43ADG-S4055_OTAG WH_Existing Condition Photos_2.7z
7Z file 119 MB Posted
- Attached to
- OTAG Water Heater Replacement
- Solicitation number
- 43ADG-S4055
- Issued by
- Churchill County, Nevada
About this file
This file contains existing condition photographs for a water heater replacement project at the Nevada Army National Guard facility, managed by the State of Nevada, Office of the Military. The project involves the demolition and replacement of the existing water heating system with a new high-efficiency, gas-fired, tankless domestic water heater skid, installation of a new soft water storage tank, relocation of an existing water softener, and associated mechanical, plumbing, electrical, and control system modifications. A pre-bid meeting is scheduled for November 6, 2026 at 9:00 a.m. on-site at 2460 Fairview Drive, Carson City, with attendance strongly encouraged but not mandatory. Questions must be submitted by November 12, 2026 at 5:00 p.m., with official responses and addenda posted on or about November 17, 2026. Sealed bids are due November 24, 2026 at 10:00 a.m. via virtual submission through NevadaEPro.com. The contract duration is 90 calendar days from Notice to Proceed, with liquidated damages assessed at $300 per excess calendar day.
The estimated construction cost for the base bid is $175,000. All materials must be new and UL-labeled where available, meeting ASME, ASPE, ANSI, and IEEE standards. Bidders must be qualified with the Nevada State Controller's Office, maintain an active vendor profile on NevadaEPro, and hold a valid Nevada State Contractors Board license. Bids exceeding $100,000 require 5% bid bond, performance bond, and payment bond. Prevailing wage requirements under NRS Chapter 338 apply, with the Northern Nevada Rural Region prevailing wage determination effective October 13, 2026 through September 30, 2027. Contractors must survey existing conditions prior to bidding, with no allowance for claims based on conditions discovered during work. A one-year warranty covering labor and materials and manufacturer guarantees for all equipment are required. Bidders must submit a 5% subcontractor list with their bid; the three lowest bidders must submit a 1% subcontractor list within two hours of opening.
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .