SCDHS Sampling Requirements BNLO1804 Tank Painting Contract
Location Description Sets Requirements 12" Tank Inlet / Outlet Site Water Main Piping
Bacteria Samples 2 Sets to be consecutive and a minimum of 24 hours apart.
Tank Bowl Bacteria Time Series 2
Fill the tank, let it sit overnight, open the drain valve to waste, collect samples at the following time intervals:
2-minutes 30-minutes 60-minutes Sets to be consecutive and a minimum of 24 hours apart.
Tank Bowl POCs 1 Collect with the initial Bacteria Time Series at the 30-minutes mark.
Tank Bowl IOCs 1 Collect with the initial Bacteria Time Series at the 30-minutes mark.
Tank Bowl PFAS 1
Requested by the owner:
Collect with the initial Bacteria Time Series at the 30-minutes mark. Must adhere to EPA methods 533 and 537.1.
\\h2m.com\shares\projects\BNLO (Brookhaven National Lab)\BNLO1804 - New 500K Elevated Storage Tank\02-Specs\Painting\3.3 Appendix B SCDHS Sampling Requirements