43ADG-S4059_Cost_Schedule.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- National Guard - Landscaping Services
- Solicitation number
- 43ADG-S4059
- Issued by
- Nevada
About this file
This Cost Schedule is a pricing document for landscaping and grounds maintenance services requested by the State of Nevada, Nevada Office of the Military, Nevada Department of Adjutant General and National Guard. The services cover routine maintenance including mowing, edging, trimming, and blowing performed on an as-needed basis at 19 locations throughout Nevada (Carson City, Carlin, Elko, Fallon, Reno, Henderson, North Las Vegas, and Las Vegas). The contract term runs from February 1, 2027, through January 31, 2031, for a four-year period. All rates must be fully loaded to include labor, payroll burden, overhead, and profit, and rates entered for each contract year must remain firm for the duration of that year.
The Cost Schedule requires vendors to complete all applicable pricing tabs for all four contract years, including Recurring Maintenance (base service-call rate plus hourly rate per location), Hourly Time-and-Materials rates by labor category (General Laborer/Groundskeeper, Irrigation Specialist, Arborist, and Supervisor/Crew Lead), One-Time Project Work pricing with standard markup percentages on materials and subcontracted work, Per-Unit Pricing for measurable work units, and Additional Cost Items such as fuel surcharges, disposal fees, equipment rental charges, minimum trip charges, and emergency response premiums. No blank rate fields are permitted; vendors must enter either a specific rate or $0.00 if a service will not be charged. Project work exceeding $10,000 requires vendors to propose milestone or progress billing terms in their quotes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 43ADG-S4059 - Request for Qualifications (2).docx | DOCX document | |
| 43ADG-S4059 -Vendor-Information-Response (1).pdf | ||
| 43ADG-S4059 RFQ Service Locations.xlsx | XLSX spreadsheet | |
| NVARNG Personal Security Questionnaire.pdf | ||
| 43ADG-S4059 Scope of Work.docx | DOCX document | |
| 43ADG-S4059 - NOM Standard Form Contract.docx | DOCX document | |
| Quote Instructions.pdf | ||
| 43ADG-S4059-Insurance Requirements.docx | DOCX document | |
| 43ADG-S4059 RFQ_Vendor_Qualifications_Response_Form.xlsx | XLSX spreadsheet | |
| Terms-and-conditions-for-services~6.pdf | ||
| NVARNG Environmental Policy Statement.pdf | ||
| Certification-regarding-lobbying~7.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| COST SCHEDULE – LANDSCAPING AND GROUNDS MAINTENANCE SERVICES |
| RFQ [43ADG-S4059] | Contract Term: 2/1/2027 – 1/31/2031 (4 Years) |
| Legal Business Name |
| Primary Contact / Title |
| Telephone |
| Date Submitted |
| INSTRUCTIONS TO VENDORS |
| This Cost Schedule is organized into tabs reflecting the different ways services under this contract may be priced. Vendor must complete every applicable tab for all four contract years. All rates must be fully loaded (labor, payroll burden, overhead, and profit) unless a separate line item is provided for that cost elsewhere in this schedule. Do not leave a rate field blank; enter $0.00 only if a service genuinely will not be charged. Rates entered for a given contract year must be held firm for the duration of that year. |
| TAB GUIDE | |
| Recurring Maintenance | Routine mowing, edging, trimming, and blowing, performed on an as-needed basis. Priced per location as a base service-call rate plus an hourly rate for time on site. |
| Hourly - T&M Rates | Rate card by labor category for odd jobs, cleanups, repairs, and add-on work outside the base recurring scope. Applies statewide, not per location. |
| One-Time - Project Work | Installs, hardscaping, sod, tree removal, and grading. Priced as a fixed bid/quote at the time of request; this tab captures the standard markup Vendor will apply and milestone billing terms. |
| Per-Unit Pricing | Rates for measurable units of work (per square foot, per cubic yard, per tree/shrub) used as the basis for project quotes and smaller add-on work. |
| Additional Cost Items | Fuel surcharge, disposal/dump fees, equipment charges, minimum trip charge, and emergency response premium. |
Recurring Maintenance
