43ADG-S4013_Cost_Schedule.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
National Guard - Landscaping Services
Solicitation number
43ADG-S4013
Issued by
Nevada

About this file

This is a Cost Schedule document for an RFQ issued by the State of Nevada Purchasing Division on behalf of the Nevada Office of the Military, Nevada Department of Adjutant General and National Guard for Landscaping and Grounds Maintenance Services. The contract covers landscaping services at 19 National Guard facilities located across Nevada in Carson City, Carlin, Elko, Fallon, Reno, Henderson, North Las Vegas, and Las Vegas. Services include recurring maintenance (routine mowing, edging, trimming, and blowing), time-and-materials work for odd jobs and repairs, one-time project work (irrigation installation, sod installation, hardscaping, tree removal, and grading), and per-unit pricing for measurable work. The contract term is four years, from February 1, 2027, through January 31, 2031, with rates held firm for each contract year.

Vendors must complete all applicable pricing tabs within the cost schedule, providing fully loaded rates (including labor, payroll burden, overhead, and profit) for all four contract years. Pricing is structured as follows: recurring maintenance is priced per location as a base service-call rate plus an hourly rate; hourly time-and-materials rates apply statewide by labor category (General Laborer/Groundskeeper, Irrigation Specialist, Arborist, and Supervisor/Crew Lead) with separate standard and overtime rates; one-time project work is quoted individually with a standard markup applied to materials and subcontracted work; and per-unit pricing is provided for sod installation, mulch bed installation, turf treatment, soil, trees, and shrubs. Additional cost items include fuel surcharge, disposal/dump fees, equipment rental charges, minimum trip charges, and emergency response premiums. All rate fields must be completed; blank fields are not permitted, and $0.00 should only be entered if a service genuinely will not be charged.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

COST SCHEDULE – LANDSCAPING AND GROUNDS MAINTENANCE SERVICES
RFQ [43ADG-S4013] | Contract Term: 2/1/2027 – 1/31/2031 (4 Years)
Legal Business Name
Primary Contact / Title
Telephone
Email
Date Submitted
INSTRUCTIONS TO VENDORS
This Cost Schedule is organized into tabs reflecting the different ways services under this contract may be priced. Vendor must complete every applicable tab for all four contract years. All rates must be fully loaded (labor, payroll burden, overhead, and profit) unless a separate line item is provided for that cost elsewhere in this schedule. Do not leave a rate field blank; enter $0.00 only if a service genuinely will not be charged. Rates entered for a given contract year must be held firm for the duration of that year.
TAB GUIDE
Recurring MaintenanceRoutine mowing, edging, trimming, and blowing, performed on an as-needed basis. Priced per location as a base service-call rate plus an hourly rate for time on site.
Hourly - T&M RatesRate card by labor category for odd jobs, cleanups, repairs, and add-on work outside the base recurring scope. Applies statewide, not per location.
One-Time - Project WorkInstalls, hardscaping, sod, tree removal, and grading. Priced as a fixed bid/quote at the time of request; this tab captures the standard markup Vendor will apply and milestone billing terms.
Per-Unit PricingRates for measurable units of work (per square foot, per cubic yard, per tree/shrub) used as the basis for project quotes and smaller add-on work.
Additional Cost ItemsFuel surcharge, disposal/dump fees, equipment charges, minimum trip charge, and emergency response premium.

Recurring Maintenance

AS-NEEDED MAINTENANCE PRICING – BASE + HOURLY RATE (Mowing, Edging, Trimming, Blowing)
LocationYear 1 (2/1/27 – 1/31/28)Year 2 (2/1/28 – 1/31/29)Year 3 (2/1/29 – 1/31/30)Year 4 (2/1/30 – 1/31/31)
RegionBuilding NameAddressBase Rate
($/service call)Hourly Rate
($/hr)Base Rate
($/service call)Hourly Rate
($/hr)Base Rate
($/service call)Hourly Rate
($/hr)Base Rate
($/service call)Hourly Rate

($/hr)

Carson CityOTAG2460 Fairview Drive
Carson CityUSPFO2452 Fairview Drive
Carson CityCSMS2444 Fairview Drive
Carson CityEOC/DEM2478 Fairview Drive
Carlin/ElkoBattle Born Youth Center100 University Ave
FallonFallon Armory895 E. Richards Street
RenoPlumb Lane Armory685 E. Plumb Lane
RenoWashoe County Armory (WCA)19980 Army Aviation Drive
RenoWashoe County Training Center19970 Army Aviation Drive
RenoAASF20000 Army Aviation Drive
RenoFMSA A & B19960 Army Aviation Drive
RenoC1219990 Army Aviation Drive
HendersonHenderson Armory151 E. Horizon Pkwy
North Las VegasSpeedway Readiness Center7995 North Hollywood Blvd
North Las VegasNorth Las Vegas Readiness Center (NLVRC)6600 Range Rd
North Las VegasClark County Armory (CCA)6490 Range Rd
North Las VegasFMS 16510 Range Rd
North Las VegasCSMS6520 Range Rd
Las VegasLas Vegas Readiness Center (LVRC)4500 Silverado Ranch Blvd
Las VegasFMS 74500 Ranch Blvd

Hourly - T&M Rates

HOURLY / TIME-AND-MATERIALS RATE SCHEDULE (Odd Jobs, Cleanups, Repairs, Add-On Work)
Labor CategoryYear 1 (2/1/27 – 1/31/28)Year 2 (2/1/28 – 1/31/29)Year 3 (2/1/29 – 1/31/30)Year 4 (2/1/30 – 1/31/31)
Labor CategoryStandard Rate
($/hr)Overtime / After-
Hours Rate ($/hr)Standard Rate
($/hr)Overtime / After-
Hours Rate ($/hr)Standard Rate
($/hr)Overtime / After-
Hours Rate ($/hr)Standard Rate
($/hr)Overtime / After-

Hours Rate ($/hr)

General Laborer / Groundskeeper
Irrigation Specialist
Arborist
Supervisor / Crew Lead

One-Time - Project Work

ONE-TIME / PROJECT WORK PRICING (Installs, Hardscaping, Sod, Tree Removal, Grading)
One-time or project work is priced as a fixed bid/quote submitted by Vendor at the time of request, using the per-unit and hourly rates established elsewhere in this Cost Schedule as the basis. For projects exceeding $10,000, Vendor shall propose milestone or progress billing terms with the quote. Vendor must identify the standard markup, if any, it will apply to materials and subcontracted work for one-time projects, for each contract year below.
Project Types Covered by This Contract
• Irrigation System Installation / Repair
• Sod Installation
• Hardscaping (patios, walkways, retaining walls)
• Tree / Shrub Removal
• Grading / Regrading
• Landscape / Planting Installation
STANDARD MARKUP ON MATERIALS & SUBCONTRACTED WORK
Cost BasisYear 1
Markup (%)Year 2
Markup (%)Year 3
Markup (%)Year 4

Markup (%) Materials & Subcontracted Work

Per-Unit Pricing

PER-UNIT PRICING SCHEDULE
ItemUnit of MeasureYear 1
RateYear 2
RateYear 3
RateYear 4

Rate

Sod Installationper sq ft
Mulch Bed Installationper sq ft
Turf Treatmentper sq ft
Mulch (material + placement)per cubic yard
Soil (material + placement)per cubic yard
Tree (install or removal)per each
Shrub (install or removal)per each

Additional Cost Items

ADDITIONAL COST ITEMS / ADD-ONS
ItemUnit / BasisYear 1
RateYear 2
RateYear 3
RateYear 4

Rate

Fuel Surcharge% of invoice
Disposal / Dump Feeper load
Equipment Rental Charge (specify equipment in Vendor Response)per day
Minimum Trip / Mobilization Chargeper visit
Emergency / Urgent Response Premium% above standard rate

File details come from the government source that posted it. Updated .