architects engineers
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com
SHEET No.
SHEET TITLE
"ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
PROFESSIONAL IS ILLEGAL"
REVIEWED BY:DRAWN BY:DESIGNED BY:
PROJECT No: DATE:
CHECKED BY:
CONSULTANTS:
Q
CONTRACT
CLIENT
STATUS
SCALE:
AS SHOWN
DRAWING No.
OF9/
/2
:4 2:
P
M C
:\U se rs \a m an fre di
\D oc um en ts \B
N
LO
_C en tra l2
1_ Pa in tin g C on tra ct _a m an fre di
BR
6C
B.
rv t
G 001
FINAL BID DOCUMENT
Painting of New 500,000 Gallon Water Tower
Brookhaven National Laboratory
AMT
AUGUST 2022BNLO1804
JEK
Upton Road, Upton, New York 11973
PROJECT SHEET LIST AND
GENERAL NOTES
CONTRACT P - PAINTING
GENERAL CONSTRUCTION AND PROJECT NOTES:
1. CONTRACTOR SHALL INSPECT THE CONSTRUCTION SITE PRIOR TO SUBMISSION OF BIDS AND SHALL MAKE NO ADDITIONAL
CLAIMS REGARDING SITE CONDITIONS THEREAFTER.
2. CONTRACTOR SHALL NOTIFY THE OWNER AND H2M ARCHITECTS + ENGINEERS (TELEPHONE 631-756-8000) AT LEAST 24
HOURS PRIOR TO THE COMMENCEMENT OF THE WORK. THE SAME NOTICE SHALL BE REQUIRED WHEN RESUMING WORK
AFTER ANY STOPPAGE OR DELAY.
3. LOCATION OF ALL UNDERGROUND UTILITIES, ELECTRIC AND TELEPHONE CONDUITS, STORM DRAINS AND UNDERGROUND PIPING WERE OBTAINED FROM EITHER OLD MAPS, SURVEYS, DRAWINGS AND RECORDS SUPPLIED BY OTHERS. THE OWNER AND ENGINEER DO NOT GUARANTEE OR ACCEPT RESPONSIBILITY FOR ANY DAMAGE TO SUCH FACILITIES DUE TO DISCREPANCIES IN LOCATION AND SIZE SHOWN ON THE PLANS, NOR WILL ANY COMPENSATION BE MADE TO THE CONTRACTOR FOR ANY INCONVENIENCES CAUSED BY HIM BY ENCOUNTERING THE AFOREMENTIONED UTILITIES WHICH ARE NOT SHOWN, OR ARE INCORRECTLY SHOWN ON THE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATIONS OF ANY UNDERGROUND UTILITIES, GAS MAINS, ELECTRIC AND TELEPHONE CONDUITS.
4. CONTRACTOR SHALL PERFORM DAILY CLEAN-UP OPERATIONS WHICH INCLUDE REMOVAL OF DEBRIS AND EXCESS
CONSTRUCTION MATERIAL TO THE SATISFACTION OF THE OWNER AND THE ENGINEER.
5. DURING ALL NON-WORKING HOURS, THE CONTRACTOR WILL BE REQUIRED TO STORE ALL EQUIPMENT AND MATERIALS
WITHIN THE DESIGNATED AREAS AT THE PROJECT SITE.
6. ALL DIMENSIONS SHOWN ARE APPROXIMATE AND SUBJECT TO THE APPROVAL OF THE OWNER AND THE ENGINEER.
7. CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STATE AND LOCAL CODE REQUIREMENTS, THE CONTRACT, AND
SUBJECT TO THE APPROVAL OF THE OWNER AND THE ENGINEER.
8. CONTRACTOR SHALL SECURE CONSTRUCTION SITE IN ACCORDANCE WITH ALL APPLICABLE SAFETY STANDARDS AND
SUBJECT TO THE APPROVAL OF THE OWNER AND THE ENGINEER.
9. CONTRACTOR SHALL COORDINATE ACTIVITIES WITH THE OWNER SO AS TO MINIMIZE INTERRUPTION TO THE WATER
SUPPLY.
10. ALL ELEVATIONS ARE BASED ON N.A.V.D. 1988 DATUM, UNLESS OTHERWISE INDICATED.
11. CONTRACTOR WILL BE REQUIRED TO PROTECT AND MAINTAIN ALL BENCHMARKS AND MONUMENTS. CONTRACTOR WILL BE
RESPONSIBLE TO RESTORE ALL BENCHMARKS OR MONUMENTS DISTURBED BY THE CONTRACTOR'S WORK.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL LAYOUT, SURVEY, ETC. AS REQUIRED TO COMPLETE THE WORK.
13. THE DRAWING AND SPECIFICATIONS ARE COMPLEMENTARY, THE PROJECT SEPARATELY BOUND, CONTAINS THE
CONDITIONS OF THE CONTRACT, PROCEDURES AND TECHNICAL SPECIFICATIONS.
14. ALL CONTRACTORS ARE TO VISIT THE SITE AND BECOME FAMILIAR WITH THE CONDITIONS OF THE SITE AND DIFFICULTIES
ATTENDING THE WORK.
15. DO NOT SCALE MEASURE AND DRAWING. VERIFY THE FIGURES, DIMENSIONS AND DESIGN INTENTION SHOWN ON THE
DRAWINGS BEFORE BEGINNING LAYOUT OF THE WORK.
16. REPORT ANY ERRORS, INACCURACIES, MISSING DIMENSIONAL REQUIREMENTS OR CONFLICTS TO THE
ARCHITECT/ENGINEER IN WRITING BEFORE BEGINNING ANY WORK.
17. VERIFY EXACT LAYOUT CAPABILITY WITH ALL EXISTING CONDITIONS AND COORDINATE ALL WORK TO BE UNDERTAKEN
PRIOR TO BEGINNING ANY WORK. NOTIFY THE ARCHITECT/ENGINEER IN WRITING BEFORE BEGINNING WORK IF ANY DISCREPANCIES ARE FOUND WITH CONDITIONS ENCOUNTERED, AS WELL AS ITEMS COVERED IN 8 AND 9. CONTRACTOR WILL BE RESPONSIBLE FOR ALL TEMPORARY MEASURES, TIME LOST, CHANGES TO THE WORK SCOPE WITHOUT ANY ADDITIONAL COMPENSATION IF CONTRACTOR FAILS TO PROVIDE AFOREMENTIONED VERIFICATIONS AND COORDINATION
PRIOR TO COMMENCING WORK.
18. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES, LAWS, AGENCIES HAVING JURISDICTION, AND STATUS AS
REQUIRED.
19. CONTRACTOR SHALL STRICTLY ADHERE TO MANUFACTURER'S PRINTED INSTRUCTION.
20. VERIFY ALL CHANGES TO WORK IN WRITING WITH THE ARCHITECT/ENGINEER AND OWNER BEFORE BEGINNING RELATED
WORK.
21. PROVIDE POSITIVE DRAINAGE AWAY FROM THE FOUNDATION PERIMETER, PITCH 1/4" PER FOOT. NOTIFY
ARCHITECT/ENGINEER OF ANY DISCREPANCIES WITH THIS REQUIREMENT BEFORE PROCEEDING.
22. IF APPLICABLE, ALL CONTRACTS MUST REVIEW ALL DRAWINGS CONTAINED IN THE SET SO AS TO BECOME FAMILIAR WITH
THE WORK REQUIRED UNDER THEIR SCOPE AND THE WORK OF ALL OTHER CONTRACTORS. ADDITIONALLY, ALL CONTRACTORS ARE RESPONSIBLE FOR THE COORDINATION OF THEIR WORK WITH ALL OTHER TRADES AND
CONTRACTORS.
23. DIMENSIONS NOTED AS "EQUAL" OR "EQ" WITHIN A ROOM REFER TO A DISTANCE RELATIONSHIP CONTAINED ONLY IN THAT
ROOM AT AN OPPOSING OR PARALLEL WALL UNLESS NOTED OTHERWISE.
