472_22426 - CTS Full Set Drawings_Stamped_Part5.pdf

PDF 423 KB Posted

Attached to
472/22426. CTS; CMCF - Various Security Upgrades
Solicitation number
RFQ 171 240000000205 2
Issued by
Gogebic County, Sterling Heights City, Michigan

About this file

This is a technical design and construction document for a security controls and gate installation project prepared by the Department of Technology, Management and Budget, State of Michigan, State Facilities Administration, Design and Construction Division, in collaboration with Straub Pettitt Yaste architects. The project involves the replacement of multiple sliding security gates (Gates 1-5) with new electric locks and door position switches, installation of a new programmable logic controller (PLC), and integration of new control panels with CAT 6 Ethernet connectivity. The work requires coordination between the Automated Utilities Systems (AUS) contractor and gate installers, with gate changeouts scheduled during night shifts to maintain facility security interlocks. AUS requires three weeks on site for pre-installation preparations and three weeks following gate replacement for finalization and removal of existing controls. Each gate replacement must be completed within a single night shift to ensure operational status before site departure. The project includes testing protocols for proper gate operation and interlock functionality, with final documentation and instruction provided to facility personnel.

The project includes stock items to be provided and transferred to the customer upon completion, consisting of one Allen-Bradley PLC unit, one input module, one output module, one power supply, one Ethernet IP adapter, multiple push buttons, latch plates, contact blocks, LED indicators, and a MeanWell power supply with alternate Traco UPS option. The design drawings reflect a 50% construction document review phase dated August 22, 2023, with 100% drawings dated January 19, 2024. The scope encompasses wiring and cabling additions, PLC pre-programming, control panel installation, and comprehensive testing of the security gate system to ensure all interlocks function properly across the four primary gates and associated control stations located in the control bubble, Sargent's desk, and control center panel areas.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gate 1

Gate 2

Gate 3

Gate 4

Visit

PLC

CAT 6 Ethernet

CAT 6 Ethernet

PLC

Control Bubble Panel

Locate in

M a tr ix

08-22-23 50% CD REVIEW

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

S t r a u b

P e t t i t t Y a s t e

0 N

. C ro ok s R oa d, Su ite

Cl aw so n, Mi ch iga n 4

8 -

8 -

SECURITY CONTROLS AND GATE INSTALLATION SEQUENCE.

1. AUS TO ADD ANY ADDITIONAL CABLING/WIRING NEEDED FOR THE NEW SLIDERS/ELECTRIC LOCKS/DOOR POSITION SWITCHES AS

NEEDED BEFORE THE GATES ARE REPLACED.

2. NEW PLC TO BE PRE-PROGRAMMED AND INSTALLED. CONTROL PANELS TO BE INSTALLED TEMPORARILY NEXT TO THE EXISTING CONTROLS BEFORE ANY SLIDING GATES ARE REPLACED. INTERLOCKS TO BE MAINTAINED DURING THE GATE REPLACEMENT PROCESS, THIS INCLUDES INTERLOCKS BETWEEN THE OLD DOOR CONTROLS AND THE NEW DOOR CONTROLS DURING THE CHANGE

OUT PROCESS.

3. GATE CHANGE OUT TO BE SCHEDULE FOR NIGHT SHIFT WORK.

4. AUS AND GATE INSTALLERS TO COORDINATE TO BE ON SITE AT THE SAME TIME DURING GATE CHANGE OUT.

5. THE GATE CONTRACTOR SHALL NOTIFY AUS TO DROP AND REMOVE CONDUIT/POWER TO THE GATE AT THE BEGINNING OF THE

NIGHT SHIFT TO ALLOW THE GATE REPLACEMENT TO BEGIN.

6. ONCE THE GATE HAS BEEN REPLACED THE GATE CONTRACTOR SHALL NOTIFY AUS THEY ARE READY FOR THE CONDUIT/POWER TO

BE RECONNECTED AND TESTED.

7. THE GATE SHALL BE TESTED FOR PROPER OPERATION INCLUDING PROPER INTERLOCKING, AUS SHALL INSTRUCT THE

BUBBLE/CONTROL OFFICER THE NEW GATE CONTROL HAS BEEN MOVED TO THE NEW CONTROL PANEL.

8. GATE SHALL BE IN OPERATING ORDER AND AREA CLEARED OF ANY CONSTRUCTION MATERIAL BEFORE LEAVING THE SITE FOR THE

DAY.

9. ONCE ALL GATES HAVE BEEN INSTALLED A FINAL INTERLOCK TEST SHALL BE PERFORMED (SEE INTERLOCK SCHEDULE ON SHEET

SE-103).

10. ONCE THE NEW CONTROL PANEL HAS BEEN FULLY TESTED THE OLD CONTROLS CAN BE REMOVED AND THE NEW CONTROLS

SHALL BE PERMANENTLY INSTALLED IN ITS PLACE.

SCHEDULE

1. AUS WILL HAVE THE CONTROLS AND PLC PROGRAMMING PREBUILT BEFORE INSTALLATION TO MINIMIZE THE TIME ON SITE.

2. AUS WILL NEED 3 WEEKS ON SITE TO PREP FOR GATE REPLACEMENT PRIOR TO ANY GATES BEING REPLACED.

3. EACH GATE WILL NEED TO BE REPLACED IN A SINGLE NIGHT SHIFT SO THAT THE GATE WILL BE OPERATIONAL BEFORE LEAVING THE

SITE.

4. AUS WILL BE ONSITE DURING THE GATE REPLACEMENT AND HELP TEST WITH THE GATE CONTRACTOR.

5. AUS WILL NEED 3 WEEKS ON SITE TO FINALIZE WORK AND DEMO EXISTING CONTROLS AFTER THE GATES HAVE BEEN REPLACED.

SE-103

1/19/2024

WP

100% Drawings

PLC RISER

Locate in

CAT 6 Ethernet

PLC

7 Conductor THHN #14 AWG.

Control Center Panel

Sargent's Desk Panel

Control

Dep-Suite

Gate 4

Gate 5

Day-Night

Control Bubble I/O Modules

Gate 4

Gate 5

Comm

ATTIC STOCK TO BE PROVIDED AND TURNED OVER TO CUSTOMER AT THE END OF THE PROJECT:

(1) AB #1769-L24ER-QBIB, PLC

(1) AB #1769-IQ32, INPUT MODULE

(1) AB #1769-QB32, OUTPUT MODULE

(1) AB #1769-P4A, POWER SUPPLY

(1) AB #1769-AENTR, ETHERNET IP ADAPTER

(1) AB #800FM-F2, PUSH BUTTON

(3) AB #800F-ALM, LATCH PLATE

(4) AB #800F-X10, NORMALLY OPEN CONTACT

(1) AB #800FM-SB32, 3 POS SWITCH

(4) AB #800L-12L-10GS, GREEN LED

(4) AB #800L-12L-10RS, RED LED

(1) MEANWELL #NDR240-24, 10AMP POWER SUPPLY

ALTERNATE #3

Traco #TSPC-240-124-UPS

HC

VR

Locate in Electronics RmLocate in Electronics Rm

File details come from the government source that posted it. Updated .