive access;

• Coburn Gore Phase I Master Attachment List

• All of these documents are included on the SAM.gov solicitation post from April 8, 2025

Phase I Master Attachment List

Receipt of Phase I Offers

• Offers conforming to the requirements of the Solicitation must be received no later than 2:00PM EST on May 27, 2025;

• Offerors shall submit electronic copies of their proposal via email to the Contracting Officer, James Adamo (james.adamo@gsa.gov), Michele Valenza (michele.Valenza@gsa.gov) and Caitlyn Egan (caitlyn.egan@gsa.gov). Hard copy proposals are not required;

• The maximum file size is 25mb. Files larger than 25mb need to be separated by volume and emailed separately;

• Also refer to the RFP Section V.A, FAR 52.215-1, Instructions to Offerors — Competitive Acquisition (Nov 2021), particularly paragraph (c), Submission, modification, revision, and withdrawal of proposals.

mailto:james.adamo@gsa.gov mailto:michele.Valenza@gsa.gov

Phase I Proposals

• The Phase I submission shall be organized in precisely the order and format below.

The proposal volumes shall be tabbed and organized into the following sections, with associated page limitations. Submissions that do not follow these instructions, or otherwise include documentation that is difficult to read, may result in lower ratings or may be rejected completely.

Phase I Proposals (cont.)

• Please refer to additional proposal submission, content, and format requirements in the Phase I Solicitation Section II, Proposals;

• Please follow requirements exactly so as not to lose consideration during Government proposal evaluations;

• Standards for Government evaluation of factors are contained in the Phase I Solicitation Section VII.F., Non-Price Factors.

Evaluation Factor 1 – Experience in Providing Design Phase Services and Construction Phase Services on Similar Projects

(30%)

This factor considers the Offeror’s experience as a firm in providing comparable Design Phase and Construction Phase Services for “similar” projects that the Offeror has completed.

• Please note “Similar Project” definition;

• Provide three (3) “similar” projects completed in the last ten (10) years (before the proposal due date) in which the Offeror performed as a Construction Manager-as-Constructor, a Construction Manager-at-Risk, a Design-Builder, or a Design-Builder with Bridging;

• Current similar projects must be 100% complete (closed-out) to be considered relevant for this factor;

• Please note narrative requirements for this evaluation factor. Respond to every detail requested.

Evaluation Factor 2 – Management and Technical Approach (Design Phase Services and Construction Phase Services) (25%)

This factor considers the Offeror’s project management plan which indicates the methods and means they will employ to ensure management of the project in a manner which will maximize the opportunity for successful completion that is on-time, on-budget, and within quality expectations.

The Offeror shall provide a detailed project management plan that includes the following:

• Overall approach;

• Staffing Plan;

• Quality Control Plan;

• Safety Plan;

Evaluation Factor 2 – Management and Technical Approach (Design Phase Services and Construction Phase Services) (25%)

This factor considers the Offeror’s project management plan which indicates the methods and means they will employ to ensure management of the project in a manner which will maximize the opportunity for successful completion that is on-time, on-budget, and within quality expectations.

The Offeror shall provide a detailed project management plan that includes the following:

• Overall approach;

• Staffing Plan;

• Quality Control Plan;

• Safety Plan;

Evaluation Factor 3 – Qualifications and Experience of Key Personnel (20%)

The Offeror shall identify the personnel they propose to fill the key team member positions listed below and state their roles and responsibilities on the Project. The Offeror shall provide evidence of the competency, past performance, qualifications and related experience of key team members.

• The Offeror shall provide resumes for each key team member clearly indicating their currently held position/title, proposed project position/title, education, qualifications, professional licensing, personal awards received, and work experience (including roles) over the last ten (10) years;

• Offerors shall provide a matrix chart clearly identifying the roles that key team members held on the projects submitted under Evaluation Factor 1.

Evaluation Factor 3 – Qualifications and Experience of Key Personnel (20%) (cont.)

• If the key team members did not work on any of the three projects submitted under Evaluation Factor 1, provide contact information for two references for each such individual who has thorough knowledge of the details of the individual’s performance in a similar position on a similar project;

• Team members shall include those with the expertise listed in Section II.C.4 of the CMc Statement of Work. Suggested team members are listed in the Phase I Solicitation Section II.C.3.

Evaluation Factor 4 – Past Performance in Providing Design Phase Services and Construction Phase Services on Similar

Projects Provided under Factor #1 (20%)

This factor considers the Offeror’s Past Performance with regard to the projects submitted under Evaluation Factor 1, as a predictor of the Offeror’s compliance with contract requirements and overall quality of performance.

• For each of the (3) “similar” projects submitted under Evaluation Factor 1, the Offeror must submit a Past Performance Questionnaire (PPQ), completed by the applicable client. Completed PPQs should be submitted with the proposal;

• Also include performance recognition documents received within the last (6) years, such as awards, award fee determinations, customer letters of recommendation, and any other forms of performance recognition.

Evaluation Factor 4 – Past Performance in Providing Design Phase Services and Construction Phase Services on Similar

Projects Provided under Factor #1 (20%) (cont.)

• The Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), for all offeror team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal;

• While the Government may elect to consider data from a variety of sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

Proposal Evaluations

• The Government will award a contract resulting from this Solicitation to the responsible Offeror whose offer conforming to the Solicitation will be the best value to the Government, Total Evaluated Price and other factors considered. In addition to Total Evaluated Price, the following non-price factors shall be used to evaluate offers:

• PHASE I:

• Experience in Providing Design Phase Services and Construction Phase Services on

Similar Projects (30%);

• Management and Technical Approach (Design Phase Services and Construction

Phase Services) (25%);

• Qualifications and Experience of Key Personnel (20%);

• Past Performance in Providing Design Phase Services and Construction Phase

Services on Similar Projects Provided under Factor 1 (20%)

Proposal Evaluations (cont.)

• PHASE II:

• Small Business Participation (5%)

• In total, Non-Price Factors, when combined, are significantly more important than the Total Evaluated Price. The degree of importance of price could become greater depending upon the equality of the non-price proposals. Price becomes more controlling as the equality of competing non-price proposals becomes greater;

• The Government intends to make contract award without discussions with offerors.

Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. However, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

Important Considerations for the Phase II RFP – Thinking Ahead

Phase II Requirements of Note

• Magnitude of Construction;

• Price;

• Sustainability (i.e., Inflation Reduction Act)

• Small Business Subcontracting Plan (Large Businesses only);

• Cost Accounting Standards (CAS) and Open Book Accounting

Magnitude of Construction

• The estimated Total Contract Price is between $90M and $100M

• Offerors are cautioned that price proposals exceeding this range may be determined ineligible for award based on budgetary limitations;

Price

• The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s);

• Total Evaluated Price shall be calculated using the prices indicated in the Price Proposal, using the following pricing schedule:

Pricing Schedule

Small Business Subcontracting Plan

• A Small Business Subcontracting Plan, in accordance with FAR 52.219-9, is required to be submitted with Phase II offers. See the attachment list for Phase II for a model plan;

• There is also a Small Business Participation non-price evaluation factor worth 5% overall. This factor is used to evaluate (a) the offeror’s past performance indicating the extent to which the offeror attained applicable goals for small business participation under contracts that required subcontracting plans; and (b) the offeror’s proposed approach to small business participation under this requirement.

Cost Accounting Standards (CAS)

• The Offeror must submit certification from a Certified Public Accountant (CPA) that the Offeror’s accounting system provides for the following:

• The accounting system is in accordance with Generally Accepted Accounting Principles (GAAP);

• There is proper segregation of direct costs and indirect costs;

• There is proper identification and accumulation of direct costs by contract.

• There is a labor time distribution system that charges direct and indirect labor appropriately.

• The GAAP Certification must be provided from the accountant directly to the Government within 10 days of submission of a proposal.

Cost Accounting Standards (CAS) (cont.)

• Large Business Offerors only – The Offeror must submit all disclosures in accordance with FAR 52.230-1, Cost Accounting Standards Notice and Certifications and FAR 52.230-7, Proposal Disclosure – Cost Accounting Practice Changes.

Requests for Clarification or Interpretation

The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers, but does not warrant that all such requests will be answered if submitted less than twenty (20) calendar days from the date set for receipt of offers.

Prospective Offerors should make such requests by email to the CO James Adamo at james.adamo@gsa.gov, the CS Caitlyn Egan at caitlyn.egan@gsa.gov, and the Project

Manager Li-Hang Wang at li-hang.wang@gsa.gov, but under no circumstances less than twenty (20) calendar days prior to the date set for receipt of offers.

mailto:james.adamo@gsa.gov mailto:li-hang.wang@gsa.gov

Questions?