43ADG-S4055_OTAG WH_Existing Condition Photos_1.7z

7Z file 60 MB Posted

Attached to
OTAG Water Heater Replacement
Solicitation number
43ADG-S4055
Issued by
Churchill County, Nevada

About this file

This file contains existing condition photographs for the OTAG Water Heater Replacement project managed by the State of Nevada, Office of the Military at the Nevada Army National Guard facility located at 2460 Fairview Drive, Carson City. The project scope encompasses demolition and replacement of the existing water heating system with a new high-efficiency, gas-fired, tankless domestic water heater skid, installation of a new soft water storage tank, relocation of an existing water softener, and associated mechanical, plumbing, electrical, and control system modifications throughout the facility. A pre-bid meeting is scheduled for November 6, 2026 at 9:00 a.m. on-site, with attendance strongly encouraged but not mandatory. Bids are due November 24, 2026 at 10:00 a.m. via virtual submission through NevadaEPro.com. Questions must be submitted by November 12, 2026 at 5:00 p.m., with official responses and addenda to be posted on or about November 17, 2026. The contract term is 90 calendar days from Notice to Proceed, with liquidated damages of $300 per excess calendar day.

The estimated construction cost for the base bid is $175,000, with bids exceeding $100,000 requiring 5% bid bond, performance bond, and payment bond. All materials must be new and UL-labeled where available, meeting ASME, ASPE, ANSI, and IEEE standards. A one-year warranty covering labor and materials and manufacturer guarantees for all equipment are required. All bidders must be qualified with the Nevada State Controller's Office, maintain an active vendor profile on NevadaEPro, hold a valid Nevada State Contractors Board license, and comply with prevailing wage requirements under NRS Chapter 338 and the Northern Nevada Rural Region prevailing wage determination effective October 13, 2026 through September 30, 2027. Bidders must submit a 5% subcontractor list with their bid; the three lowest bidders must submit a 1% subcontractor list within two hours of opening. The contractor must survey existing conditions prior to bidding with no allowance for claims based on conditions discovered during work.

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .