This is a pre-bid sign-in sheet for a public works project issued by the State of Nevada, Office of the Military, for water heater replacement at the Nevada Army National Guard facility located at 2460 Fairview Drive, Carson City. The project scope encompasses demolition and replacement of the existing water heating system with a new high-efficiency, gas-fired, tankless domestic water heater skid, installation of a new soft water storage tank, relocation of an existing water softener, and associated mechanical, plumbing, electrical, and control system modifications. A pre-bid meeting was held on November 6, 2026, at 9:00 a.m. on-site, with attendance strongly encouraged but not mandatory. Bids are due November 24, 2026, at 10:00 a.m. via virtual submission through NevadaEPro.com. Questions must be submitted by November 12, 2026, at 5:00 p.m., with official responses and addenda posted on or about November 17, 2026. The contract term is 90 calendar days from Notice to Proceed, with liquidated damages of $300 per excess calendar day.
The estimated construction cost for the base bid is $175,000. All materials must be new and UL-labeled where available, meeting ASME, ASPE, ANSI, and IEEE standards. Bids exceeding $100,000 require 5% bid bond, performance bond, and payment bond. All bidders must be qualified with the Nevada State Controller's Office, maintain an active vendor profile on NevadaEPro, hold a valid Nevada State Contractors Board license, and comply with prevailing wage requirements under NRS Chapter 338, specifically the Northern Nevada Rural Region prevailing wage determination effective October 13, 2026, through September 30, 2027. Bidders must submit a 5% subcontractor list with their bid, and the three lowest bidders must submit a 1% subcontractor list within two hours of opening. Contractors are required to survey existing conditions prior to bidding with no allowance for claims based on conditions discovered during work, and a one-year warranty covering labor and materials plus manufacturer guarantees for all equipment are mandatory.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .