Amendment 0012_Solicitation 47PA0825R0002 Block and Index Calculator Spreadsheet - Block (Shaped Hedge) Index - Sample Calculations.xls
XLS spreadsheet 154 KB Posted
- Solicitation number
- 47PA0825R0002
- Issued by
- Not on record
About this file
This file is a Block and Index Calculator Spreadsheet for the GSA's FY25 Streamlined Retail Electric Solicitation (Solicitation Number 47PA0825R0002), detailing a complex electricity procurement auction across five different pricing groups in the ISONE and CAISO regions. The solicitation covers electricity supply for utilities in Connecticut, Maine, Massachusetts, New Hampshire, and Rhode Island, with a total contract volume of 1,656,181,689 kWh across 155 accounts, and contract terms ranging from 12 to 60 months starting between September 2025 and December 2025.
The procurement uses a sophisticated "Shaped Hedge" bidding model where suppliers submit two parameters: a fixed price for the shaped hedge load and an index adder price. The calculation involves complex factors including fixed and indexed quantities, line loss adjustments, and wholesale price estimates. Bidders will participate in auctions on 7/30/25 for different pricing groups, with bid deadlines ranging from 11:05 AM to 11:30 AM EDT. The solicitation is a full requirements contract, allowing multiple awards, and requires suppliers to be licensed to provide electric supply to retail customers in the applicable states. Technical proposals are due by 3:00 PM EST on March 7, 2025.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shaped Hedge Explanation
| Bids will be submitted as two parameters: 1) a fixed price for the shaped hedge load and 2) an index adder price for the entire load. |
| The two input parameters will be used to calculate a resulting Bid Amount. This Bid Amount will be the price that bidders see as the "Low Bid" designated on the platform. Therefore, it is important that bidders fully understand the below calculation and the associated inputs: |
| Calculation |
| (Low Bid displayed) = ((Fixed Quantity at Meter * (1 + Line Loss Adjustment) * Fixed Price Bid Amount) + (Index Quantity at Meter * (1 + Line Loss Adjustment) * Index Wholesale Price Estimate) + (Total Quantity at Meter * (1 + Line Loss Adjustment) * Adder Bid Amount))/Total Quantity at Meter (Term) |
| Inputs |
| 1. Fixed Quantity at Meter = the volume of energy from the shaped hedge, delivered to the customer meter. Note, the shaped hedge amount purchased and delivered to the delivery point will be this amount grossed up for line losses to the customer meter. |
| 2. Index Quantity at Meter = the volume of energy purchased for remaining load delivered to the customer meter. |
| 3. Line Loss Adjustment = the loss factor between the delivery point and the customer meter used in the calculation. |
| 4. Total Quantity = Fixed Quantity at Meter + Index Quantity at Meter. |
| 5. Index Price Estimate = a forward looking estimate of the price per unit for the exposed (index) load over the term of the contract. |
| 6. Fixed Price Bid Amount = submitted bid. |
| 7. Adder Bid Amount = submitted bid. |
| Items 1-5 will be provided to you prior to the auction and displayed on the RFP View page for the event. Items 6-7 are the supplier bids submitted through the platform. |
| An excel spreadsheet is available upon request that can assist you with the evaluation calculation. |
&C&"Arial"&8&K000000INTERNAL&1#
Block & Index & Shaped Hedg 25
| Block Product Model | PLATFORM INPUTS IN BOLD BOX | |||||
| SUPPLIER INPUTS SHADED | PLEASE NOTE - the Spreadsheet will be updated for each Pricing Group with Group-specific information prior to the auction date. | |||||
| SAMPLE | LOW BID DISPLAYED | |||||
| Field Type | Field Label | Old Value | Sample Value | Units | Notes | |
| Calc | Total Quantity (Term) | 38,782,307 | 0 | kWh | =Indexed Quantity at Meter + Fixed Quantity at Meter | |
| Enel X Input | Fixed Quantity at Meter | 5,463,255 | kWh | The volume of load to be hedged in units at the Meter | ||
| Enel X Input | Indexed Quantity at Meter | 33,319,052 | kWh | The volume of load to float on a market index in units at the Meter | ||
| Enel X Input | Line Loss Adjustment | 7.50% | 0.000% | percent (e.g. 0.05=5%) | Line losses from the utility, relative to the metered load. Note: Must convert loss factor if the utility handles the calculation differently. | |
| Enel X Input | Index Price Estimate | 0.0690 | $/kWh | Estimate of average wholesale price of energy not including the fixed (hedged) load. (weighted average price for load following energy) | ||
| Calc | Indexed Quantity at Delivery Point | 36,020,596 | 0 | kWh | =Indexed Quantity at Meter * (1 + Line Loss Adjustment) | |
| Calc | Fixed Quantity at Delivery Point | 5,906,222 | 0 | kWh | =Fixed Quantity at Meter * (1 + Line Loss Adjustment) | |
| Calc | Total Usage at Delivery Point | 41,926,818 | 0 | kWh | =Indexed Quantity at Delivery Point + Fixed Quantity at Delivery Point | |
| Supplier Input | Fixed Price Bid Amount ($/kWh) | 0.0751 | $/kWh | Supplier Bid input for the Shaped Hedge (See GSA Solicitation Section D.1, Calculation Input item # 6 | ||
| Supplier Input | Supply Service Fee - Adder Bid Amount ($/kWh) | 0.0100 | $/kWh | Supplier Bid input for the Supply Service Fee Bid (See GSA Solicitation Section D.1, Calculation Input item #7 | ||
| Calc | Bid Amount ($/kWh) | 0.08552 | 0.00000 | $/kWh | (Low Bid displayed) = ((Fixed Quantity at Meter * (1 + Line Loss Adjustment) * Fixed Price Bid Amount) + (Index Quantity at Meter * (1 + Line Loss Adjustment) * Index Wholesale Price Estimate) + (Total Quantity at Meter * (1 + Line Loss Adjustment) * Adder Bid Amount))/Total Quantity at Meter (Term) | |
| Enel X Input | Shaped Hedge Description | e.g. "Percent Hedge: a 7x24 85% hedge | ||||
| See "Explanation" tab for further details. |
&C&"Arial"&8&K000000INTERNAL&1#
Auction Schedule
| EXHIBIT 1 SOLICIATATION NUMBER 47PA0825R002 - ISONE & CAISO | ||||||||||||||||
| Enel X RFP # | Auction Date | ISO/RTO | Auction Bid Deadline (EDT) | Pricing Group | Utilities | States | Agencies | Required Renewable Load Following Percentage (Per Section A12 of the Solicitation) | Pricing Product (See Attachment 3 of the Solicitation) | Billing (Per Section A.7 of the Solicitation) | Term in Months | Contract Start Month | Contract End Month | No of Accounts | * Contract Annual kWh Usage (Contract Volumes) | Term Auction Volumes / Contract Volumes kWh Usage |
| 98875 | 7/30/25 | ISONE | 11:05 AM | 1 | CL&P / UI | CT | 3 | 0.0% | Block and Index | Dual From Supplier Only | 60 | Sep-25 | Sep-30 | 35 | 42,109,077 | 210,545,385 |
| 98876 | 7/30/25 | ISONE | 11:10 AM | 2 | CMP | ME | 2 | 0.0% | Block and Index | Dual From Supplier Only | 60 | Sep-25 | Sep-30 | 5 | 16,830,138 | 84,150,689 |
| 98877 | 7/30/25 | ISONE | 11:15 AM | 3 | NGRID MA / NSTAR / Unitil MA / WMECO | MA | 9 | 0.0% | Block and Index | Dual From Supplier Only | 12, 46 or 60 | Sep-25 | Sept 26, July 29 or Sept 30 | 81 | 177,224,627 | 883,292,115 |
| 98878 | 7/30/25 | ISONE | 11:20 AM | 4 | PSNH / Unitil NH | NH | 4 | 0.0% | Block and Index | Dual From Supplier Only | 60 | Sep-25 | Sep-30 | 8 | 21,164,756 | 105,823,780 |
| 98879 | 7/30/25 | ISONE | 11:25 AM | 5 | NGRID RI | RI | 2 | 0.0% | Block and Index | Dual From Supplier Only | 60 | Sep-25 | Sep-30 | 7 | 19,258,696 | 96,293,480 |
| 98880 | 7/30/25 | CAISO | 11:30 AM | 6 | PGE / SCE / SDG&E | CA | 1 | 0.0% | Firm Fixed Price | Dual From Supplier Only | 60 | Dec-25 | Dec-30 | 19 | 55,215,248 | 276,076,240 |
| TOTALS | 155 | 331,802,542 | 1,656,181,689 | |||||||||||||
| 1) | The most recent twelve month's worth of monthly data available from the utility is included in this Exhibit 1. Interval data, for the accounts that have interval data, has been posted to the Enel X announcement site | |||||||||||||||
| for this procurement at: | https://www.exchange.enelx.com/WebPortal/AnnouncementView.aspx?id=17150 | |||||||||||||||
| 2) | Per Section D.2 (4) of the Solicitation, "The Offeror agrees to hold the prices in its price proposal firm from the time prices are submitted on auction day until 1:30 p.m. EST on each auction day." | |||||||||||||||
| 3) | * Note: This is a full requirements contract, the " Contract Annual kWh Usage (Contract Volumes)" must be used for contracting purposes in relation to Section A.13 Load Changes. |
https://www.exchange.enelx.com/WebPortal/AnnouncementView.aspx?id=17150
Group 1 - RFP 98875
| Block Product Model | PLATFORM INPUTS IN BOLD BOX | |||||||||||||||||||||||||||||||
| SUPPLIER INPUTS SHADED | PLEASE NOTE - the Spreadsheet will be updated for each Pricing Group with Group-specific information prior to the auction date. | |||||||||||||||||||||||||||||||
| LOW BID DISPLAYED | ||||||||||||||||||||||||||||||||
| Field Type | Field Label | Old Value | Sample Value | Units | Notes | |||||||||||||||||||||||||||
| Calc | Total Quantity (Term) | 38,782,307 | 210,545,385 | kWh | =Indexed Quantity at Meter + Fixed Quantity at Meter | |||||||||||||||||||||||||||
| Enel X Input | Fixed Quantity at Meter | 5,463,255 | 78,401,799 | kWh | The volume of load to be hedged in units at the Meter | |||||||||||||||||||||||||||
| Enel X Input | Indexed Quantity at Meter | 33,319,052 | 132,143,587 | kWh | The volume of load to float on a market index in units at the Meter | |||||||||||||||||||||||||||
| Enel X Input | Line Loss Adjustment | 7.50% | 0.000% | percent (e.g. 0.05=5%) | Line losses from the utility, relative to the metered load. Note: Must convert loss factor if the utility handles the calculation differently. | |||||||||||||||||||||||||||
| Enel X Input | Index Price Estimate | 0.0690 | 0.0471 | $/kWh | Estimate of average wholesale price of energy not including the fixed (hedged) load. (weighted average price for load following energy) | Sum of Historical Annual kWh Usage (for reference only) | Month | |||||||||||||||||||||||||
| Pricing Group | ISO/RTO | Capacity Tag Effective Date | Transmission | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Grand Total | ||||||||||||||||
| Calc | Indexed Quantity at Delivery Point | 36,020,596 | 132,143,587 | kWh | =Indexed Quantity at Meter * (1 + Line Loss Adjustment) | 1 | ISONE | 6/1/24 | N/A | 3,218,568 | 3,165,268 | 2,984,470 | 3,082,816 | 3,403,691 | 4,357,252 | 4,610,257 | 4,315,714 | 3,559,812 | 3,290,515 | 2,983,039 | 3,137,675 | 42,109,077 | ||||||||||
| Calc | Fixed Quantity at Delivery Point | 5,906,222 | 78,401,799 | kWh | =Fixed Quantity at Meter * (1 + Line Loss Adjustment) | Hedge % | 85% | 85% | - 0 | - 0 | - 0 | - 0 | 85% | 85% | - 0 | - 0 | - 0 | 85% | ||||||||||||||
| Calc | Total Usage at Delivery Point | 41,926,818 | 210,545,385 | kWh | =Indexed Quantity at Delivery Point + Fixed Quantity at Delivery Point | Hedge Vol | 2,735,783 | 2,690,478 | - 0 | - 0 | - 0 | - 0 | 3,918,718 | 3,668,357 | - 0 | - 0 | - 0 | 2,667,024 | 15,680,360 | 78,401,799 | ||||||||||||
| Supplier Input | Fixed Price Bid Amount ($/kWh) | 0.0751 | $/kWh | Supplier Bid input for the Shaped Hedge (See GSA Solicitation Section D.1, Calculation Input item # 6 | Index Vol | 482,785 | 474,790 | 2,984,470 | 3,082,816 | 3,403,691 | 4,357,252 | 691,539 | 647,357 | 3,559,812 | 3,290,515 | 2,983,039 | 470,651 | 26,428,717 | 132,143,587 | |||||||||||||
| Supplier Input | Supply Service Fee - Adder Bid Amount ($/kWh) | 0.0100 | $/kWh | Supplier Bid input for the Supply Service Fee Bid (See GSA Solicitation Section D.1, Calculation Input item #7 | ||||||||||||||||||||||||||||
| Calc | Bid Amount ($/kWh) | 0.08552 | 0.02954 | $/kWh | (Low Bid displayed) = ((Fixed Quantity at Meter * (1 + Line Loss Adjustment) * Fixed Price Bid Amount) + (Index Quantity at Meter * (1 + Line Loss Adjustment) * Index Wholesale Price Estimate) + (Total Quantity at Meter * (1 + Line Loss Adjustment) * Adder Bid Amount))/Total Quantity at Meter (Term) | |||||||||||||||||||||||||||
| Enel X Input | Shaped Hedge Description | e.g. "Percent Hedge: a 7x24 85% hedge | ||||||||||||||||||||||||||||||
| See "Explanation" tab for further details. | ||||||||||||||||||||||||||||||||
| CT | ||||||||||||||||||||||||||||||||
| Month | Year | Block | Index | Fwd Price | Buffer | Total Index | Index Cost | |||||||||||||||||||||||||
| 9 | 2025 | 0 | 3,559,812 | $ 42.32 | 2% | $ 43.17 | $ 153,671.53 | |||||||||||||||||||||||||
| 10 | 2025 | 0 | 3,290,515 | $ 41.33 | 2% | $ 42.16 | $ 138,712.59 | |||||||||||||||||||||||||
| 11 | 2025 | 0 | 2,983,039 | $ 59.57 | 2% | $ 60.76 | $ 181,240.46 | |||||||||||||||||||||||||
| 12 | 2025 | 2667023.75 | 470,651 | $ 100.57 | 2% | $ 102.58 | $ 48,280.37 | |||||||||||||||||||||||||
| 1 | 2026 | 2735782.8 | 482785.2 | $ 137.19 | 2% | $ 139.93 | $ 67,558.44 | |||||||||||||||||||||||||
| 2 | 2026 | 2690477.8 | 474790.2 | $ 116.04 | 2% | $ 118.36 | $ 56,197.93 | |||||||||||||||||||||||||
| 3 | 2026 | 0 | 2984470 | $ 64.60 | 2% | $ 65.89 | $ 196,650.32 | |||||||||||||||||||||||||
| 4 | 2026 | 0 | 3082816 | $ 47.73 | 2% | $ 48.69 | $ 150,093.35 | |||||||||||||||||||||||||
| 5 | 2026 | 0 | 3403691 | $ 41.65 | 2% | $ 42.48 | $ 144,589.67 | |||||||||||||||||||||||||
| 6 | 2026 | 0 | 4357252 | $ 46.80 | 2% | $ 47.73 | $ 207,978.03 | |||||||||||||||||||||||||
| 7 | 2026 | 3918718.45 | 691538.55 | $ 65.01 | 2% | $ 66.31 | $ 45,853.18 | |||||||||||||||||||||||||
| 8 | 2026 | 3668356.9 | 647357.1 | $ 53.27 | 2% | $ 54.33 | $ 35,172.70 | |||||||||||||||||||||||||
| 9 | 2026 | 0 | 3559812 | $ 43.90 | 2% | $ 44.78 | $ 159,398.84 | |||||||||||||||||||||||||
| 10 | 2026 | 0 | 3290515 | $ 42.20 | 2% | $ 43.04 | $ 141,631.51 | |||||||||||||||||||||||||
| 11 | 2026 | 0 | 2983039 | $ 57.89 | 2% | $ 59.05 | $ 176,144.93 | |||||||||||||||||||||||||
| 12 | 2026 | 2667023.75 | 470651.25 | $ 84.40 | 2% | $ 86.09 | $ 40,516.50 | |||||||||||||||||||||||||
| 1 | 2027 | 2735782.8 | 482785.2 | $ 138.37 | 2% | $ 141.14 | $ 68,139.63 | |||||||||||||||||||||||||
| 2 | 2027 | 2690477.8 | 474790.2 | $ 116.46 | 2% | $ 118.79 | $ 56,399.26 | |||||||||||||||||||||||||
| 3 | 2027 | 0 | 2984470 | $ 56.24 | 2% | $ 57.37 | $ 171,209.63 | |||||||||||||||||||||||||
| 4 | 2027 | 0 | 3082816 | $ 41.19 | 2% | $ 42.01 | $ 129,515.22 | |||||||||||||||||||||||||
| 5 | 2027 | 0 | 3403691 | $ 34.78 | 2% | $ 35.48 | $ 120,748.35 | |||||||||||||||||||||||||
| 6 | 2027 | 0 | 4357252 | $ 39.59 | 2% | $ 40.38 | $ 175,934.91 | |||||||||||||||||||||||||
| 7 | 2027 | 3918718.45 | 691538.55 | $ 58.27 | 2% | $ 59.43 | $ 41,101.42 | |||||||||||||||||||||||||
| 8 | 2027 | 3668356.9 | 647357.1 | $ 52.68 | 2% | $ 53.73 | $ 34,784.54 | |||||||||||||||||||||||||
| 9 | 2027 | 0 | 3559812 | $ 38.57 | 2% | $ 39.34 | $ 140,057.67 | |||||||||||||||||||||||||
| 10 | 2027 | 0 | 3290515 | $ 37.67 | 2% | $ 38.42 | $ 126,420.86 | |||||||||||||||||||||||||
| 11 | 2027 | 0 | 2983039 | $ 50.08 | 2% | $ 51.09 | $ 152,391.99 | |||||||||||||||||||||||||
| 12 | 2027 | 2667023.75 | 470651.25 | $ 75.51 | 2% | $ 77.02 | $ 36,250.01 | |||||||||||||||||||||||||
| 1 | 2028 | 2735782.8 | 482785.2 | $ 132.69 | 2% | $ 135.34 | $ 65,340.55 | |||||||||||||||||||||||||
| 2 | 2028 | 2690477.8 | 474790.2 | $ 126.77 | 2% | $ 129.31 | $ 61,392.77 | |||||||||||||||||||||||||
| 3 | 2028 | 0 | 2984470 | $ 43.49 | 2% | $ 44.36 | $ 132,378.49 | |||||||||||||||||||||||||
| 4 | 2028 | 0 | 3082816 | $ 36.71 | 2% | $ 37.44 | $ 115,419.60 | |||||||||||||||||||||||||
| 5 | 2028 | 0 | 3403691 | $ 34.63 | 2% | $ 35.32 | $ 120,228.71 | |||||||||||||||||||||||||
| 6 | 2028 | 0 | 4357252 | $ 38.33 | 2% | $ 39.10 | $ 170,363.61 | |||||||||||||||||||||||||
| 7 | 2028 | 3918718.45 | 691538.55 | $ 54.54 | 2% | $ 55.63 | $ 38,471.83 | |||||||||||||||||||||||||
| 8 | 2028 | 3668356.9 | 647357.1 | $ 51.45 | 2% | $ 52.48 | $ 33,971.23 | |||||||||||||||||||||||||
| 9 | 2028 | 0 | 3559812 | $ 36.44 | 2% | $ 37.16 | $ 132,297.80 | |||||||||||||||||||||||||
| 10 | 2028 | 0 | 3290515 | $ 35.98 | 2% | $ 36.70 | $ 120,757.34 | |||||||||||||||||||||||||
| 11 | 2028 | 0 | 2983039 | $ 47.03 | 2% | $ 47.97 | $ 143,090.19 | |||||||||||||||||||||||||
| 12 | 2028 | 2667023.75 | 470651.25 | $ 65.40 | 2% | $ 66.71 | $ 31,396.87 | |||||||||||||||||||||||||
| 1 | 2029 | 2735782.8 | 482785.2 | $ 126.03 | 2% | $ 128.55 | $ 62,061.96 | |||||||||||||||||||||||||
| 2 | 2029 | 2690477.8 | 474790.2 | $ 122.71 | 2% | $ 125.16 | $ 59,425.12 | |||||||||||||||||||||||||
| 3 | 2029 | 0 | 2984470 | $ 48.45 | 2% | $ 49.41 | $ 147,476.82 | |||||||||||||||||||||||||
| 4 | 2029 | 0 | 3082816 | $ 36.28 | 2% | $ 37.01 | $ 114,085.65 | |||||||||||||||||||||||||
| 5 | 2029 | 0 | 3403691 | $ 34.05 | 2% | $ 34.73 | $ 118,226.28 | |||||||||||||||||||||||||
| 6 | 2029 | 0 | 4357252 | $ 36.26 | 2% | $ 36.99 | $ 161,165.69 | |||||||||||||||||||||||||
| 7 | 2029 | 3918718.45 | 691538.55 | $ 51.99 | 2% | $ 53.03 | $ 36,671.24 | |||||||||||||||||||||||||
| 8 | 2029 | 3668356.9 | 647357.1 | $ 47.84 | 2% | $ 48.80 | $ 31,588.39 | |||||||||||||||||||||||||
| 9 | 2029 | 0 | 3559812 | $ 34.45 | 2% | $ 35.13 | $ 125,073.71 | |||||||||||||||||||||||||
| 10 | 2029 | 0 | 3290515 | $ 33.95 | 2% | $ 34.63 | $ 113,954.82 | |||||||||||||||||||||||||
| 11 | 2029 | 0 | 2983039 | $ 44.72 | 2% | $ 45.61 | $ 136,068.06 | |||||||||||||||||||||||||
| 12 | 2029 | 2667023.75 | 470651.25 | $ 63.68 | 2% | $ 64.96 | $ 30,571.68 | |||||||||||||||||||||||||
| 1 | 2030 | 2735782.8 | 482785.2 | $ 133.73 | 2% | $ 136.41 | $ 65,856.45 | |||||||||||||||||||||||||
| 2 | 2030 | 2690477.8 | 474790.2 | $ 126.50 | 2% | $ 129.03 | $ 61,262.18 | |||||||||||||||||||||||||
| 3 | 2030 | 0 | 2984470 | $ 49.34 | 2% | $ 50.33 | $ 150,208.66 | |||||||||||||||||||||||||
| 4 | 2030 | 0 | 3082816 | $ 35.29 | 2% | $ 35.99 | $ 110,954.45 | |||||||||||||||||||||||||
| 5 | 2030 | 0 | 3403691 | $ 32.58 | 2% | $ 33.23 | $ 113,097.78 | |||||||||||||||||||||||||
| 6 | 2030 | 0 | 4357252 | $ 34.56 | 2% | $ 35.25 | $ 153,608.24 | |||||||||||||||||||||||||
| 7 | 2030 | 3918718.45 | 691538.55 | $ 50.63 | 2% | $ 51.65 | $ 35,714.52 | |||||||||||||||||||||||||
| 8 | 2030 | 3668356.9 | 647357.1 | $ 45.68 | 2% | $ 46.59 | $ 30,160.07 | |||||||||||||||||||||||||
| Total Index | 6,218,984.65 | |||||||||||||||||||||||||||||||
| Total | 78,401,799 | 132,143,586 | $/kWh | $ 0.04706 | ||||||||||||||||||||||||||||
| 210,545,385 |
&C&"Arial"&8&K000000INTERNAL&1#
Group 2 - RFP 98876
| Block Product Model | PLATFORM INPUTS IN BOLD BOX | |||||||||||||||||||||||||||||||
| SUPPLIER INPUTS SHADED | PLEASE NOTE - the Spreadsheet will be updated for each Pricing Group with Group-specific information prior to the auction date. | |||||||||||||||||||||||||||||||
| LOW BID DISPLAYED | ||||||||||||||||||||||||||||||||
| Field Type | Field Label | Old Value | Sample Value | Units | Notes | |||||||||||||||||||||||||||
| Calc | Total Quantity (Term) | 38,782,307 | 84,150,689 | kWh | =Indexed Quantity at Meter + Fixed Quantity at Meter | |||||||||||||||||||||||||||
| Enel X Input | Fixed Quantity at Meter | 5,463,255 | 31,191,334 | kWh | The volume of load to be hedged in units at the Meter | |||||||||||||||||||||||||||
| Enel X Input | Indexed Quantity at Meter | 33,319,052 | 52,959,355 | kWh | The volume of load to float on a market index in units at the Meter | |||||||||||||||||||||||||||
| Enel X Input | Line Loss Adjustment | 7.50% | 0.000% | percent (e.g. 0.05=5%) | Line losses from the utility, relative to the metered load. Note: Must convert loss factor if the utility handles the calculation differently. | |||||||||||||||||||||||||||
| Enel X Input | Index Price Estimate | 0.0690 | 0.0457 | $/kWh | Estimate of average wholesale price of energy not including the fixed (hedged) load. (weighted average price for load following energy) | Sum of Historical Annual kWh Usage (for reference only) | Month | |||||||||||||||||||||||||
| Pricing Group | ISO/RTO | Capacity Tag Effective Date | Transmission | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Grand Total | ||||||||||||||||
| Calc | Indexed Quantity at Delivery Point | 36,020,596 | 52,959,355 | kWh | =Indexed Quantity at Meter * (1 + Line Loss Adjustment) | 2 | ISONE | 6/1/24 | N/A | 1,184,064 | 1,262,434 | 1,172,931 | 956,784 | 1,379,268 | 1,742,742 | 1,970,470 | 1,796,952 | 1,689,919 | 1,261,528 | 1,287,828 | 1,125,218 | 16,830,138 | ||||||||||
| Calc | Fixed Quantity at Delivery Point | 5,906,222 | 31,191,334 | kWh | =Fixed Quantity at Meter * (1 + Line Loss Adjustment) | Hedge % | 85% | 85% | - 0 | - 0 | - 0 | - 0 | 85% | 85% | - 0 | - 0 | - 0 | 85% | ||||||||||||||
| Calc | Total Usage at Delivery Point | 41,926,818 | 84,150,689 | kWh | =Indexed Quantity at Delivery Point + Fixed Quantity at Delivery Point | Hedge Vol | 1,006,454 | 1,073,069 | - 0 | - 0 | - 0 | - 0 | 1,674,900 | 1,527,409 | - 0 | - 0 | - 0 | 956,435 | 6,238,267 | 31,191,334 | ||||||||||||
| Supplier Input | Fixed Price Bid Amount ($/kWh) | 0.0751 | $/kWh | Supplier Bid input for the Shaped Hedge (See GSA Solicitation Section D.1, Calculation Input item # 6 | Index Vol | 177,610 | 189,365 | 1,172,931 | 956,784 | 1,379,268 | 1,742,742 | 295,571 | 269,543 | 1,689,919 | 1,261,528 | 1,287,828 | 168,783 | 10,591,871 | 52,959,355 | |||||||||||||
| Supplier Input | Supply Service Fee - Adder Bid Amount ($/kWh) | 0.0100 | $/kWh | Supplier Bid input for the Supply Service Fee Bid (See GSA Solicitation Section D.1, Calculation Input item #7 | ||||||||||||||||||||||||||||
| Calc | Bid Amount ($/kWh) | 0.08552 | 0.02879 | $/kWh | (Low Bid displayed) = ((Fixed Quantity at Meter * (1 + Line Loss Adjustment) * Fixed Price Bid Amount) + (Index Quantity at Meter * (1 + Line Loss Adjustment) * Index Wholesale Price Estimate) + (Total Quantity at Meter * (1 + Line Loss Adjustment) * Adder Bid Amount))/Total Quantity at Meter (Term) | |||||||||||||||||||||||||||
| Enel X Input | Shaped Hedge Description | e.g. "Percent Hedge: a 7x24 85% hedge | ||||||||||||||||||||||||||||||
| See "Explanation" tab for further details. | ||||||||||||||||||||||||||||||||
| ME | ||||||||||||||||||||||||||||||||
| Month | Year | Block | Index | Fwd Price | Buffer | Total Index | Index Cost | |||||||||||||||||||||||||
| 9 | 2025 | - 0 | 1,689,919 | $ 42.22 | 2% | $ 43.06 | $ 72,770.75 | |||||||||||||||||||||||||
| 10 | 2025 | - 0 | 1,261,528 | $ 41.48 | 2% | $ 42.31 | $ 53,376.84 | |||||||||||||||||||||||||
| 11 | 2025 | - 0 | 1,287,828 | $ 59.56 | 2% | $ 60.75 | $ 78,232.31 | |||||||||||||||||||||||||
| 12 | 2025 | 956,435 | 168,783 | $ 101.30 | 2% | $ 103.32 | $ 17,439.03 | |||||||||||||||||||||||||
| 1 | 2026 | 1,006,454 | 177,610 | $ 136.77 | 2% | $ 139.50 | $ 24,777.20 | |||||||||||||||||||||||||
| 2 | 2026 | 1,073,069 | 189,365 | $ 115.53 | 2% | $ 117.84 | $ 22,314.99 | |||||||||||||||||||||||||
| 3 | 2026 | - 0 | 1,172,931 | $ 64.93 | 2% | $ 66.23 | $ 77,682.50 | |||||||||||||||||||||||||
| 4 | 2026 | - 0 | 956,784 | $ 47.77 | 2% | $ 48.73 | $ 46,622.50 | |||||||||||||||||||||||||
| 5 | 2026 | - 0 | 1,379,268 | $ 41.70 | 2% | $ 42.54 | $ 58,672.57 | |||||||||||||||||||||||||
| 6 | 2026 | - 0 | 1,742,742 | $ 46.47 | 2% | $ 47.40 | $ 82,612.84 | |||||||||||||||||||||||||
| 7 | 2026 | 1,674,900 | 295,571 | $ 65.03 | 2% | $ 66.33 | $ 19,605.34 | |||||||||||||||||||||||||
| 8 | 2026 | 1,527,409 | 269,543 | $ 53.34 | 2% | $ 54.41 | $ 14,665.85 | |||||||||||||||||||||||||
| 9 | 2026 | - 0 | 1,689,919 | $ 43.82 | 2% | $ 44.69 | $ 75,528.70 | |||||||||||||||||||||||||
| 10 | 2026 | - 0 | 1,261,528 | $ 42.18 | 2% | $ 43.03 | $ 54,279.23 | |||||||||||||||||||||||||
| 11 | 2026 | - 0 | 1,287,828 | $ 58.05 | 2% | $ 59.21 | $ 76,249.60 | |||||||||||||||||||||||||
| 12 | 2026 | 956,435 | 168,783 | $ 84.67 | 2% | $ 86.36 | $ 14,576.00 | |||||||||||||||||||||||||
| 1 | 2027 | 1,006,454 | 177,610 | $ 133.34 | 2% | $ 136.00 | $ 24,155.31 | |||||||||||||||||||||||||
| 2 | 2027 | 1,073,069 | 189,365 | $ 111.73 | 2% | $ 113.96 | $ 21,580.37 | |||||||||||||||||||||||||
| 3 | 2027 | - 0 | 1,172,931 | $ 54.16 | 2% | $ 55.24 | $ 64,791.07 | |||||||||||||||||||||||||
| 4 | 2027 | - 0 | 956,784 | $ 39.35 | 2% | $ 40.14 | $ 38,404.61 | |||||||||||||||||||||||||
| 5 | 2027 | - 0 | 1,379,268 | $ 33.25 | 2% | $ 33.91 | $ 46,776.80 | |||||||||||||||||||||||||
| 6 | 2027 | - 0 | 1,742,742 | $ 37.89 | 2% | $ 38.65 | $ 67,354.73 | |||||||||||||||||||||||||
| 7 | 2027 | 1,674,900 | 295,571 | $ 56.92 | 2% | $ 58.06 | $ 17,161.33 | |||||||||||||||||||||||||
| 8 | 2027 | 1,527,409 | 269,543 | $ 51.41 | 2% | $ 52.44 | $ 14,133.72 | |||||||||||||||||||||||||
| 9 | 2027 | - 0 | 1,689,919 | $ 37.07 | 2% | $ 37.81 | $ 63,891.31 | |||||||||||||||||||||||||
| 10 | 2027 | - 0 | 1,261,528 | $ 36.23 | 2% | $ 36.95 | $ 46,619.69 | |||||||||||||||||||||||||
| 11 | 2027 | - 0 | 1,287,828 | $ 48.52 | 2% | $ 49.49 | $ 63,738.59 | |||||||||||||||||||||||||
| 12 | 2027 | 956,435 | 168,783 | $ 73.40 | 2% | $ 74.87 | $ 12,636.66 | |||||||||||||||||||||||||
| 1 | 2028 | 1,006,454 | 177,610 | $ 125.65 | 2% | $ 128.16 | $ 22,762.97 | |||||||||||||||||||||||||
| 2 | 2028 | 1,073,069 | 189,365 | $ 120.01 | 2% | $ 122.41 | $ 23,180.29 | |||||||||||||||||||||||||
| 3 | 2028 | - 0 | 1,172,931 | $ 40.71 | 2% | $ 41.53 | $ 48,707.25 | |||||||||||||||||||||||||
| 4 | 2028 | - 0 | 956,784 | $ 35.35 | 2% | $ 36.06 | $ 34,497.68 | |||||||||||||||||||||||||
| 5 | 2028 | - 0 | 1,379,268 | $ 33.67 | 2% | $ 34.34 | $ 47,367.07 | |||||||||||||||||||||||||
| 6 | 2028 | - 0 | 1,742,742 | $ 37.14 | 2% | $ 37.88 | $ 66,014.03 | |||||||||||||||||||||||||
| 7 | 2028 | 1,674,900 | 295,571 | $ 53.83 | 2% | $ 54.91 | $ 16,229.88 | |||||||||||||||||||||||||
| 8 | 2028 | 1,527,409 | 269,543 | $ 50.88 | 2% | $ 51.90 | $ 13,989.51 | |||||||||||||||||||||||||
| 9 | 2028 | - 0 | 1,689,919 | $ 35.39 | 2% | $ 36.10 | $ 61,002.36 | |||||||||||||||||||||||||
| 10 | 2028 | - 0 | 1,261,528 | $ 34.85 | 2% | $ 35.54 | $ 44,839.82 | |||||||||||||||||||||||||
| 11 | 2028 | - 0 | 1,287,828 | $ 45.64 | 2% | $ 46.55 | $ 59,953.04 | |||||||||||||||||||||||||
| 12 | 2028 | 956,435 | 168,783 | $ 63.07 | 2% | $ 64.33 | $ 10,857.43 | |||||||||||||||||||||||||
| 1 | 2029 | 1,006,454 | 177,610 | $ 121.05 | 2% | $ 123.47 | $ 21,930.17 | |||||||||||||||||||||||||
| 2 | 2029 | 1,073,069 | 189,365 | $ 115.74 | 2% | $ 118.06 | $ 22,355.64 | |||||||||||||||||||||||||
| 3 | 2029 | - 0 | 1,172,931 | $ 45.59 | 2% | $ 46.50 | $ 54,543.57 | |||||||||||||||||||||||||
| 4 | 2029 | - 0 | 956,784 | $ 34.84 | 2% | $ 35.54 | $ 34,002.34 | |||||||||||||||||||||||||
| 5 | 2029 | - 0 | 1,379,268 | $ 33.02 | 2% | $ 33.68 | $ 46,452.17 | |||||||||||||||||||||||||
| 6 | 2029 | - 0 | 1,742,742 | $ 34.97 | 2% | $ 35.67 | $ 62,163.75 | |||||||||||||||||||||||||
| 7 | 2029 | 1,674,900 | 295,571 | $ 51.24 | 2% | $ 52.26 | $ 15,447.25 | |||||||||||||||||||||||||
| 8 | 2029 | 1,527,409 | 269,543 | $ 47.16 | 2% | $ 48.10 | $ 12,965.04 | |||||||||||||||||||||||||
| 9 | 2029 | - 0 | 1,689,919 | $ 33.38 | 2% | $ 34.04 | $ 57,533.09 | |||||||||||||||||||||||||
| 10 | 2029 | - 0 | 1,261,528 | $ 32.74 | 2% | $ 33.40 | $ 42,128.77 | |||||||||||||||||||||||||
| 11 | 2029 | - 0 | 1,287,828 | $ 43.27 | 2% | $ 44.14 | $ 56,841.12 | |||||||||||||||||||||||||
| 12 | 2029 | 956,435 | 168,783 | $ 61.26 | 2% | $ 62.48 | $ 10,546.14 | |||||||||||||||||||||||||
| 1 | 2030 | 1,006,454 | 177,610 | $ 126.28 | 2% | $ 128.80 | $ 22,876.23 | |||||||||||||||||||||||||
| 2 | 2030 | 1,073,069 | 189,365 | $ 119.33 | 2% | $ 121.72 | $ 23,049.34 | |||||||||||||||||||||||||
| 3 | 2030 | - 0 | 1,172,931 | $ 46.41 | 2% | $ 47.33 | $ 55,519.75 | |||||||||||||||||||||||||
| 4 | 2030 | - 0 | 956,784 | $ 33.87 | 2% | $ 34.55 | $ 33,058.30 | |||||||||||||||||||||||||
| 5 | 2030 | - 0 | 1,379,268 | $ 31.59 | 2% | $ 32.22 | $ 44,446.57 | |||||||||||||||||||||||||
| 6 | 2030 | - 0 | 1,742,742 | $ 33.31 | 2% | $ 33.98 | $ 59,217.68 | |||||||||||||||||||||||||
| 7 | 2030 | 1,674,900 | 295,571 | $ 49.93 | 2% | $ 50.93 | $ 15,053.87 | |||||||||||||||||||||||||
| 8 | 2030 | 1,527,409 | 269,543 | $ 45.01 | 2% | $ 45.91 | $ 12,373.61 | |||||||||||||||||||||||||
| Total Index | 2,422,556.13 | |||||||||||||||||||||||||||||||
| Total | 31,191,334 | 52,959,355 | $/kWh | $ 0.04574 | ||||||||||||||||||||||||||||
| 84,150,689 |
&C&"Arial"&8&K000000INTERNAL&1#
Group 3 - RFP 98877
| Block Product Model | PLATFORM INPUTS IN BOLD BOX | |||||||||||||||||||||||||||||||
| SUPPLIER INPUTS SHADED | PLEASE NOTE - the Spreadsheet will be updated for each Pricing Group with Group-specific information prior to the auction date. | |||||||||||||||||||||||||||||||
| LOW BID DISPLAYED | ||||||||||||||||||||||||||||||||
| Field Type | Field Label | Old Value | Sample Value | Units | Notes | |||||||||||||||||||||||||||
| Calc | Total Quantity (Term) | 38,782,307 | 883,292,115 | kWh | =Indexed Quantity at Meter + Fixed Quantity at Meter | |||||||||||||||||||||||||||
| Enel X Input | Fixed Quantity at Meter | 5,463,255 | 326,072,908 | kWh | The volume of load to be hedged in units at the Meter | |||||||||||||||||||||||||||
| Enel X Input | Indexed Quantity at Meter | 33,319,052 | 557,219,207 | kWh | The volume of load to float on a market index in units at the Meter | |||||||||||||||||||||||||||
| Enel X Input | Line Loss Adjustment | 7.50% | 0.000% | percent (e.g. 0.05=5%) | Line losses from the utility, relative to the metered load. Note: Must convert loss factor if the utility handles the calculation differently. | |||||||||||||||||||||||||||
| Enel X Input | Index Price Estimate | 0.0690 | 0.0481 | $/kWh | Estimate of average wholesale price of energy not including the fixed (hedged) load. (weighted average price for load following energy) | Sum of Historical Annual kWh Usage (for reference only) | Month | |||||||||||||||||||||||||
| Pricing Group | ISO/RTO | Capacity Tag Effective Date | Transmission | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Grand Total | ||||||||||||||||
| Calc | Indexed Quantity at Delivery Point | 36,020,596 | 557,219,207 | kWh | =Indexed Quantity at Meter * (1 + Line Loss Adjustment) | 3 | ISONE | 6/1/24 | N/A | 13,492,906 | 12,624,580 | 12,835,092 | 14,115,599 | 13,804,865 | 17,471,326 | 20,296,757 | 16,994,344 | 14,164,459 | 14,096,121 | 13,447,923 | 13,314,449 | 176,658,423 | ||||||||||
| Calc | Fixed Quantity at Delivery Point | 5,906,222 | 326,072,908 | kWh | =Fixed Quantity at Meter * (1 + Line Loss Adjustment) | Hedge % | 85% | 85% | - 0 | - 0 | - 0 | - 0 | 85% | 85% | - 0 | - 0 | - 0 | 85% | ||||||||||||||
| Calc | Total Usage at Delivery Point | 41,926,818 | 883,292,115 | kWh | =Indexed Quantity at Delivery Point + Fixed Quantity at Delivery Point | Hedge Vol | 11,468,970 | 10,730,893 | - 0 | - 0 | - 0 | - 0 | 17,252,244 | 14,445,193 | - 0 | - 0 | - 0 | 11,317,282 | 65,214,582 | 326,072,908 | ||||||||||||
| Supplier Input | Fixed Price Bid Amount ($/kWh) | 0.0751 | $/kWh | Supplier Bid input for the Shaped Hedge (See GSA Solicitation Section D.1, Calculation Input item # 6 | Index Vol | 2,023,936 | 1,893,687 | 12,835,092 | 14,115,599 | 13,804,865 | 17,471,326 | 3,044,514 | 2,549,152 | 14,164,459 | 14,096,121 | 13,447,923 | 1,997,167 | 111,443,841 | 557,219,207 | |||||||||||||
| Supplier Input | Supply Service Fee - Adder Bid Amount ($/kWh) | 0.0100 | $/kWh | Supplier Bid input for the Supply Service Fee Bid (See GSA Solicitation Section D.1, Calculation Input item #7 | ||||||||||||||||||||||||||||
| Calc | Bid Amount ($/kWh) | 0.08552 | 0.03033 | $/kWh | (Low Bid displayed) = ((Fixed Quantity at Meter * (1 + Line Loss Adjustment) * Fixed Price Bid Amount) + (Index Quantity at Meter * (1 + Line Loss Adjustment) * Index Wholesale Price Estimate) + (Total Quantity at Meter * (1 + Line Loss Adjustment) * Adder Bid Amount))/Total Quantity at Meter (Term) | |||||||||||||||||||||||||||
| Enel X Input | Shaped Hedge Description | e.g. "Percent Hedge: a 7x24 85% hedge | ||||||||||||||||||||||||||||||
| See "Explanation" tab for further details. | ||||||||||||||||||||||||||||||||
| MA | ||||||||||||||||||||||||||||||||
| Month | Year | Block | Index | Fwd Price | Buffer | Total Index | Index Cost | |||||||||||||||||||||||||
| 9 | 2025 | - 0 | 14,164,459 | $ 41.88 | 2% | $ 42.72 | $ 605,119.87 | |||||||||||||||||||||||||
| 10 | 2025 | - 0 | 14,096,121 | $ 41.50 | 2% | $ 42.33 | $ 596,691.89 | |||||||||||||||||||||||||
| 11 | 2025 | - 0 | 13,447,923 | $ 59.52 | 2% | $ 60.71 | $ 816,417.96 | |||||||||||||||||||||||||
| 12 | 2025 | 11,317,282 | 1,997,167 | $ 101.28 | 2% | $ 103.30 | $ 206,315.07 | |||||||||||||||||||||||||
| 1 | 2026 | 11,468,970 | 2,023,936 | $ 137.22 | 2% | $ 139.97 | $ 283,288.30 | |||||||||||||||||||||||||
| 2 | 2026 | 10,730,893 | 1,893,687 | $ 115.06 | 2% | $ 117.36 | $ 222,250.90 | |||||||||||||||||||||||||
| 3 | 2026 | - 0 | 12,835,092 | $ 66.74 | 2% | $ 68.07 | $ 873,698.54 | |||||||||||||||||||||||||
| 4 | 2026 | - 0 | 14,115,599 | $ 48.65 | 2% | $ 49.62 | $ 700,404.00 | |||||||||||||||||||||||||
| 5 | 2026 | - 0 | 13,804,865 | $ 42.69 | 2% | $ 43.54 | $ 601,116.30 | |||||||||||||||||||||||||
| 6 | 2026 | - 0 | 17,471,326 | $ 47.71 | 2% | $ 48.66 | $ 850,196.42 | |||||||||||||||||||||||||
| 7 | 2026 | 17,252,244 | 3,044,514 | $ 66.43 | 2% | $ 67.76 | $ 206,305.34 | |||||||||||||||||||||||||
| 8 | 2026 | 14,445,193 | 2,549,152 | $ 54.07 | 2% | $ 55.15 | $ 140,590.96 | |||||||||||||||||||||||||
| 9 | 2026 | - 0 | 14,164,459 | $ 44.54 | 2% | $ 45.43 | $ 643,464.19 | |||||||||||||||||||||||||
| 10 | 2026 | - 0 | 14,096,121 | $ 43.15 | 2% | $ 44.01 | $ 620,360.00 | |||||||||||||||||||||||||
| 11 | 2026 | - 0 | 13,447,923 | $ 59.35 | 2% | $ 60.53 | $ 814,062.69 | |||||||||||||||||||||||||
| 12 | 2026 | 11,317,282 | 1,997,167 | $ 85.77 | 2% | $ 87.48 | $ 174,714.66 | |||||||||||||||||||||||||
| 1 | 2027 | 11,468,970 | 2,023,936 | $ 126.31 | 2% | $ 128.83 | $ 260,751.77 | |||||||||||||||||||||||||
| 2 | 2027 | 10,730,893 | 1,893,687 | $ 103.17 | 2% | $ 105.24 | $ 199,284.64 | |||||||||||||||||||||||||
| 3 | 2027 | - 0 | 12,835,092 | $ 59.38 | 2% | $ 60.57 | $ 777,379.94 | |||||||||||||||||||||||||
| 4 | 2027 | - 0 | 14,115,599 | $ 43.71 | 2% | $ 44.58 | $ 629,323.11 | |||||||||||||||||||||||||
| 5 | 2027 | - 0 | 13,804,865 | $ 37.04 | 2% | $ 37.78 | $ 521,528.57 | |||||||||||||||||||||||||
| 6 | 2027 | - 0 | 17,471,326 | $ 41.51 | 2% | $ 42.34 | $ 739,771.12 | |||||||||||||||||||||||||
| 7 | 2027 | 17,252,244 | 3,044,514 | $ 60.74 | 2% | $ 61.96 | $ 188,633.25 | |||||||||||||||||||||||||
| 8 | 2027 | 14,445,193 | 2,549,152 | $ 54.18 | 2% | $ 55.26 | $ 140,868.59 | |||||||||||||||||||||||||
| 9 | 2027 | - 0 | 14,164,459 | $ 40.55 | 2% | $ 41.36 | $ 585,894.73 | |||||||||||||||||||||||||
| 10 | 2027 | - 0 | 14,096,121 | $ 40.32 | 2% | $ 41.13 | $ 579,787.64 | |||||||||||||||||||||||||
| 11 | 2027 | - 0 | 13,447,923 | $ 52.70 | 2% | $ 53.75 | $ 722,886.33 | |||||||||||||||||||||||||
| 12 | 2027 | 11,317,282 | 1,997,167 | $ 77.90 | 2% | $ 79.46 | $ 158,687.86 | |||||||||||||||||||||||||
| 1 | 2028 | 11,468,970 | 2,023,936 | $ 114.40 | 2% | $ 116.69 | $ 236,179.02 | |||||||||||||||||||||||||
| 2 | 2028 | 10,730,893 | 1,893,687 | $ 107.26 | 2% | $ 109.40 | $ 207,169.88 | |||||||||||||||||||||||||
| 3 | 2028 | - 0 | 12,835,092 | $ 45.52 | 2% | $ 46.43 | $ 595,988.83 | |||||||||||||||||||||||||
| 4 | 2028 | - 0 | 14,115,599 | $ 38.02 | 2% | $ 38.78 | $ 547,344.60 | |||||||||||||||||||||||||
| 5 | 2028 | - 0 | 13,804,865 | $ 35.82 | 2% | $ 36.53 | $ 504,310.43 | |||||||||||||||||||||||||
| 6 | 2028 | - 0 | 17,471,326 | $ 38.83 | 2% | $ 39.61 | $ 692,039.22 | |||||||||||||||||||||||||
| 7 | 2028 | 17,252,244 | 3,044,514 | $ 53.78 | 2% | $ 54.85 | $ 166,995.93 | |||||||||||||||||||||||||
| 8 | 2028 | 14,445,193 | 2,549,152 | $ 49.99 | 2% | $ 50.99 | $ 129,981.29 | |||||||||||||||||||||||||
| 9 | 2028 | - 0 | 14,164,459 | $ 36.97 | 2% | $ 37.71 | $ 534,181.42 | |||||||||||||||||||||||||
| 10 | 2028 | - 0 | 14,096,121 | $ 36.99 | 2% | $ 37.72 | $ 531,774.25 | |||||||||||||||||||||||||
| 11 | 2028 | - 0 | 13,447,923 | $ 47.65 | 2% | $ 48.60 | $ 653,586.78 | |||||||||||||||||||||||||
| 12 | 2028 | 11,317,282 | 1,997,167 | $ 69.31 | 2% | $ 70.69 | $ 141,183.82 | |||||||||||||||||||||||||
| 1 | 2029 | 11,468,970 | 2,023,936 | $ 111.57 | 2% | $ 113.80 | $ 230,327.85 | |||||||||||||||||||||||||
| 2 | 2029 | 10,730,893 | 1,893,687 | $ 104.52 | 2% | $ 106.61 | $ 201,895.01 | |||||||||||||||||||||||||
| 3 | 2029 | - 0 | 12,835,092 | $ 53.02 | 2% | $ 54.08 | $ 694,073.32 | |||||||||||||||||||||||||
| 4 | 2029 | - 0 | 14,115,599 | $ 37.81 | 2% | $ 38.57 | $ 544,452.22 | |||||||||||||||||||||||||
| 5 | 2029 | - 0 | 13,804,865 | $ 35.41 | 2% | $ 36.12 | $ 498,612.94 | |||||||||||||||||||||||||
| 6 | 2029 | - 0 | 17,471,326 | $ 37.28 | 2% | $ 38.02 | $ 664,286.37 | |||||||||||||||||||||||||
| 7 | 2029 | 17,252,244 | 3,044,514 | $ 50.31 | 2% | $ 51.32 | $ 156,236.88 | |||||||||||||||||||||||||
| 8 | 2029 | 14,445,193 | 2,549,152 | $ 45.55 | 2% | $ 46.46 | $ 118,427.75 | |||||||||||||||||||||||||
| 9 | 2029 | - 0 | 14,164,459 | $ 35.39 | 2% | $ 36.10 | $ 511,312.24 | |||||||||||||||||||||||||
| 10 | 2029 | - 0 | 14,096,121 | $ 35.81 | 2% | $ 36.53 | $ 514,934.93 | |||||||||||||||||||||||||
| 11 | 2029 | - 0 | 13,447,923 | $ 46.11 | 2% | $ 47.03 | $ 632,464.11 | |||||||||||||||||||||||||
| 12 | 2029 | 11,317,282 | 1,997,167 | $ 71.16 | 2% | $ 72.59 | $ 144,969.34 | |||||||||||||||||||||||||
| 1 | 2030 | 11,468,970 | 2,023,936 | $ 112.59 | 2% | $ 114.84 | $ 232,423.57 | |||||||||||||||||||||||||
| 2 | 2030 | 10,730,893 | 1,893,687 | $ 105.13 | 2% | $ 107.23 | $ 203,067.74 | |||||||||||||||||||||||||
| 3 | 2030 | - 0 | 12,835,092 | $ 52.37 | 2% | $ 53.42 | $ 685,634.49 | |||||||||||||||||||||||||
| 4 | 2030 | - 0 | 14,115,599 | $ 37.58 | 2% | $ 38.33 | $ 541,108.70 | |||||||||||||||||||||||||
| 5 | 2030 | - 0 | 13,804,865 | $ 35.02 | 2% | $ 35.72 | $ 493,145.59 | |||||||||||||||||||||||||
| 6 | 2030 | - 0 | 17,471,326 | $ 36.44 | 2% | $ 37.17 | $ 649,328.82 | |||||||||||||||||||||||||
| 7 | 2030 | 17,252,244 | 3,044,514 | $ 49.31 | 2% | $ 50.30 | $ 153,133.81 | |||||||||||||||||||||||||
| 8 | 2030 | 14,445,193 | 2,549,152 | $ 45.23 | 2% | $ 46.14 | $ 117,608.56 | |||||||||||||||||||||||||
| Total Index | 26,787,974.38 | |||||||||||||||||||||||||||||||
| Total | 326,072,908 | 557,219,207 | $/kWh | $ 0.04807 |
&C&"Arial"&8&K000000INTERNAL&1#
Group 4 - RFP 98878
| Block Product Model | PLATFORM INPUTS IN BOLD BOX | |||||||||||||||||||||||||||||||
| SUPPLIER INPUTS SHADED | PLEASE NOTE - the Spreadsheet will be updated for each Pricing Group with Group-specific information prior to the auction date. | |||||||||||||||||||||||||||||||
| LOW BID DISPLAYED | ||||||||||||||||||||||||||||||||
| Field Type | Field Label | Old Value | Sample Value | Units | Notes | |||||||||||||||||||||||||||
| Calc | Total Quantity (Term) | 38,782,307 | 105,823,780 | kWh | =Indexed Quantity at Meter + Fixed Quantity at Meter | |||||||||||||||||||||||||||
| Enel X Input | Fixed Quantity at Meter | 5,463,255 | 37,870,403 | kWh | The volume of load to be hedged in units at the Meter | |||||||||||||||||||||||||||
| Enel X Input | Indexed Quantity at Meter | 33,319,052 | 67,953,377 | kWh | The volume of load to float on a market index in units at the Meter | |||||||||||||||||||||||||||
| Enel X Input | Line Loss Adjustment | 7.50% | 0.000% | percent (e.g. 0.05=5%) | Line losses from the utility, relative to the metered load. Note: Must convert loss factor if the utility handles the calculation differently. | |||||||||||||||||||||||||||
| Enel X Input | Index Price Estimate | 0.0690 | 0.0433 | $/kWh | Estimate of average wholesale price of energy not including the fixed (hedged) load. (weighted average price for load following energy) | Sum of Historical Annual kWh Usage (for reference only) | Month | |||||||||||||||||||||||||
| Pricing Group | ISO/RTO | Capacity Tag Effective Date | Transmission | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Grand Total | ||||||||||||||||
| Calc | Indexed Quantity at Delivery Point | 36,020,596 | 67,953,377 | kWh | =Indexed Quantity at Meter * (1 + Line Loss Adjustment) | 4 | ISONE | 6/1/24 | N/A | 1,734,331 | 1,495,282 | 1,875,753 | 1,652,711 | 1,613,397 | 2,070,663 | 1,879,230 | 2,094,820 | 1,849,921 | 1,599,797 | 1,591,831 | 1,707,020 | 21,164,756 | ||||||||||
| Calc | Fixed Quantity at Delivery Point | 5,906,222 | 37,870,403 | kWh | =Fixed Quantity at Meter * (1 + Line Loss Adjustment) | Hedge % | 85% | 85% | - 0 | - 0 | - 0 | - 0 | 85% | 85% | - 0 | - 0 | - 0 | 85% | ||||||||||||||
| Calc | Total Usage at Delivery Point | 41,926,818 | 105,823,780 | kWh | =Indexed Quantity at Delivery Point + Fixed Quantity at Delivery Point | Hedge Vol | 1,474,181 | 1,270,990 | - 0 | - 0 | - 0 | - 0 | 1,597,346 | 1,780,597 | - 0 | - 0 | - 0 | 1,450,967 | 7,574,081 | 37,870,403 | ||||||||||||
| Supplier Input | Fixed Price Bid Amount ($/kWh) | 0.0751 | $/kWh | Supplier Bid input for the Shaped Hedge (See GSA Solicitation Section D.1, Calculation Input item # 6 | Index Vol | 260,150 | 224,292 | 1,875,753 | 1,652,711 | 1,613,397 | 2,070,663 | 281,885 | 314,223 | 1,849,921 | 1,599,797 | 1,591,831 | 256,053 | 13,590,675 | 67,953,377 | |||||||||||||
| Supplier Input | Supply Service Fee - Adder Bid Amount ($/kWh) | 0.0100 | $/kWh | Supplier Bid input for the Supply Service Fee Bid (See GSA Solicitation Section D.1, Calculation Input item #7 | ||||||||||||||||||||||||||||
| Calc | Bid Amount ($/kWh) | 0.08552 | 0.02778 | $/kWh | (Low Bid displayed) = ((Fixed Quantity at Meter * (1 + Line Loss Adjustment) * Fixed Price Bid Amount) + (Index Quantity at Meter * (1 + Line Loss Adjustment) * Index Wholesale Price Estimate) + (Total Quantity at Meter * (1 + Line Loss Adjustment) * Adder Bid Amount))/Total Quantity at Meter (Term) | 4+J12:N1 | ||||||||||||||||||||||||||
| Enel X Input | Shaped Hedge Description | e.g. "Percent Hedge: a 7x24 85% hedge | 257149.65 | 221472.3 | 1856553 | 1635111 | 1590597 | 2049463 | 277864.5 | 310503 | 1829121 | 1583397 | 1575831 | 253473 | ||||||||||||||||||
| See "Explanation" tab for further details. | ||||||||||||||||||||||||||||||||
| NH | ||||||||||||||||||||||||||||||||
| Month | Year | Block | Index | Fwd Price | Buffer | Total Index | Index Cost | |||||||||||||||||||||||||
| 9 | 2025 | - 0 | 1,849,921 | $ 42.06 | 2% | $ 42.91 | $ 79,371.38 | |||||||||||||||||||||||||
| 10 | 2025 | - 0 | 1,599,797 | $ 41.77 | 2% | $ 42.60 | $ 68,154.90 | |||||||||||||||||||||||||
| 11 | 2025 | - 0 | 1,591,831 | $ 59.22 | 2% | $ 60.41 | $ 96,155.76 | |||||||||||||||||||||||||
| 12 | 2025 | 1,450,967 | 256,053 | $ 100.98 | 2% | $ 103.00 | $ 26,373.50 | |||||||||||||||||||||||||
| 1 | 2026 | 1,474,181 | 260,150 | $ 135.33 | 2% | $ 138.04 | $ 35,910.26 | |||||||||||||||||||||||||
| 2 | 2026 | 1,270,990 | 224,292 | $ 113.96 | 2% | $ 116.23 | $ 26,070.58 | |||||||||||||||||||||||||
| 3 | 2026 | - 0 | 1,875,753 | $ 63.81 | 2% | $ 65.09 | $ 122,089.32 | |||||||||||||||||||||||||
| 4 | 2026 | - 0 | 1,652,711 | $ 46.94 | 2% | $ 47.88 | $ 79,135.81 | |||||||||||||||||||||||||
| 5 | 2026 | - 0 | 1,613,397 | $ 41.25 | 2% | $ 42.07 | $ 67,875.72 | |||||||||||||||||||||||||
| 6 | 2026 | - 0 | 2,070,663 | $ 46.27 | 2% | $ 47.20 | $ 97,729.05 | |||||||||||||||||||||||||
| 7 | 2026 | 1,597,346 | 281,885 | $ 64.93 | 2% | $ 66.23 | $ 18,668.54 | |||||||||||||||||||||||||
| 8 | 2026 | 1,780,597 | 314,223 | $ 52.82 | 2% | $ 53.88 | $ 16,928.79 | |||||||||||||||||||||||||
| 9 | 2026 | - 0 | 1,849,921 | $ 43.27 | 2% | $ 44.14 | $ 81,650.78 | |||||||||||||||||||||||||
| 10 | 2026 | - 0 | 1,599,797 | $ 41.69 | 2% | $ 42.52 | $ 68,024.71 | |||||||||||||||||||||||||
| 11 | 2026 | - 0 | 1,591,831 | $ 56.93 | 2% | $ 58.07 | $ 92,441.41 | |||||||||||||||||||||||||
| 12 | 2026 | 1,450,967 | 256,053 | $ 83.30 | 2% | $ 84.97 | $ 21,756.39 | |||||||||||||||||||||||||
| 1 | 2027 | 1,474,181 | 260,150 | $ 126.62 | 2% | $ 129.15 | $ 33,597.92 | |||||||||||||||||||||||||
| 2 | 2027 | 1,270,990 | 224,292 | $ 105.18 | 2% | $ 107.29 | $ 24,063.76 | |||||||||||||||||||||||||
| 3 | 2027 | - 0 | 1,875,753 | $ 50.50 | 2% | $ 51.50 | $ 96,610.61 | |||||||||||||||||||||||||
| 4 | 2027 | - 0 | 1,652,711 | $ 36.68 | 2% | $ 37.41 | $ 61,833.49 | |||||||||||||||||||||||||
| 5 | 2027 | - 0 | 1,613,397 | $ 31.26 | 2% | $ 31.88 | $ 51,441.36 | |||||||||||||||||||||||||
| 6 | 2027 | - 0 | 2,070,663 | $ 35.85 | 2% | $ 36.57 | $ 75,717.00 | |||||||||||||||||||||||||
| 7 | 2027 | 1,597,346 | 281,885 | $ 54.21 | 2% | $ 55.29 | $ 15,586.39 | |||||||||||||||||||||||||
| 8 | 2027 | 1,780,597 | 314,223 | $ 48.62 | 2% | $ 49.59 | $ 15,581.83 | |||||||||||||||||||||||||
| 9 | 2027 | - 0 | 1,849,921 | $ 34.70 | 2% | $ 35.39 | $ 65,467.30 | |||||||||||||||||||||||||
| 10 | 2027 | - 0 | 1,599,797 | $ 33.95 | 2% | $ 34.63 | $ 55,401.48 | |||||||||||||||||||||||||
| 11 | 2027 | - 0 | 1,591,831 | $ 45.09 | 2% | $ 45.99 | $ 73,215.11 | |||||||||||||||||||||||||
| 12 | 2027 | 1,450,967 | 256,053 | $ 68.72 | 2% | $ 70.09 | $ 17,947.04 | |||||||||||||||||||||||||
| 1 | 2028 | 1,474,181 | 260,150 | $ 119.40 | 2% | $ 121.79 | $ 31,682.42 | |||||||||||||||||||||||||
| 2 | 2028 | 1,270,990 | 224,292 | $ 113.90 | 2% | $ 116.18 | $ 26,058.94 | |||||||||||||||||||||||||
| 3 | 2028 | - 0 | 1,875,753 | $ 36.17 | 2% | $ 36.89 | $ 69,193.56 | |||||||||||||||||||||||||
| 4 | 2028 | - 0 | 1,652,711 | $ 31.33 | 2% | $ 31.96 | $ 52,813.15 | |||||||||||||||||||||||||
| 5 | 2028 | - 0 | 1,613,397 | $ 30.45 | 2% | $ 31.06 | $ 50,118.28 | |||||||||||||||||||||||||
| 6 | 2028 | - 0 | 2,070,663 | $ 33.77 | 2% | $ 34.45 | $ 71,325.28 | |||||||||||||||||||||||||
| 7 | 2028 | 1,597,346 | 281,885 | $ 49.50 | 2% | $ 50.49 | $ 14,232.16 | |||||||||||||||||||||||||
| 8 | 2028 | 1,780,597 | 314,223 | $ 46.33 | 2% | $ 47.26 | $ 14,849.08 | |||||||||||||||||||||||||
| 9 | 2028 | - 0 | 1,849,921 | $ 31.69 | 2% | $ 32.32 | $ 59,798.57 | |||||||||||||||||||||||||
| 10 | 2028 | - 0 | 1,599,797 | $ 31.30 | 2% | $ 31.93 | $ 51,077.40 | |||||||||||||||||||||||||
| 11 | 2028 | - 0 | 1,591,831 | $ 40.81 | 2% | $ 41.63 | $ 66,268.81 | |||||||||||||||||||||||||
| 12 | 2028 | 1,450,967 | 256,053 | $ 56.01 | 2% | $ 57.13 | $ 14,628.95 | |||||||||||||||||||||||||
| 1 | 2029 | 1,474,181 | 260,150 | $ 114.86 | 2% | $ 117.15 | $ 30,477.18 | |||||||||||||||||||||||||
| 2 | 2029 | 1,270,990 | 224,292 | $ 109.80 | 2% | $ 112.00 | $ 25,119.62 | |||||||||||||||||||||||||
| 3 | 2029 | - 0 | 1,875,753 | $ 40.97 | 2% | $ 41.79 | $ 78,395.79 | |||||||||||||||||||||||||
| 4 | 2029 | - 0 | 1,652,711 | $ 30.73 | 2% | $ 31.35 | $ 51,810.31 | |||||||||||||||||||||||||
| 5 | 2029 | - 0 | 1,613,397 | $ 29.76 | 2% | $ 30.36 | $ 48,979.24 | |||||||||||||||||||||||||
| 6 | 2029 | - 0 | 2,070,663 | $ 31.60 | 2% | $ 32.23 | $ 66,734.57 | |||||||||||||||||||||||||
| 7 | 2029 | 1,597,346 | 281,885 | $ 46.78 | 2% | $ 47.71 | $ 13,449.36 | |||||||||||||||||||||||||
| 8 | 2029 | 1,780,597 | 314,223 | $ 42.59 | 2% | $ 43.44 | $ 13,650.55 | |||||||||||||||||||||||||
| 9 | 2029 | - 0 | 1,849,921 | $ 29.60 | 2% | $ 30.20 | $ 55,861.62 | |||||||||||||||||||||||||
| 10 | 2029 | - 0 | 1,599,797 | $ 29.11 | 2% | $ 29.69 | $ 47,499.74 | |||||||||||||||||||||||||
| 11 | 2029 | - 0 | 1,591,831 | $ 38.40 | 2% | $ 39.17 | $ 62,349.31 | |||||||||||||||||||||||||
| 12 | 2029 | 1,450,967 | 256,053 | $ 54.13 | 2% | $ 55.22 | $ 14,137.97 | |||||||||||||||||||||||||
| 1 | 2030 | 1,474,181 | 260,150 | $ 119.79 | 2% | $ 122.19 | $ 31,787.51 | |||||||||||||||||||||||||
| 2 | 2030 | 1,270,990 | 224,292 | $ 113.18 | 2% | $ 115.45 | $ 25,893.44 | |||||||||||||||||||||||||
| 3 | 2030 | - 0 | 1,875,753 | $ 41.71 | 2% | $ 42.54 | $ 79,798.96 | |||||||||||||||||||||||||
| 4 | 2030 | - 0 | 1,652,711 | $ 29.88 | 2% | $ 30.48 | $ 50,375.16 | |||||||||||||||||||||||||
| 5 | 2030 | - 0 | 1,613,397 | $ 28.47 | 2% | $ 29.04 | $ 46,848.01 | |||||||||||||||||||||||||
| 6 | 2030 | - 0 | 2,070,663 | $ 30.11 | 2% | $ 30.72 | $ 63,601.66 | |||||||||||||||||||||||||
| 7 | 2030 | 1,597,346 | 281,885 | $ 45.60 | 2% | $ 46.51 | $ 13,111.60 | |||||||||||||||||||||||||
| 8 | 2030 | 1,780,597 | 314,223 | $ 40.64 | 2% | $ 41.45 | $ 13,023.87 | |||||||||||||||||||||||||
| Total Index | 2,939,752.24 | |||||||||||||||||||||||||||||||
| Total | 37,870,403 | 67,953,377 | $/kWh | $ 0.04326 | ||||||||||||||||||||||||||||
| 105,823,780 |
&C&"Arial"&8&K000000INTERNAL&1#
Group 5 - RFP 98879
| Block Product Model | PLATFORM INPUTS IN BOLD BOX | |||||||||||||||||||||||||||||||
| SUPPLIER INPUTS SHADED | PLEASE NOTE - the Spreadsheet will be updated for each Pricing Group with Group-specific information prior to the auction date. | |||||||||||||||||||||||||||||||
| LOW BID DISPLAYED | ||||||||||||||||||||||||||||||||
| Field Type | Field Label | Old Value | Sample Value | Units | Notes | |||||||||||||||||||||||||||
| Calc | Total Quantity (Term) | 38,782,307 | 96,293,480 | kWh | =Indexed Quantity at Meter + Fixed Quantity at Meter | |||||||||||||||||||||||||||
| Enel X Input | Fixed Quantity at Meter | 5,463,255 | 38,027,993 | kWh | The volume of load to be hedged in units at the Meter | |||||||||||||||||||||||||||
| Enel X Input | Indexed Quantity at Meter | 33,319,052 | 58,265,487 | kWh | The volume of load to float on a market index in units at the Meter | |||||||||||||||||||||||||||
| Enel X Input | Line Loss Adjustment | 7.50% | 0.000% | percent (e.g. 0.05=5%) | Line losses from the utility, relative to the metered load. Note: Must convert loss factor if the utility handles the calculation differently. | |||||||||||||||||||||||||||
| Enel X Input | Index Price Estimate | 0.0690 | 0.0423 | $/kWh | Estimate of average wholesale price of energy not including the fixed (hedged) load. (weighted average price for load following energy) | Sum of Historical Annual kWh Usage (for reference only) | Month | |||||||||||||||||||||||||
| Pricing Group | ISO/RTO | Capacity Tag Effective Date | Transmission | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Grand Total | ||||||||||||||||
| Calc | Indexed Quantity at Delivery Point | 36,020,596 | 58,265,487 | kWh | =Indexed Quantity at Meter * (1 + Line Loss Adjustment) | 5 | ISONE | 6/1/24 | N/A | 1,438,520 | 1,298,000 | 1,360,600 | 1,320,920 | 1,402,360 | 1,691,320 | 2,048,880 | 1,748,080 | 1,718,960 | 1,459,080 | 1,357,693 | 2,414,283 | 19,258,696 | ||||||||||
| Calc | Fixed Quantity at Delivery Point | 5,906,222 | 38,027,993 | kWh | =Fixed Quantity at Meter * (1 + Line Loss Adjustment) | Hedge % | 85% | 85% | - 0 | - 0 | - 0 | - 0 | 85% | 85% | - 0 | - 0 | - 0 | 85% | ||||||||||||||
| Calc | Total Usage at Delivery Point | 41,926,818 | 96,293,480 | kWh | =Indexed Quantity at Delivery Point + Fixed Quantity at Delivery Point | Hedge Vol | 1,222,742 | 1,103,300 | - 0 | - 0 | - 0 | - 0 | 1,741,548 | 1,485,868 | - 0 | - 0 | - 0 | 2,052,141 | 7,605,599 | 38,027,993 | ||||||||||||
| Supplier Input | Fixed Price Bid Amount ($/kWh) | 0.0751 | $/kWh | Supplier Bid input for the Shaped Hedge (See GSA Solicitation Section D.1, Calculation Input item # 6 | Index Vol | 215,778 | 194,700 | 1,360,600 | 1,320,920 | 1,402,360 | 1,691,320 | 307,332 | 262,212 | 1,718,960 | 1,459,080 | 1,357,693 | 362,142 | 11,653,097 | 58,265,487 | |||||||||||||
