42220119_BLDG 4-101_Specifications.pdf

PDF 5 MB Posted

Attached to
Building 4-101 WWII Renovation
Solicitation number
6100063819
Issued by
Lebanon County, Pennsylvania

About this file

I apologize, but no actual file content has been provided for me to analyze. While a filename "42220119_BLDG 4-101_Specifications.pdf" is mentioned, the text of the document is not present. Without the actual document content, I cannot generate a summary. To provide a comprehensive summary, I would need the full text or details of the specification document.

View the file

Other files

File Type Posted
Addendum #2.docx DOCX document
Instructions to Bidders DMVA - 2024.docx DOCX document
Wage Rates.pdf PDF
Addendum #3.docx DOCX document
General Conditions to the Construction Contract DMVA 2024 v6.docx DOCX document
Administrative Procedures 2023 DMVA.docx DOCX document
FTIG Area_Maps_3_4_letter.pdf PDF
Notice to Bidders.docx DOCX document
Pre-bid sign in.pdf PDF
Bid docs to be returned with bid submission.pdf PDF
42220119_BLDG 4-101_Drawings.pdf PDF
Addendum #1.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SPECIFICATIONS

DMVA PROJECT NO. 42220119

For

FTIG BLDG 4-101

WWII RENOVATION

AREA 4 – FORT INDIANTOWN GAP,

ANNVILLE, LEBANON COUNTY, PA 17003

COMMONWEALTH OF PENNSYLVANIA

DEPARTMENT OF MILITARY AND VETERANS’ AFFAIRS

ANNVILLE, PENNSYLVANIA

Josh Shapiro, GOVERNOR Major General John R. Pippy, ADJUTANT GENERAL

Date: 09 May, 2025

DESIGN PROFESSIONALS

Office of Facilities and Engineering

Bureau of Design and Project Management Bldg. 0-10, Chapel Road, Ft. Indiantown Gap

Annville, Lebanon County, Pa. 17003 Phone: (717) 820-2101 Fax: (717) 861-8583

DMVA Project#: 42220119 0000002 - 1 FTIG BLDG 4-101 WW2 Renovation

DRAWING INDEX

The drawings which form a part of this project are indicated in the following list.

NUMBER DRAWING TITLE

G.1.0 COVER SHEET

G.1.1 PROJECT INFO

C.1.0 STORM WATER PLAN

A.1.0 DEMO FLOOR PLAN

A.1.1 DEMO ROOF PLAN AND ELEVATIONS

A.1.2 DEMO REFLECTED CEILING PLANS

A.1.3 PROPOSED FLOOR PLAN

A.1.4 PROPOSED ROOF PLAN AND ELEVATIONS

A.1.5 PROPOSED REFLECTED CEILING PLAN

A.2.0 BUILDING SECTIONS AND DETAILS

A.2.1 BUILDING SECTIONS AND DETAILS

A.2.2 PARTITION TYPES

A.3.0 ENLARGED PLANS AND ELEVATIONS

A.3.1 ENLARGED PLANS AND ELEVATIONS

A.4.0 DOOR AND FINISH SCHEDULE AND DETAILS

S.1.0 STRUCTURAL PLANS

M.0.1 HVAC PLANS DEMO

M.1.1 MECHANICAL FLOOR PLANS

M.2.1 MECHANICAL SCHEDULES

M.2.2 MECHANICAL DETAILS

P.0.1 PLUMBING PLANS DEMO

P.1.1 PLUMBING PLANS NEW WORK

P.2.1 PLUMBING SCHEDULES AND DETAILS

E.1.1 ELECTRICAL FLOOR PLANS

E.2.1 RISER DIAGRAM

E.3.1 SCHEDULES AND DETAILS

The above is an exact list of the drawings included under DMVA Project No. 42220119 and shall be considered a part thereof.

As the work progresses, the Bureau of Design and Project Management may furnish supplemental drawings that may be required for further illustrating details of the work. However, these supplemental drawings will not include the shop drawings, all of which are to be prepared by the Contractor and submitted as hereinafter specified for approval before the work is started.

DMVA Project#: 42220119 0000003-1

TABLE OF CONTENTS

SECTION TITLE

DIVISION 01 GENERAL REQUIREMENTS

Section 010100 Summary of Work Section 011200 Coordination and Control Section 013100 Sequence of Construction & Milestones Section 013300 Submittals Section 014000 Quality Control Requirements Section 017700 Closeout Procedures Section 017823 Operation and Maintenance Data Section 017839 Project Record Documents

GENERAL CONSTRUCTION (.1)

DIVISION 02 EXISTING CONDITIONS

Section 024116 Selective Demolition Section 024120 Cutting and Patching

DIVISION 03 METALS

Section 033000 Cast-in-place Concrete

DIVISION 05 METALS

Section 054000 Cold-formed Metal Framing

DIVISION 06 WOOD, PLASTICS, AND COMPOSITES

Section 061000 Rough Carpentry Section 061053 Miscellaneous Rough Carpentry Section 061600 Sheathing Section 062023 Interior Finish Carpentry

DIVISION 07 THERMAL AND MOISTURE PROTECTION

Section 072100 Thermal Insulation Section 072101 Spray Foam Insulation Section 074600 Vinyl Soffit Section 077100 Gutters and Downspouts

DIVISION 08 OPENINGS

Section 081113 Hollow Metal Doors and Frames Section 081416 Flush Wood Doors Section 087111 Door Hardware

DIVISION 09 FINISHES

Section 092216 Non-Structural Metal Framing Section 092900 Gypsum Board Section 095123 Acoustical Tile Ceilings Section 096513 Resilient Base and Accessories Section 096516 Resilient Sheet Flooring

DMVA Project#: 42220119 0000003-2

Section 096519 Resilient Tile Flooring Section 096816 Sheet Carpet Section 097200 Fiberglass Reinforcement Panels Section 099123 Interior Painting

DIVISION 10 SPECIALTIES

Section 102113 Toilet Compartments Section 102800 Toilet Room Accessories Section 104413 Fire Extinguisher Cabinets Section 104416 Fire Extinguishers

DIVISION 12 FURNISHINGS

Section 123530 Residential Casework Section 123623.13 Laminate Countertops

HVAC CONSTRUCTION (.2)

DIVISION 23 HEATING VENTILATION AND AIR CONDITIONING

Section 230500 Common Work Results for HVAC 230500-1 230500-9 Section 230510 HVAC Electrical Equipment and Wiring Requirements 230510-1 230510-5 Section 230515 HVAC Piping, Material, Equipment 230515-1 230515-8 Section 230520 HVAC Specialties 230520-1 230520-5 Section 230553 Mechanical Identification 230553-1 230553-4 Section 230590 Testing, Adjusting and Balancing for HVAC 230593-1 230593-4 Section 230713 HVAC Duct Insulation 230713-1 230713-18 Section 233110 Ductwork, Accessories, and Sheetmetal 233113-1 233113-7 Section 233710 Air Inlets and Outlets 233713-1 233713-2 Section 238126 Split-System Air Conditioners 238126-1 238126-7

PLUMBING CONSTRUCTION (.3)

DIVISION 22 PLUMBING

Section 220500 Common Work Results for Plumbing 220500-1 220500-7 Section 221110 Plumbing Piping 221110-1 221110-5 Section 221310 Plumbing Specialties 221310-1 221310-4 Section 221316 Sanitary Waste and Vent Piping 221316-1 221316-8 Section 223400 Plumbing Equipment 223400-1 223400-3 Section 224000 Plumbing Fixtures 224000-1 224000-7

ELECTRICAL CONSTRUCTION (.4)

DIVISION 26 ELECTRICAL

Section 260500 Common Work Results for Electrical 260500-1 260500-3 Section 260510 Electrical Equipment Wiring 260510-1 260510-4 Section 260519 Low-Voltage Electrical Power Conductors & Cables 260519-1 260519-4 Section 260526 Grounding & Bonding for Electrical Systems 260526-1 260526-5 Section 260529 Hangers & Supports for Electrical Systems 260529-1 260529-4 Section 260533 Raceway & Boxes for Electrical Systems 260533-1 260533-13

DMVA Project#: 42220119 0000003-3

Section 260553 Identification for Electrical Systems 260553-1 260553-5 Section 260573 Overcurrent Protective Device Coordination Study 260573-1 260573-5 Section 260923 Lighting Control Devices 260923-1 260923-3 Section 262416 Panelboards 262416-1 262416-5 Section 262713 Electricity Metering 262713-1 262713-4 Section 262726 Wiring Devices 262726-1 262726-5 Section 262813 Fuses 262813-1 262813-3 Section 262816 Enclosed Switches and Circuit Breakers 262816-1 262816-3 Section 265119 LED Interior Lighting 265119-1 265119-7

DIVISION 27 COMMUNICATIONS

Section 270500 Common Work Results for Communications 270500-1 270500-4 Section 271300 Communications Backbone Cabling 271300-1 271300-10 Section 271500 Communications Horizontal Cabling 271500-1 271500-13

DMVA Project#: 42220119 010100 - 1

SECTION 010100

SUMMARY OF WORK

PART 1 – GENERAL

1.1 STIPULATIONS

A. The specifications “General Conditions of the Construction Contract”, “Special Conditions” and “Division 1 – General Requirements” form a part of this Section by this reference thereto and shall have the same force and effect as if printed herewith in full.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.3 SCOPE OF WORK, GENERAL

A. The work under this Contract shall generally consist of, but not necessarily be limited to, providing all

1.4 labor, material, devices, tools and equipment required for the complete interior renovation of a WWII-era barrak, including new restrooms, general upgrades and repairs, HVAC, plumbing and electrical work, located in Area 4 at Fort Indiantown Gap, Annville, PA, 17003 and shall be in total accordance with the specifications and drawings and subject to the terms and conditions of all other Contract Documents.

PERFORMANCE PERIOD

A. One hundred and Eighty (180) calendar days from Government granted Notice to Proceed.

1.5 WAGE SCALES

A. Wage Scales ARE REQUIRED to be paid on this Project.

1.6 QUESTIONS DURING BID PROCESS.

A. Direct all questions pertaining to the project as shown and described in the contract documents to both persons listed below.

Ms. Tina Rebuck, Procurement Specialist DMVA, State Contracting Office Bldg. 0-47, Fort Indiantown Gap Annville, PA 17003 Email: trebuck@pa.gov Ph.: 717.861.8794 Fax: 717.861.2932

DMVA Project#: 42220119 010100 - 2

Mr. Scott A. Huish, Project Manager DMVA, FTIG Training Center DPW Building 11-12 Fort Indiantown Gap Annville, PA 17003 Email: c-shuish@pa.gov Ph.: 801.718.5810

Mrs. Ana Konopitskaya, Architectural Consultant DMVA, Bureau of Design & Project Managment Building 0-10, Fort Indiantown Gap Annville, PA 17003 Email: ankonopits@pa.gov Ph.: 717.820.2101

B. Email subject line must appear as follows:

1. DMVA Project#: 42220119_ FTIG BLDG 4-101 WW2 Renovation

2. Additional information can be included thereafter.

1.7 SUBMITTALS

A. See individual Sections and “SCHEDULE OF MATERIAL SUBMITTALS (AF FORM 66)” included within the project Design Documents

B. Submittals shall be forwarded to Department of Military & Veteran’s Affairs; Division of Engineering and Architecture, Building 0-10, Fort Indiantown Gap, Annville, Pa 17003

C. Each submittal shall include the following:

1. Project number

2. Contract number

3. Related specification section

4. Contractor’s approval stamp

5. Contractors initials and date

6. Area for DMVA-BMCE review stamp

D. All submittals must be approved by the discipline responsible, DMVA-BMCE Design Professional prior to incorporation into the project.

1.8 REQUIRED WARRANTIES

A. Contractor shall provide all required warranties as outlined within the Project Design Specifications and on all included Government AF Form 66’s.

PART 2 – OUTLINE OF REQUIRED WORK

2.1 The work of this project consists of but is not necessarily limited to the following. Detailed requirements of the work are described on the pertinent specification sections and/or shown on the drawings.

DMVA Project#: 42220119 010100 - 3

A. General construction (.1)

1. Prepare and submit all necessary pre-construction documentation as outlined within the Project Design Documents.

2. Outline individual construction tasks / milestones and provide Construction Schedule that includes the work of all other Prime Contractors.

3. Mobilize.

4. Conduct all required demolition per the Project Design Documents.

5. Install, where applicable, and prepare all existing substrates and surfaces, per the Project

Design Documents, for new construction and installation of new finishes.

6. Install new underground storm drain pipe.

7. Install new partitions on the first floor.

8. Install new raised floor and reconfigure restroom on the first floor.

9. Install new floor and wall insulation.

10. Install new restroom fixtures, accessories and partitions / compartments per the Project

Design Documents.

11. Install new drywall with finishes per the Project Design Documents.

12. Install new gutters and downspouts.

13. Install new venting ridge cap and vented soffits.

14. Install new interior doors.

15. Reframe ceiling where indicated in drawings.

16. Complete Punch List items, final inspection, L&I approval and perform final cleaning.

17. Provide all required closeout documentation and training per the Project Design Documents prior to deeming/granting the project complete.