| AS-NEEDED MAINTENANCE PRICING – BASE + HOURLY RATE (Mowing, Edging, Trimming, Blowing) | |||||||
| Location | Year 1 (2/1/27 – 1/31/28) | Year 2 (2/1/28 – 1/31/29) | Year 3 (2/1/29 – 1/31/30) | Year 4 (2/1/30 – 1/31/31) | |||
| Region | Building Name | Address | Base Rate | ||||
| ($/service call) | Hourly Rate | ||||||
| ($/hr) | Base Rate | ||||||
| ($/service call) | Hourly Rate | ||||||
| ($/hr) | Base Rate | ||||||
| ($/service call) | Hourly Rate | ||||||
| ($/hr) | Base Rate | ||||||
| ($/service call) | Hourly Rate |
($/hr)
| Carson City | OTAG | 2460 Fairview Drive |
| Carson City | USPFO | 2452 Fairview Drive |
| Carson City | CSMS | 2444 Fairview Drive |
| Carson City | EOC/DEM | 2478 Fairview Drive |
| Carlin/Elko | Battle Born Youth Center | 100 University Ave |
| Fallon | Fallon Armory | 895 E. Richards Street |
| Reno | Plumb Lane Armory | 685 E. Plumb Lane |
| Reno | Washoe County Armory (WCA) | 19980 Army Aviation Drive |
| Reno | Washoe County Training Center | 19970 Army Aviation Drive |
| Reno | AASF | 20000 Army Aviation Drive |
| Reno | FMSA A & B | 19960 Army Aviation Drive |
| Reno | C12 | 19990 Army Aviation Drive |
| Henderson | Henderson Armory | 151 E. Horizon Pkwy |
| North Las Vegas | Speedway Readiness Center | 7995 North Hollywood Blvd |
| North Las Vegas | North Las Vegas Readiness Center (NLVRC) | 6600 Range Rd |
| North Las Vegas | Clark County Armory (CCA) | 6490 Range Rd |
| North Las Vegas | FMS 1 | 6510 Range Rd |
| North Las Vegas | CSMS | 6520 Range Rd |
| Las Vegas | Las Vegas Readiness Center (LVRC) | 4500 Silverado Ranch Blvd |
| Las Vegas | FMS 7 | 4500 Ranch Blvd |
Hourly - T&M Rates
| HOURLY / TIME-AND-MATERIALS RATE SCHEDULE (Odd Jobs, Cleanups, Repairs, Add-On Work) | |||||
| Labor Category | Year 1 (2/1/27 – 1/31/28) | Year 2 (2/1/28 – 1/31/29) | Year 3 (2/1/29 – 1/31/30) | Year 4 (2/1/30 – 1/31/31) | |
| Labor Category | Standard Rate | ||||
| ($/hr) | Overtime / After- | ||||
| Hours Rate ($/hr) | Standard Rate | ||||
| ($/hr) | Overtime / After- | ||||
| Hours Rate ($/hr) | Standard Rate | ||||
| ($/hr) | Overtime / After- | ||||
| Hours Rate ($/hr) | Standard Rate | ||||
| ($/hr) | Overtime / After- |
Hours Rate ($/hr)
| General Laborer / Groundskeeper |
| Irrigation Specialist |
| Arborist |
| Supervisor / Crew Lead |
One-Time - Project Work
| ONE-TIME / PROJECT WORK PRICING (Installs, Hardscaping, Sod, Tree Removal, Grading) |
| One-time or project work is priced as a fixed bid/quote submitted by Vendor at the time of request, using the per-unit and hourly rates established elsewhere in this Cost Schedule as the basis. For projects exceeding $10,000, Vendor shall propose milestone or progress billing terms with the quote. Vendor must identify the standard markup, if any, it will apply to materials and subcontracted work for one-time projects, for each contract year below. |
| Project Types Covered by This Contract | ||
| • Irrigation System Installation / Repair | ||
| • Sod Installation | ||
| • Hardscaping (patios, walkways, retaining walls) | ||
| • Tree / Shrub Removal | ||
| • Grading / Regrading | ||
| • Landscape / Planting Installation | ||
| STANDARD MARKUP ON MATERIALS & SUBCONTRACTED WORK | ||
| Cost Basis | Year 1 | |
| Markup (%) | Year 2 | |
| Markup (%) | Year 3 | |
| Markup (%) | Year 4 |
Markup (%) Materials & Subcontracted Work
Per-Unit Pricing
| PER-UNIT PRICING SCHEDULE | |||
| Item | Unit of Measure | Year 1 | |
| Rate | Year 2 | ||
| Rate | Year 3 | ||
| Rate | Year 4 |
Rate
| Sod Installation | per sq ft |
| Mulch Bed Installation | per sq ft |
| Turf Treatment | per sq ft |
| Mulch (material + placement) | per cubic yard |
| Soil (material + placement) | per cubic yard |
| Tree (install or removal) | per each |
| Shrub (install or removal) | per each |
Additional Cost Items
| ADDITIONAL COST ITEMS / ADD-ONS | |||
| Item | Unit / Basis | Year 1 | |
| Rate | Year 2 | ||
| Rate | Year 3 | ||
| Rate | Year 4 |
Rate
| Fuel Surcharge | % of invoice |
| Disposal / Dump Fee | per load |
| Equipment Rental Charge (specify equipment in Vendor Response) | per day |
| Minimum Trip / Mobilization Charge | per visit |
| Emergency / Urgent Response Premium | % above standard rate |
File details come from the government source that posted it. Updated .