AD1 T 501.pdf
PDF 483 KB Posted
- Solicitation number
- 419151DH_IFB
- Issued by
-
Department of Energy Office of Science
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2"x1"x1/4" THICK FLATBAR
SAMPLING LINE BRACKET
1/4"
TYP.
INLET/OUTLET PIPE
3/8" 1 1/4" 3/8"
1/4"Ø PRE-DRILLED
HOLES, TYP. OF 2
1/4"Ø RUBBER-COATED
STAINLESS STEEL U-
BOLT (3/4x1-3/4), NUTS, AND WASHERS
NOTES:
1. CONTRACTOR SHALL COORDINATE WITH
ENGINEER FOR FINAL LOCATION OF BRACKETS.
2. BRACKETS SHALL BE INSTALLED EVERY 8' - 0"
ON CENTER.
1" 1/4
3. CONTRACTOR SHALL INSTALL HEAT TRACE AND
PIPE INSULATION AROUND SAMPLE AND SENSING
LINES AS SPECIFIED.
4. DETAIL IS TYPICAL FOR BOTH SAMPLE AND
SENSING LINES. PROVIDE BRACKETS FOR EACH
ACCORDINGLY.
1/4"
TYP.
EXISTING 12"Ø STEEL INLET/OUTLET PIPE
EXISTING 12"Ø C.L.D.I.
INLET/OUTLET PIPE
EXISTING 12"Ø STEEL
INLET/OUTLET PIPE
NEW 6"x6"x1/4" THICK ANGLE, TYP. OF 2
NEW 6"x6"x1/4" THICK
ANGLE, 36" LONG, TYP. OF 2
NEW 12 GAUGE 1-1/2" x 1-7/8"
STAINLESS STEEL CHANNEL, TYP.
OF 2
STAINLESS STEEL
HARDWARE AS REQUIRED
NEW 12 GAUGE 1-1/2"x1-7/8", 50" LONG
STAINLESS STEEL CHANNEL, TYP. OF 2
NOTES:
1. PIPE INSULATION NOT SHOWN FOR CLARITY.
2. SAMPLE STATION ENCLOSURE NOT SHOWN
FOR CLARITY.
3. CONTRACTOR SHALL COORDINATE WITH
ENGINEER FOR FINAL LOCATION OF BRACKETS.
architects engineers
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com
SHEET No.
SHEET TITLE
"ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
PROFESSIONAL IS ILLEGAL"
REVIEWED BY:DRAWN BY:DESIGNED BY:
PROJECT No: DATE:
CHECKED BY:
CONSULTANTS:
Q
CONTRACT
CLIENT
STATUS
SCALE:
AS SHOWN
DRAWING No.
OF9/
/2
:4 3:
P
M C
:\U se rs \a m an fre di
\D oc um en ts \B
N
LO
_C en tra l2
1_ Pa in tin g C on tra ct _a m an fre di
BR
6C
B.
rv t
T 501
FINAL BID DOCUMENT
Painting of New 500,000 Gallon Water Tower
Brookhaven National Laboratory
AMT
AUGUST 2022BNLO1804
AMM
Upton Road, Upton, New York 11973
TANK DETAILS
MARK DATE DESCRIPTION
1 09/2022 Addendum 1
SCALE: 6" = 1'-0"1 Sample Line/Pressure Sensing Bracket Detail
SCALE: 3/4" = 1'-0"2 Sample Station Bracket Detail
| Sheets |
| G 001 - PROJECT SHEET LIST AND GENERAL NOTES |
| T 001 - GENERAL NOTES, ELEVATION, AND ISOMETRIC |
| T 500 - TANK DETAILS |
| T 501 - TANK DETAILS |
| 2022-09-16T08:14:06-0400 | |
| JJT PE Stamp |
File details come from the government source that posted it. Updated .