B. (HVAC – POINT 2)

project Design Documents.

2. Outline individual construction tasks/milestones.

3. Provide a new complete Variable Refrigerant HVAC system as manufactured by Trane Mitsubishi (No substitutions) including the following:

a. Outdoor Heat Pump condensing units.

b. Indoor ductless heating / cooling units

c. Lossnay energy Recovery unit with Mitsubishi concealed ducted air handling unit.

d. Provide the required manufacturer certification indicating the contractor has completed the proper manufacturer provided installation training.

4. Install all refrigerant piping, valving, insulation, hangers, et cetera for a complete installation.

5. Metal duct distribution system associated with energy recovery unit for ventilation air and toilet room exhaust, including all grilles registers and diffusers.

6. Dedicated ductless split system serving the IT/electrical room.

7. Complete Punch Lists and Final Cleaning.

8. Provide all required closeout documentation and training per the Project Design Documents prior to deeming/granting the project complete.

C. (PLUMBING – POINT 3)

project Design Documents.

DMVA Project#: 42220119 010100 - 4

2. Outline individual construction tasks/milestones.

5. Cut off existing water line above ground and extend, under the new floor, to the mechanical room.

6. Installation of new sanitary and vent piping.

7. Installation of new gas fired water heaters including gas piping and connection, and direct vent piping.

8. Relocate the gas service from one side of the door to the other.

9. Installation of new hot and cold-water piping.

10. Install all new plumbing fixtures.

11. Complete Punch Lists and Final Cleaning.

12. Provide all required closeout documentation and training per the Project Design Documents prior to deeming/granting the project complete.

D. (ELECTRICAL – POINT 4)

1. Prepare and submit all necessary pre-construction documentation as outlined within the project Design Documents.

2. Outline individual construction tasks/milestones.

3. Mobilize.

4. Conduct all required demolition per the project design documents while maintaining existing electrical service for construction power.

5. Provide temporary lighting, power, outlets, cords, etc. for all construction activities for all contractors.

6. Provide all rough-ins. This shall include conductors and/or cables.

7. Provide electrical distribution equipment and service.

8. Provide all power devices and connections.

9. Provide lighting fixtures and controls.

10. Provide all data outlets, cables, racks, patch panels and the like.

11. Provide Combination Fire Alarm and Mass Notification System (MNS) and all devices as per project documentation.

12. Complete Punch Lists and Final Cleaning.

13. Provide all required closeout documentation and training per the Project Design Documents prior to deeming/granting the project complete.

END OF SECTION 010100

DMVA Project#: 42220119 011200 - 1

SECTION 011200

COORDINATION AND CONTROL

PART 1 - GENERAL

1.1 STIPULATIONS

A. The specifications “General Conditions of the Construction Contract”, “Special Conditions” and “Division 1 – General Requirements” form a part of this Section by this reference thereto and shall have the same force and effect as if printed herewith in full.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.3 SUMMARY

A. Section includes a summary of each contract, including responsibilities for coordination and temporary facilities and controls that govern the performance of the work to complete this project.

B. Specific requirements for work of each contract are also indicated in individual Specification Sections and on Drawings.

1.4 PRIME CONTRACTS FOR CONSTRUCTION

A. Point 1 – General (Lead)

B. Point 2 – HVAC

C. Point 3 – Plumbing

D. Point 4 – Electrical

1.5 WORK HOURS

A. Regular work hours will be Monday through Friday, 7:00 am to 4:30 pm.

B. Holidays: No work will be allowed on holidays observed by the State and Federal Government.

C. Weekends: No work will be allowed on weekends.

D. Exceptions: If deemed necessary, exceptions to the above can be made. Prime Contractors must submit, in writing, justification for such an exception and approval from the Department must be obtained prior to commencement of any work.

DMVA Project#: 42220119 011200 - 2

1. Fort Indiantown Gap: Any and all work that takes place outside of the working hours as listed herein, shall be coordinated with the DMVA-FTIG Construction Manager. Contractor(s) performing work on approved dates shall submit, in writing, a list of all employees that will be on site for the days approved. This list of employees will be submitted to the Fort Indiantown Gap Police Dept. by the DMVA-FTIG Construction Manager.

1.6 COORDINATION

A. The General Contractor shall be responsible for coordination between all contracts.

1. Construction operations shall be coordinated to ensure efficient and orderly installation of each part of the work.

2. Coordinate installation of different components with other Contractors to ensure accessibility for required construction operations.

3. Make necessary provisions to accommodate items scheduled for later installation.

PART 2 - TEMPORARY FACILITIES AND EQUIPMENT

2.1 GENERAL

A. It shall be the responsibility of each Contractor to provide, maintain, and remove all facilities and equipment necessary for construction operations for individual Contracts.

1. These items include, but are not limited to:

a. Costs and use charges associated with the facility.

b. Plug-in cords, power cords, and extension cords, power tools.

c. Task lighting and special lighting necessary for construction operations.

d. Storage and fabrication structures/areas.

e. Temporary enclosures for construction activities.

f. Hoisting equipment for construction activities.

g. Waste disposal facilities, including collection and legal disposal of its own waste materials.

h. Daily cleaning of work area.

i. Secure lockup of tools, materials, and equipment.

j. Construction aids, services, and facilities necessary for individual construction activities.

2.2 FIELD OFFICES

A. CONTRACTOR TRAILERS/OFFICES

1. The Prime Contractor(s) shall provide and maintain, at their cost, a suitable office on the premises.

Trailer/offices shall be located based on the either the staging area depicted on the Project Design Documents and/or the location determined during the Pre-Construction Coordination Meeting.

The Contractor shall provide and maintain all necessary services and utilities for their respective

DMVA Project#: 42220119 011200 - 3 offices and/or trailers, to include, but not limited to; electrical services, sanitary and water services, heating and cooling, telephone/fax and internet services.

2.

B. SANITARY FACILITIES

1. Portable Toilets (Porta Johns) – Point 1 General Contractor (Lead), at their costs, shall be responsible for providing and maintaining any and all temporary toilet facilities. Toilets are to be utilized by all persons (Contractors, Sub-Contractors, DMVA Personnel, etc.) associated with the project.

a. Cleaning, Pumping and Maintenance of the portable toilets shall be the responsibility of the Point 1 General Contractor.

PART 3 - TEMPORARY SERVICES/UTILITIES DURING CONSTRUCTION

3.1 CONTRACTOR RESPONSIBILTIES

A. The General Contractor shall be responsible for all temporary heating, cooling, ventilation, power, lighting and water/sewer. This shall include, unless otherwise indicated, utility-use charges, temporary meters, and temporary connections, necessary during construction operations.

B. The designated Contractor shall install, operate, protect and maintain the respective temporary services as specified herein during the duration of the entire project.

C. Temporary connections to new and/or existing permanent service lines shall be made at locations as directed by the Department, and when the temporary service lines are no longer required, they shall be removed by the Contractor. Any part or parts of the permanent service lines, grounds and building, disturbed and damaged by the installation and/or removal of the temporary service lines, shall be restored to their original condition by the Contractor responsible for the temporary installation.

D. If the Contractor fails to carry out its responsibility in supplying temporary services as set forth in this contract it is responsible for such failure and the Department may take such action as it deems proper for the protection and conduct of the work and shall deduct the cost involved from the amount due the Contractor. Only those temporary utilities required for construction need to be extended to the work area(s).

3.2 INTERRUPTION OF SERVICES

A. Each Prime Contractor shall have all needed equipment and material to complete planned work at the site prior to shutting down any system.

B. No additional compensation or time will be given to the Contractor if work must be performed on State or National Holidays or on weekends or on overtime. See Paragraph 1.4 on ‘Working Hours’.

3.3 WELDING

A. Any Contractor using electrical power for welding on the site shall use self-contained engine generating units.

DMVA Project#: 42220119 011200 - 4

3.4 FIRE EXTINGUISHERS

A. Each Contractor shall provide UL listed, NFPA approved fire extinguishers (ten (10) lb. minimum) at the construction site during operations, suitable for all types of fires in accordance with OSHA.

PART 4 - RESTORATION AND REPAIRS

4.1 RESTORATION

A. All restoration required due to contract operations, shall be the responsibility of each individual Contractor for their location/area of operation, at no expense to the Department.

4.2 REPAIRS

A. Each individual Contractor shall be responsible for any and all repairs to work areas, to include repairs to both existing finishes and completed work.

B. Individual Contractors will not be responsible for damages resulting from on-going work, neglect and/or carelessness of other contractors and/or their associated sub-contractors. Parties responsible for any damages, no matter the circumstances, will be required to repair all damages at no expense to the Department.

C.

END OF SECTION 011200

DMVA Project#: 42220119 013100 - 1

SECTION 013100

SEQUENCE OF CONSTRUCTION AND MILESTONES

Part 1 GENERAL

1.1 STIPULATIONS

A. The specifications “General Conditions of the Construction Contract”, “Special Conditions” and “Division 1 – General Requirements” form a part of this Section by this reference thereto and shall have the same force and effect as if printed herewith in full.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.3 GENERAL REQUIREMENTS

A. Before beginning work, the Contractor will be required to prepare a schedule in consultation with the Department. The work must be carried out in full accordance with the schedule. The Contractor shall arrange without any unnecessary interference with the Institution’s operation.

1.4 CRITICAL MATERIALS AND EQUIPMENT

A. The Contractor is cautioned that all necessary and required critical materials and equipment shall be ordered as quickly as possible, in order that the shipping will not delay the progress of the work or completion of the project.

1.5 CRITICIAL ITEMS TO BE NOTED AS MILESTONES

A. Refer to the General Conditions regarding construction progress Milestones to be established by the Lead Contractor.

B. The Lead Contractor shall submit a construction schedule, for the total project, including all prime contractors critical path work items. The schedule shall be submitted at the pre-construction meeting.

The schedule will be reviewed and approved by the designer and the using agency to confirm compliance with construction sequencing and Using Agency training schedule.

1. GENERAL CONSTRUCTION (.1)

1) Submittals

2) Mobilization

3) Initial Job Conference

DMVA Project#: 42220119 013100 - 2

4) Site Clearing and E&S Measures

5) Excavation – Drain

6) Rough grading

7) Structural floor sheathing

8) Interior Walls - Metal Studs and gypsum board installation

9) Insulation - Interior walls and 1st floor

10) Raised floor in restroom

11) Tile and wall covering

12) Toilet partitions, fixtures and accessories

13) Ceiling installation

14) Doors & windows - interior (incl. hardware)

15) Painting - interior

16) Flooring - carpet, VCT & wall base

17) Cabinetry, T.R. Accessories, FE Cabinets

18) Final grading, seeding

19) Final cleaning, punch list items, close-out documents

2. HVAC (.2)

a. Construction Sequencing

1) Submittals

2) Mobilization

3) Concrete Pads

4) Metal Ductwork

5) Duct Insulation

6) Duct Accessories & VVT System

7) Diffusers and Grilles

8) Power Ventilators & Louver

9) Wall unit Heaters

10) Instrumentation and Controls

11) Air handlers & Condenser Units

12) Duct Furnace & Vents

13) Testing, Adjusting & Balancing

14) Interior Gas Lines & Valves

15) Exterior Gas Lines & Regulator

16) Excavation & Backfill for Gas Line

3. PLUMBING (.3)

a. Construction Sequencing

1) Submittals

2) Mobilization

3) Excavations & Installation of Sanitary Waste

4) Indoor Sanitary Waste and Vent Line Installation

5) Plumbing Fixtures Installation and Rough-Ins

6) Indoor Domestic Water Line installation and related Insulation

7) Installation of Tankless water heater and Venting

8) Excavation & Installation of Domestic Water Service

9) Testing and Adjusting

10) Final Cleaning, Puch List Items, Close-Out Documents

4. ELECTRICAL (.4)

a. Construction Sequencing

1) Submittals

2) Mobilization

DMVA Project#: 42220119 013100 - 3

3) Underground Rough-Ins to include trenching

4) Ground Counterpoise and Ring

5) Trench backfill, tamping up to rough-grade.

6) Panel Rough-Ins

7) Branch Circuit Rough-Ins

8) Telecom Rough-Ins.

9) Branch Circuit Wiring

10) Telecom wiring and testing

11) Installation of Lighting

12) Installation of devices and outlets

13) Telecom Cable, Boxes and Outlets

14) Telecom testing and reports.

15) Fire Alarm / MNS installation, testing, programming, and trouble shooting and

Training.

16) Testing, Adjusting, Corrections, and Re-testing.

17) Final Connections

18) Final Cleaning, Punchlist Items, and Close-Out Documentation.

END OF SECTION 013100

DMVA Project#: 42220119 013000 - 1

SECTION 013000

SUBMITTALS

Part 1 GENERAL

A. The specifications “General Conditions of the Construction Contract”, “Special Conditions” and “Division 1 – General Requirements” form a part of this Section by this reference thereto and shall have the same force and effect as if printed herewith in full.

1.2 RELATED DOCUMENTS

A. Drawings and general provision of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.3 SUMMARY

A. Included in this section of the specifications is a list of approvals required for all materials incorporated into the project. The Department reserves the right to require additional approvals if necessary. No material, equipment or supplies listed herein shall be incorporated into the work until the Contractor has obtained prior approval from the Department.

B. Submittals required by each prime contract are indicated within AF Form 66 “Schedule of Material Submittals” attached to the end of Section 01300.

1.4 SUBMITTAL PROCEDURES

A. Refer to ‘Submittals’ of the General Conditions.

B. Comply with the following or resubmission will be required:

1. Indicate contract number, specification section and building number (as shown on the drawings) on each item submitted.

2. Signify approval by stamp, initialing and dating each item prior to submission to the Professional.

C. Items requiring testing shall be forwarded directly to the approved laboratory. The Contractor shall pay all costs associated with testing.

D. Expedite critical materials, equipment and shop drawings, and other required submissions.

E. Incomplete submissions will be returned for resubmission.

F. Use of substitutions for materials or details shown on the contract drawings or called for in these specifications require written approval from the Department. See General Conditions.

1.5 PRODUCT DATA

DMVA Project#: 42220119 013000 - 2

A. Manufacturer's printed directions and manufacturer's standard specifications showing all dimensions, cuts, finishes, etc., as well as catalog cuts and ratings of all material will be required and shall be submitted in advance prior to application and/or installation.

1.6 TESTS

A. Refer to ‘Tests’ of the General Conditions.

B. Submit required reports listing items tested, tests conducted and results obtained as specified.

1.7 CERTIFICATIONS

A. Submit required certifications in written form identifying authorized representative, manufacturer, systems designer and other required data as specified.

1.8 WARRANTIES

A. Refer to Specifications for required warranties. Copies of proposed warranties specified for products shall accompany the designated submittal of that product.

1.9 OPERATION AND MAINTENANCE MANUALS

A. Manual Format (Use 3-ring binder):

1. Title page with the following information for each system covered:

a. Project Title and DMVA Contract Number (in capital letters)

b. Name of Company

c. Name of the individual to be called

d. Normal telephone numbers

e. Contractor's account number for project

2. Index listing all sections of the Manual.

3. Warranties for equipment furnished in contract. (Index tabbed)

4. Complete system circuit diagrams, block diagrams, copies of all approved shop drawings, which shall clearly illustrate how all the components relate and how they are interconnected and a point wiring diagram.

5. Reports, testing analysis.

6. Operating instructions and maintenance instructions for all equipment and finish materials furnished.

1.10 SUBMITTALS LIST

A. See attached AF FORM 66 “Schedule of Material Submittals” organized by prime contract.

END OF SECTION 013000

SCHEDULE OF MATERIAL SUBMITTALS

(.1 GENERAL)

PROJECT NUMBER

DMVA 42220119

PROJECT TITLE

FTIG BLDG 4-101 WW2

Renovation

TO BE COMPLETED BY PROJECT ARCHITECT

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF

ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(DWG’s.) SPEC SECTION

NUMBER OF COPIES REQUIRED

EQ

U

IR

ED

S

U B

M

IS

SI

O

N

D A

TE

P

R

IO

R T

O

IN

ST

LL

TE

R

EC

EI

V

ED

IN

C

N

TR

A

CT

G

TE

T O

C

IV

IL

EN

IN

EE

R

ET

U R

N S

U

SP

EN

SE

D

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

A

CT

ES

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V

L

REMARKS

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

CE

SH

P D

R A

W

IN

G S

SA

M

PL

LO

R

S

EL

EC

TI

M

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TY

TA

LO

G D

TA

S-

B U

IL

T

D R

A W

IN

G

S

O

M M

A N

U

LS

PE

R A

TI

O

N S

D

EM

O N

ST

R

A

TI

APPROVED

DIS-

033000 Rebar & WWF X X

033000 Concrete/Mix Designs X X

061000 Rough Carpentry X X X

061053 Misc. Rough Carpentry X X

061600 Sheathing X X X X

072100 Thermal Insulation X X X X X

072101 Spray Foam Insulation X X X X X

062023 Interior Finish Carpentry X X X

077100 Gutters and Downspouts X X X X X X X

074600 Vinyl Soffit X X X X X X X X

081113 Hollow Mtl Doors/Frames X X X X X X X

081416 Flush Wood Doors X X X X X X X

087111 Door Hardware X X X X X X

0992216 N.S. Mtl Framing X X X X X

(POINT 1 - GENERAL)

DMVA 42230136

Building 16-153 Renovation

TO BE COMPLETED BY PROJECT ENGINEER

N

E N

U M

EQ

U

IR

ED

S

U B

M

IS

SI

TE

P

R

IO

R T

O

IN

ST

TE

R

EC

EI

V

N

TR

A

CT

TE

T

IN

EE

R

U R

N S

U

SP

EN

SE

D

M

IT

TA

L

N U

M B

NOTIFIED

C O

N

TR

A

CT

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

P D

R A

W

IN

G S

SA

M

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TA

LO

G D

B U

IL

T

D R

A W

IN

G

S

O

M M

A N

U

R A

TI

O

N S

D

EM

O N

ST

R

A

TI

092900 Gypsum Board X X X X

095123 Ac. Ceiling Tile X X X X X X X

096513 Resilient Base X X X X X X X

096516 Resilient Sheet Flooring X X X X X X X

096516 Resilient Floor Tile X X X X X X X

096816 Sheet Carpet X X X X X X X

097200 Wall Coverings X X X X X X X

099123 Interior Primer & Paint X X X X X X X

102113 Toilet Compartments X X X X X X X X

102800 Toilet Accessories - All X X X X X X

104413 Fire Ext. Cabinets X X X X X X

104416 Fire Extinguishers X X X X X

123530 Casework X X X X X X X X

123623.13 Laminate Countertops X X X X X X X X X

(POINT 1 - GENERAL)

DMVA 42230136

Building 16-153 Renovation

TO BE COMPLETED BY PROJECT ENGINEER

N

E N

U M

EQ

U

IR

ED

S

U B

M

IS

SI

TE

P

R

IO

R T

O

IN

ST

TE

R

EC

EI

V

N

TR

A

CT

TE

T O

C

IV

IL

IN

EE

R

U R

N S

U

SP

EN

SE

D

M

IT

TA

L

N U

M B

NOTIFIED

C O

N

TR

A

CT

O R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

V

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

P D

R A

W

IN

G S

SA

M

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TA

LO

G D

B U

IL

T

D R

A W

IN

G

S

O

M M

A N

U

R A

TI

O

N S

D

EM

O N

ST

R

A

TI

096519 Liquid Membrane Substrate X X X X X X

096513 Stair treads and risers X X X X X X X X X

096513 Transition Strip X X X X X X X

As-Built dwgs, CAD

X

DMVA Project#: 42220119 FTIG BLDG 4-101 WW2 Renovation AF Form 66

SCHEDULE OF MATERIAL SUBMITTALS

PLUMBING (.3)

FED. PROJECT #

DMVA/BMCE-

42220119

PROJECT TITLE

Building 04-101

D.G.S PROJECT NUMBER:

N/A

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF

ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

TE

R

EC

EI

V

N

TR

A

CT

TE

T

O M

EC

H

A N

IC

IN

EE

R

U R

N S

U

SP

EN

SE

D

M

IT

TA

L

N U

M B

ER

S

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

A

CT

O R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

ST

EE

L C

ER

TI

FI

C

A

TE

O F

C O

M

PL

IA

P D

R A

W

IN

G S

SC

H

ED

U

LE

S

C O

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TA

LO

G D

R A

TI

ST

R U

C

TI

O

EP

O

TS

EL

EG

A

TE

D

D

ES

IG

1 221110 – Plumbing Insulation 5 NTP

+30 A,B

2 221110 – Domestic Water Piping 5 NTP

+30 A,B

221110 – Domestic Water Piping Valves and Specialties (balancing, check, ball, arresters)

5 NTP

+30 A,B

4 221110 – Sanitary Waste and Vent Piping 5 NTP

+30 A,B

221310 – Sanitary Waste Piping Specialties (floor drains, cleanouts)

5 NTP

+30 A,B

7 223400 –Gas Fired Water Heaters x 5 x x NTP

+30 A,B

224000 – Plumbing Fixtures (water closets, flush valves, toilet seats, etc.)

x 5 x NTP +30 A,B

224000 – Plumbing Fixtures (urinals, flush valves, supports, etc.)

x 5 x NTP +30 A,B

224000 – Plumbing Fixtures (lavatories, faucets, supports, shielding guards, etc.)

x 5 x NTP +30 A,B

11 224000 – Plumbing Fixtures (lavatory, faucets, etc.) x 5 x NTP

+30 A,B

12 224000 – Plumbing Fixtures (mop receptor, faucet, etc.) x 5 x NTP

+30 A,B

13 224000 – Plumbing Fixtures (Shower, accessories, etc.)

FTIG BLDG 4-101 WW2 Renovation AF Form 66

SCHEDULE OF MATERIAL SUBMITTALS

PLUMBING (.3)

FED. PROJECT #

DMVA/BMCE-

42220119

PROJECT TITLE

Building 04-101

D.G.S PROJECT NUMBER:

N/A

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF

ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

TE

R

EC

EI

V

N

TR

A

CT

TE

T

O M

EC

H

A N

IC

IN

EE

R

U R

N S

U

SP

EN

SE

D

M

IT

TA

L

N U

M B

ER

S

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

A

CT

O R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

ST

EE

L C

ER

TI

FI

C

A

TE

O F

C O

M

PL

IA

P D

R A

W

IN

G S

SC

H

ED

U

LE

S

C O

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

RE

R

S W

A R

R A

TA

LO

G D

R A

TI

R U

C

TI

O

EP

O

EL

EG

A

TE

D

D

ES

IG

14 Various – O&M Manuals 2 A,B

15 017839 – Hard Copy of As- Built Drawings 3 A,B

017839 – CDRom of As- Built Drawings in AutoCAD format

2 A,B

A. No deviations, substitutions or changes of materials, to be incorporated into this project, shall be made after approval by the Department, except for written direction by and the approval of the manufacturer of a specific item and re-approval by the Department.

B. The Department retains the right to require additional items not specifically denoted to be submitted for approval and/or additional clarification.

DMVA FORM 66, OCT 08 (EF) PREVIOUS EDITION IS OBSOLETE Page 1 of 2

Electrical Submittals *

PROJECT NUMBER

DMVA 42220119

PROJECT TITLE

FTIG Bldg 4-101 WW2 Renovation

IT

EM

N U

M

REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

V

N

TR

A

CT

TE

T O

E N

G

IN

EE

R

D

A R

C H

IT

EC

TU

R

E D

A

TE

T O

C O

N

TR

A C

TI

FR

M E

NOTIFIED

RESUBMITTAL

REMARKS

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

P D

R A

W

IN

G S

SA

M

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S M

A N

U

FA

C

TU

RE

R

S

W A

R R

A

TA

LO

G D

R A

TI

N

G

IN

ST

R

U

CT

IO

N

S

R

EP

O

TC

H

S

PS

EE

L C

ER

TI

FI

C

A

TI

O N

S

D A

TE

O

F R

ES

U

BM

IT

TA

TO

N

TR

A

CT

TE

O F

R

ES

U

BM

IT

TA

E&

TE

O

F R

ES

U

BM

IT

TA

LT

N

TR

A

CT

IN

G

F R

O M

E

TE

O

F

FI

N A

L A

PP

R

O V

A L

A C

C

EP

C

EP

TE

D

A S

N O

EV

IS

E

U

BM

IT

T A

C C

EP

260500 – Common Work Results for Electrical, Vibration Isolators

5 5 NTP

+10

260500 – Common Work Results for Electrical, Access Panels

5 5 NTP

+10

260500 – Common Work Results for Electrical, Concrete

5 NTP

+10

260519 – Low-Voltage Electrical Power Conductors & Cables, Conductors and Cables, and Connectors & Splices

5 NTP

+10

260526 – Grounding & Bonding for Electrical Systems, Grounding Conductors, Connectors, Grounding Electrodes, & Conduit Ground Bushings

5 NTP

+10

260529 – Hangers & Supports for Electrical Systems, Support, Anchorage & Attachment Components

5 5 NTP

+10

260533 – Raceway and Boxes for Electrical Systems, Metal Conduit and Tubing

5 5 NTP

+10

260533 – Raceway and Boxes for Electrical Systems, Boxes, Enclosures, Cabinets, and Sleeves for Raceway

5 5 NTP

+10

260553 – Identification for Electrical Systems, Identification Materials

5 NTP

+10

10 260573 – Overcurrent Protective Device Coordination Study 5 NTP

+30 Submit after coordination with all distribution equipment.