| Supplier Input | Supply Service Fee - Adder Bid Amount ($/kWh) | 0.0100 | $/kWh | Supplier Bid input for the Supply Service Fee Bid (See GSA Solicitation Section D.1, Calculation Input item #7 | ||||||||||||||||||||||||||||
| Calc | Bid Amount ($/kWh) | 0.08552 | 0.02560 | $/kWh | (Low Bid displayed) = ((Fixed Quantity at Meter * (1 + Line Loss Adjustment) * Fixed Price Bid Amount) + (Index Quantity at Meter * (1 + Line Loss Adjustment) * Index Wholesale Price Estimate) + (Total Quantity at Meter * (1 + Line Loss Adjustment) * Adder Bid Amount))/Total Quantity at Meter (Term) | |||||||||||||||||||||||||||
| Enel X Input | Shaped Hedge Description | e.g. "Percent Hedge: a 7x24 85% hedge | ||||||||||||||||||||||||||||||
| See "Explanation" tab for further details. | ||||||||||||||||||||||||||||||||
| RI | ||||||||||||||||||||||||||||||||
| Month | Year | Block | Index | Fwd Price | Buffer | Total Index | Index Cost | |||||||||||||||||||||||||
| 9 | 2025 | - 0 | 1,718,960 | $ 42.04 | 2% | $ 42.88 | $ 73,710.38 | |||||||||||||||||||||||||
| 10 | 2025 | - 0 | 1,459,080 | $ 41.33 | 2% | $ 42.16 | $ 61,512.25 | |||||||||||||||||||||||||
| 11 | 2025 | - 0 | 1,357,693 | $ 59.45 | 2% | $ 60.64 | $ 82,333.28 | |||||||||||||||||||||||||
| 12 | 2025 | 2,052,141 | 362,142 | $ 100.69 | 2% | $ 102.71 | $ 37,194.80 | |||||||||||||||||||||||||
| 1 | 2026 | 1,222,742 | 215,778 | $ 135.27 | 2% | $ 137.98 | $ 29,772.91 | |||||||||||||||||||||||||
| 2 | 2026 | 1,103,300 | 194,700 | $ 113.55 | 2% | $ 115.82 | $ 22,550.06 | |||||||||||||||||||||||||
| 3 | 2026 | - 0 | 1,360,600 | $ 63.10 | 2% | $ 64.37 | $ 87,575.76 | |||||||||||||||||||||||||
| 4 | 2026 | - 0 | 1,320,920 | $ 46.55 | 2% | $ 47.49 | $ 62,723.99 | |||||||||||||||||||||||||
| 5 | 2026 | - 0 | 1,402,360 | $ 40.96 | 2% | $ 41.78 | $ 58,587.48 | |||||||||||||||||||||||||
| 6 | 2026 | - 0 | 1,691,320 | $ 45.73 | 2% | $ 46.64 | $ 78,883.28 | |||||||||||||||||||||||||
| 7 | 2026 | 1,741,548 | 307,332 | $ 63.93 | 2% | $ 65.21 | $ 20,040.02 | |||||||||||||||||||||||||
| 8 | 2026 | 1,485,868 | 262,212 | $ 52.01 | 2% | $ 53.05 | $ 13,909.71 | |||||||||||||||||||||||||
| 9 | 2026 | - 0 | 1,718,960 | $ 42.83 | 2% | $ 43.68 | $ 75,088.50 | |||||||||||||||||||||||||
| 10 | 2026 | - 0 | 1,459,080 | $ 41.15 | 2% | $ 41.97 | $ 61,238.76 | |||||||||||||||||||||||||
| 11 | 2026 | - 0 | 1,357,693 | $ 56.69 | 2% | $ 57.82 | $ 78,500.96 | |||||||||||||||||||||||||
| 12 | 2026 | 2,052,141 | 362,142 | $ 82.32 | 2% | $ 83.96 | $ 30,406.21 | |||||||||||||||||||||||||
| 1 | 2027 | 1,222,742 | 215,778 | $ 125.91 | 2% | $ 128.43 | $ 27,712.76 | |||||||||||||||||||||||||
| 2 | 2027 | 1,103,300 | 194,700 | $ 103.84 | 2% | $ 105.92 | $ 20,622.66 | |||||||||||||||||||||||||
| 3 | 2027 | - 0 | 1,360,600 | $ 49.56 | 2% | $ 50.55 | $ 68,777.89 | |||||||||||||||||||||||||
| 4 | 2027 | - 0 | 1,320,920 | $ 36.17 | 2% | $ 36.89 | $ 48,732.93 | |||||||||||||||||||||||||
| 5 | 2027 | - 0 | 1,402,360 | $ 30.85 | 2% | $ 31.46 | $ 44,122.83 | |||||||||||||||||||||||||
| 6 | 2027 | - 0 | 1,691,320 | $ 35.12 | 2% | $ 35.83 | $ 60,592.89 | |||||||||||||||||||||||||
| 7 | 2027 | 1,741,548 | 307,332 | $ 53.01 | 2% | $ 54.07 | $ 16,617.70 | |||||||||||||||||||||||||
| 8 | 2027 | 1,485,868 | 262,212 | $ 47.48 | 2% | $ 48.43 | $ 12,698.10 | |||||||||||||||||||||||||
| 9 | 2027 | - 0 | 1,718,960 | $ 34.06 | 2% | $ 34.74 | $ 59,710.55 | |||||||||||||||||||||||||
| 10 | 2027 | - 0 | 1,459,080 | $ 33.39 | 2% | $ 34.05 | $ 49,687.77 | |||||||||||||||||||||||||
| 11 | 2027 | - 0 | 1,357,693 | $ 44.56 | 2% | $ 45.46 | $ 61,714.42 | |||||||||||||||||||||||||
| 12 | 2027 | 2,052,141 | 362,142 | $ 67.38 | 2% | $ 68.73 | $ 24,888.63 | |||||||||||||||||||||||||
| 1 | 2028 | 1,222,742 | 215,778 | $ 114.29 | 2% | $ 116.58 | $ 25,154.42 | |||||||||||||||||||||||||
| 2 | 2028 | 1,103,300 | 194,700 | $ 108.71 | 2% | $ 110.88 | $ 21,588.40 | |||||||||||||||||||||||||
| 3 | 2028 | - 0 | 1,360,600 | $ 33.99 | 2% | $ 34.67 | $ 47,173.67 | |||||||||||||||||||||||||
| 4 | 2028 | - 0 | 1,320,920 | $ 29.73 | 2% | $ 30.33 | $ 40,060.86 | |||||||||||||||||||||||||
| 5 | 2028 | - 0 | 1,402,360 | $ 28.92 | 2% | $ 29.50 | $ 41,366.61 | |||||||||||||||||||||||||
| 6 | 2028 | - 0 | 1,691,320 | $ 32.07 | 2% | $ 32.71 | $ 55,326.21 | |||||||||||||||||||||||||
| 7 | 2028 | 1,741,548 | 307,332 | $ 46.93 | 2% | $ 47.87 | $ 14,711.35 | |||||||||||||||||||||||||
| 8 | 2028 | 1,485,868 | 262,212 | $ 43.97 | 2% | $ 44.85 | $ 11,758.96 | |||||||||||||||||||||||||
| 9 | 2028 | - 0 | 1,718,960 | $ 30.09 | 2% | $ 30.69 | $ 52,750.18 | |||||||||||||||||||||||||
| 10 | 2028 | - 0 | 1,459,080 | $ 29.62 | 2% | $ 30.21 | $ 44,084.87 | |||||||||||||||||||||||||
| 11 | 2028 | - 0 | 1,357,693 | $ 39.11 | 2% | $ 39.89 | $ 54,157.86 | |||||||||||||||||||||||||
| 12 | 2028 | 2,052,141 | 362,142 | $ 53.03 | 2% | $ 54.09 | $ 19,587.75 | |||||||||||||||||||||||||
| 1 | 2029 | 1,222,742 | 215,778 | $ 110.04 | 2% | $ 112.24 | $ 24,218.76 | |||||||||||||||||||||||||
| 2 | 2029 | 1,103,300 | 194,700 | $ 104.72 | 2% | $ 106.82 | $ 20,796.95 | |||||||||||||||||||||||||
| 3 | 2029 | - 0 | 1,360,600 | $ 38.91 | 2% | $ 39.69 | $ 54,002.23 | |||||||||||||||||||||||||
| 4 | 2029 | - 0 | 1,320,920 | $ 29.26 | 2% | $ 29.84 | $ 39,420.43 | |||||||||||||||||||||||||
| 5 | 2029 | - 0 | 1,402,360 | $ 28.28 | 2% | $ 28.85 | $ 40,451.92 | |||||||||||||||||||||||||
| 6 | 2029 | - 0 | 1,691,320 | $ 29.98 | 2% | $ 30.58 | $ 51,715.29 | |||||||||||||||||||||||||
| 7 | 2029 | 1,741,548 | 307,332 | $ 44.32 | 2% | $ 45.20 | $ 13,892.36 | |||||||||||||||||||||||||
| 8 | 2029 | 1,485,868 | 262,212 | $ 40.35 | 2% | $ 41.15 | $ 10,790.97 | |||||||||||||||||||||||||
| 9 | 2029 | - 0 | 1,718,960 | $ 28.05 | 2% | $ 28.61 | $ 49,178.05 | |||||||||||||||||||||||||
| 10 | 2029 | - 0 | 1,459,080 | $ 27.53 | 2% | $ 28.08 | $ 40,974.40 | |||||||||||||||||||||||||
| 11 | 2029 | - 0 | 1,357,693 | $ 36.79 | 2% | $ 37.53 | $ 50,953.36 | |||||||||||||||||||||||||
| 12 | 2029 | 2,052,141 | 362,142 | $ 51.26 | 2% | $ 52.28 | $ 18,932.86 | |||||||||||||||||||||||||
| 1 | 2030 | 1,222,742 | 215,778 | $ 114.77 | 2% | $ 117.07 | $ 25,260.78 | |||||||||||||||||||||||||
| 2 | 2030 | 1,103,300 | 194,700 | $ 107.96 | 2% | $ 110.12 | $ 21,441.15 | |||||||||||||||||||||||||
| 3 | 2030 | - 0 | 1,360,600 | $ 39.57 | 2% | $ 40.36 | $ 54,917.44 | |||||||||||||||||||||||||
| 4 | 2030 | - 0 | 1,320,920 | $ 28.49 | 2% | $ 29.06 | $ 38,380.88 | |||||||||||||||||||||||||
| 5 | 2030 | - 0 | 1,402,360 | $ 27.05 | 2% | $ 27.59 | $ 38,688.36 | |||||||||||||||||||||||||
| 6 | 2030 | - 0 | 1,691,320 | $ 28.54 | 2% | $ 29.11 | $ 49,241.43 | |||||||||||||||||||||||||
| 7 | 2030 | 1,741,548 | 307,332 | $ 43.27 | 2% | $ 44.14 | $ 13,565.70 | |||||||||||||||||||||||||
| 8 | 2030 | 1,485,868 | 262,212 | $ 38.46 | 2% | $ 39.23 | $ 10,287.37 | |||||||||||||||||||||||||
| Total Index | 2,464,739.34 | |||||||||||||||||||||||||||||||
| Total | 38,027,993 | 58,265,487 | $/kWh | $ 0.04230 | ||||||||||||||||||||||||||||
| 96,293,480 |
&C&"Arial"&8&K000000INTERNAL&1#
File details come from the government source that posted it. Updated .