11 262416 – Panelboards 5 5 5 NTP +30

Submit after coordination with Overcurrent Protective Device Coordination Study

12 262726 – Wiring Devices 5 NTP +10

DMVA FORM 66, OCT 08 (EF) PREVIOUS EDITION IS OBSOLETE Page 2 of 2

Electrical Submittals *

PROJECT NUMBER

DMVA 42220119

PROJECT TITLE

FTIG Bldg 4-101 WW2 Renovation

IT

EM

N U

M

REFERENCE, TYPE OF

SUBMITTAL

NUMBER OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

R

EC

EI

V

N

TR

A

CT

TE

T O

E N

G

IN

EE

R

D

A R

C H

IT

EC

TU

R

E D

A

TE

T O

C O

N

TR

A C

TI

FR

M E

NOTIFIED

RESUBMITTAL

REMARKS

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

P D

R A

W

IN

G S

SA

M

LO

R

S

EL

EC

TI

N U

FA

C

TU

RE

R

S R

EC

O

M M

EN

D

A

TI

O N

S M

A N

U

FA

C

TU

RE

R

S

W A

R R

A

TA

LO

G D

R A

TI

N

G

IN

ST

R

U

CT

IO

N

S

R

EP

O

TC

H

S

PS

EE

L C

ER

TI

FI

C

A

TI

O N

S

D A

TE

O

F R

ES

U

BM

IT

TA

N

TR

A

CT

TE

O F

R

ES

U

BM

IT

TA

E&

TE

O

F R

ES

U

BM

IT

TA

LT

N

TR

A

CT

IN

G

F R

O M

E

TE

O

F

FI

N A

L A

PP

R

O V

A L

A C

C

EP

C

EP

TE

D

A S

N O

EV

IS

E

U

BM

IT

T A

C C

EP

13 262813 – Fuses 5 5 NTP +30

Submit after coordination with Overcurrent Protective Device Coordination Study

14 262913 – Enclosed Controllers 5 5 5 5 NTP +30

Submit after coordination with Overcurrent Protective Device Coordination Study

15 265100 – Interior Lighting 5 5 5 NTP +10

270500 – Common Work for Communications, Sleeves and Sleeve Seals

5 5 NTP

+10

271300 – Communications Equipment Room Fittings, Equipment Frames and Grounding, Cable, Connectors, etc.

5 5 5 NTP

+10

18 283111 – Digital, Addressable Fire Alarm System 5 5 5 NTP

+10

* NOTE: This form is provided for contract compliance and does not alleviate any requirements stated in the specifications. “NTP” – Notice to Proceed. Combine submittals where appropriate, line items are shown for control only.

FTIG BLDG 4-101 WW2 Renovation 014000 - 1

SECTION 014000

QUALITY CONTROL TESTING SERVICES

PART 1 - GENERAL

A. The specifications sections, "General Conditions of the Construction Contract", "Special Conditions", and "Division 1 - General Requirements" form a part of this Section by this reference thereto, and shall have the same force and effect as if printed herewith in full.

1.2 GENERAL

A. The Contractor is responsible for verifying and enforcing compliance with all requirements of the

Contract Documents. Contractor's responsibility includes, but is not limited to, the following:

1. Supervision of field work to enforce contract compliance of all construction activity.

2. Verification of compliance with plans and specifications of all manufactured materials or equipment. Provide certificates of compliance, or other approved proof of compliance, by the manufacturers and submit to the Professional.

3. Performance of all necessary field measurements and/or inspections to verify compliance with requirements of the plans or specifications requiring adherence to measurable standards of field performance.

4. Engaging an independent testing laboratory to perform tests and inspections as required by this specification section, hereafter referred to as Quality Control Testing and Inspection Services or Quality Control Testing Services.

5. Providing support services for all Quality Control Services, including cutting and patching and repair or replacement as required.

B. Work not included: Quality Assurance Services by The Department of General Services and Asset

Management are specified in Section 014010. The Department of General Services and Asset Management reserves the right to perform tests under the Quality Assurance Testing program and to use those as the basis for approval or rejection at its sole discretion.

1.3 DESCRIPTION OF QUALITY CONTROL TESTING

A. Quality Control Services include inspections, tests and reports by an independent testing laboratory or other approved agency, hereafter referred to as the Quality Control Agency. All Quality Control Services shall be at the Contractor's cost, which shall be included proportionally in all items of payment or contained in any Base Bid or Unit Price on the Proposal. Tests and Inspections are to include those specifically required by this section and within technical sections of the Project Manual.

B. The Quality Control Agent shall submit a Testing and Inspection Plan to the Professional for its approval, and the approval of the Quality Assurance agent for all tests and inspections required by this section and within technical sections of the Project Manual.

C. Quality Control Services by a Quality Control Agency or Agencies is intended to assist in the determination of probable compliance of the work with requirements specified or indicated and do not relieve the Contractor of the responsibility for compliance with Contract Document requirements.

D. Specific testing or inspections of a structural nature required to be performed by independent Quality

Control Agencies for individual construction activities are specified in this Section only.

FTIG BLDG 4-101 WW2 Renovation 014000 - 2

If testing or inspection requirements appear in this section and a technical section, the most stringent requirements shall prevail. If Quality Control Testing or Inspection is specified in a technical section and not in this section, it shall be required as if specified in this section. Non- structural tests and inspections are in the technical specifications.

E. Inspections, tests and related actions specified are not intended to limit the Contractor's quality control procedures that facilitate compliance with Contract Documents requirements.

F. Quality Control Services required by the local municipality or other governing authorities are the responsibility of the Contractor, regardless of whether or not specified hereinafter or in the applicable specification section.

G. Each prime Contractor will pay for all costs in connection with its Quality Control Services.

Whenever the word "Contractor" is used it shall be interpreted to mean Prime Contractor or Contractors as applicable. All Contractors performing work for which testing or inspection is required by this section are required to perform said tests/inspections appropriate for the quantity of work performed as indicated by this specification section and as required by all Contract Documents.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 RESPONSIBILITIES AND DUTIES OF CONTRACTOR

A. The Contractor shall engage Quality Control Agencies to provide all Quality Control Services required to comply with the Contract Documents. These services shall be at no cost to the The Department of General Services and Asset Management

B. The Contractor is responsible for retesting where results of required inspections, tests or similar services prove unsatisfactory and indicate non-compliance with Contract Document requirements. Likewise, the Contractor is responsible for retesting when the The Department of General Services and Asset Management Quality Assurance Test results prove unsatisfactory. If Quality Assurance Tests were in error, the Contractor shall be reimbursed for his retesting costs.

C. Cost of retesting construction revised or replaced by the Contractor is the Contractor's responsibility.

D. Provide the Quality Control Agency with preliminary representative samples of materials to be tested in quantities requested. If the source, quality or characteristics of an approved material changes or indicates lack of compliance with Contract requirements, submit additional samples of materials to the Quality Control Agency.

E. When requested by the Professional, The Department of General Services and Asset Management , or the Quality Control Agency, the Contractor shall immediately provide reports, cutting lists, material bills, shipping bills, time and place of shipment of materials to shop and field and any relevant data on previous testing and investigations of materials.

F. Provide casual labor and facilities:

1. To provide access to the work inspected or tested by any authorized party.

2. To obtain and handle samples at the site.

3. To facilitate inspections and tests by the Quality Control Agency or Quality Assurance

FTIG BLDG 4-101 WW2 Renovation 014000 - 3

Agency.

4. For security and protection of samples and test equipment at the project site.

G. To facilitate the timely sequence of inspection and testing, the Contractor shall give advanced notification to the Quality Control Agency and the Department that work has progressed to a point where inspection and testing may proceed.

H. Contractor shall pay for additional cost of Quality Control Agency services which, in the opinion of the

Professional and the Department, are required because of the following:

1. Failure of materials or workmanship to meet Contract requirements.

2. Materials or practices not complying with the technical specifications which could possibly result in defective and unacceptable work.

3. Changes in source, quality or characteristics of materials.

4. Site cured concrete cylinders requested by the Contractor.

I. The Quality Control Agency shall submit a certified written report of each inspection, test or similar service to the Design Professional, the Quality Assurance Agent, the Bureau of Construction Regional Director, Project Manager and Assistant Project Manager, and the Contractor, with additional copies directly to any governing authority when that authority so directs. All reports shall be uploader to e-Builder within 24 hours of when the inspection occurs, test is conducted, test results obtained or similar service was conducted.

J. Report Data: Written reports of each inspection, test or similar service shall include, but not be limited to:

1. Date of issue.

2. Project title and number.

3. Name, address and telephone number of testing agency.

4. Dates and location of samples and tests or inspections.

5. Names of individuals making the inspection or test.

6. Designation of the Work and test method.

7. Identification of product and specification section.

8. Complete inspection or test data.

9. Test results and an interpretation of test results.

10. Ambient conditions at the time of sample taking and testing.

11. Comments or professional opinion as to whether inspected or tested work complies with Contract

Document requirements.

12. Name and signature of Quality Control Agency inspector.

K. The QC Agent shall cooperate in using standard forms/procedures developed by the

Department that assist in accomplishing the tasks required.

L. Engage independent testing laboratories, whose employees assigned to the Project and tests performed comply with ASTM E 329, Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction. The testing laboratory must be accredited and audited by a qualified national authority. The Contractor is to submit the name and credentials of the proposed QC Agent to the Design Professional andThe Department of General Services and Asset Management for acceptance.

M. Upon completion of inspection, testing, sample taking and similar activities, repair the damaged work and restore substrates and finishes to eliminate deficiencies, including deficiencies in the visual qualities of exposed finishes. Comply with the Contract Document requirements for “Cutting and Patching". Protect work exposed by or for Quality Control Testing activities, and protect repaired work.

FTIG BLDG 4-101 WW2 Renovation 014000 - 4

N. All required testing/inspection, including that stated in the body of the technical specification sections (be it referenced in the technical specifications as "Quality Control", "Quality Assurance", or any other referenced testing and/or inspection) shall be performed by the Contractor, unless it explicitly states it shall be performed by the Department. If stated to be performed by the Department, the Contractor shall still be required to perform all necessary testing/inspection in advance of The Department of General Services and Asset Management to assure the work meets all the requirement of the contract documents.

O. Contractor shall coordinate closely with The Department of General Services and Asset Management , the Professional and the Professional's QA Consultants so that any required or desired QA testing can be performed concurrently or immediately after the Contractor's QC testing.

3.2 RESPONSIBILITIES AND DUTIES OF QUALITY CONTROL AGENCIES

A. Quality Control Agencies engaged to perform inspections, sampling and testing of materials and construction shall cooperate with the Professional, the Quality Assurance Agent, the Department, the Department of Labor and Industry, and the Contractor in performance of its duties, and shall provide qualified personnel to perform required inspections and tests. If it is determined by The Department of General Services and Asset Management that the personnel provided are not qualified or are not working in the best interests of the Project for the tests performed, the Contractor, through their Quality Control Agent, shall immediately replace or supplement the subject personnel.

B. Quality Control Agencies shall notify the Department, the Quality Assurance Agent, the

Professional, and the Contractor immediately of irregularities or deficiencies observed in the Work during performance of its services.

3.3 QUALITY CONTROL SERVICES TO BE PERFORMED

A. Testing and inspections by the Quality Control Agency or Agencies shall include, but are not limited to, the following list.

LIST OF TESTS AND INSPECTIONS

DESCRIPTION OF TEST OR INSPECTION REFERENCED

STANDARD

QUANTITY OR

FREQUENCY

BITUMINOUS PAVEMENT

Bulk Specific Gravity…of Compacted Bituminous Mixtures…

ASTM D1188 or D 2726

1 test

Density of Bituminous Concrete in Place by Nuclear Method

ASTM D2950 6 tests/1000sy paving

Thickness or Height of Compacted Bituminous Paving Mixture Specimens

ASTM D3549 3 tests/1000sy paving

CONSTRUCTION DOCUMENTS 1-28-2025

FTIG BLDG 4-101 WW2 Renovation 014000 - 5

DESCRIPTION OF TEST OR INSPECTION REFERENCED

STANDARD

QUANTITY OR

EARTHWORK1

Laboratory Compaction Characteristics of Soil Using Modified Effort

ASTM D1557 One for each type and variation of cohesive soil to be compacted

Laboratory Compaction Characteristics of Soil Using Standard Effort

ASTM D698

One for each type and variation of cohesive soil to be compacted

Density of Soil and Soil-Aggregate In Place by Nuclear Methods

ASTM D6938 As often as required to ensure contract compliance

Inspect and comment on suitability of subgrades. Test footing excavations and paving subgrades regardless if it is native material or fill and record resultant foundation bearing capacity or compaction results as applicable.

N/A

As often as required to ensure the minimum required bearing capacity is present. Bearing Capacity tests must be witnessed and/or reviewed by The Department of General Services and Asset Management, Professional, Professional's Geotechnical Engineer or QA Agent.

Verify use of proper materials, densities and lift thicknesses during placement and compaction of compacted fill.

ASTM D6938 Continuous

CONCRETE