24. VERIFY AND ADJUST APPROXIMATE DIMENSIONS (+/-) IN THE FIELD. VERIFY WITH ARCHITECT/ENGINEER PRIOR TO
CONSTRUCTION.
25. ALL ITEMS DETAILED OR SPECIFIED TO RUN WITHIN OR ATTACHED TO WALLS AND CEILINGS ARE TO BE CONCEALED OR
RECESSED UNLESS NOTED OTHERWISE.
26. CONTRACTOR SHALL LOCATE ALL PENETRATIONS REQUIRED TO ACCOMMODATE ALL WORK DETAILED OR SPECIFIED FOR
THEIR SCOPE, AND COORDINATE THIS WORK WITH OTHERS.
27. CONTRACTOR SHALL PROTECT ALL ADJACENT EXISTING CONSTRUCTION, ITEMS, FINISHES, ETC. AND SHALL PATCH, REPAIR AND/OR REPLACE, AND REFINISH AS REQUIRED TO RESTORE ANY AND ALL AREAS DAMAGED DURING CONSTRUCTION.
28. CONTRACTOR SHALL PROVIDE, AND COORDINATE THE INSTALLATION OF, ALL ACCESS PANELS THAT ARE NEEDED TO
ACCESS OR SERVICE FOR ALL ITEMS INSTALLED AS PART OF THEIR SCOPE OF WORK.
29. CONTRACTOR SHALL PROVIDE TEMPORARY CONSTRUCTION FENCING CONFORMING TO BNL STANDARDS TO PROTECT WORK AREAS DURING CONSTRUCTION AS PER SPECIFICATION SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS.
30. THE CONTRACTOR IS NOT PERMITTED TO REMOVE ANY EXISTING TREES. IF THE REMOVAL OF ANY TREES IS REQUIRED TO COMPLETE ANY OF THE WORK, OWNER SHALL APPROVE TREES TO BE REMOVED PRIOR TO ACTUAL REMOVALS. REMOVALS SHALL INCLUDE REMOVAL OF COMPLETE STUMP AND ROOT SYSTEM. CONTRACTOR SHALL NOT BE PERMITTED TO GRIND
STUMPS.
31. CONCRETE SIDEWALKS SHALL BE SAWCUT BACK TO EXPANSION/CONTROL JOINTS.
PROJECT SHEET LIST
SHEET
NO.
DRAWING
NO. SHEET NAME
1 G 000 COVER SHEET
2 G 001 PROJECT SHEET LIST AND GENERAL NOTES
3 V 100 EXISTING SITE CONDITIONS AND DETAIL
4 T 001 GENERAL NOTES, ELEVATION, AND ISOMETRIC
5 T 100 FLOOR PLANS
6 T 500 TANK DETAILS
7 E 001 LEGENDS AND SCHEDULES
8 E 100 TANK ELECTRICAL PLAN
9 E 200 TANK ELEVATION ELECTRICAL PLAN
10 E 500 ELECTRICAL DETAILS
11 T 501 TANK DETAILS
SYMBOLS LEGEND
CENTERLINE
Level Name
N
PROJECT
NORTH
G1.0
G1.0
DETAIL KEY
ELEVATION LEVEL
NORTH ARROW
1 Drawing Title
SCALE:
DRAWING TITLE
SECTION CUT KEY
32. CONTRACTOR SHALL COORDINATE ACTIVITIES WITH OWNER/ENGINEER SO AS TO MINIMIZE
DISTURBANCE TO SITE, EXISTING WATER SUPPLY FACILITIES AND SURROUNDING AREAS.
33. PROTECT EXISTING STRUCTURES DURING EXCAVATION. PROVIDE TEMPORARY SHORING OR
BRACING AS REQUIRED TO PROPERLY AND ADEQUATELY SUPPORT EXISTING STRUCTURES.
34. CONTRACTOR SHALL COORDINATE ALL WORK WITH OWNER SO THAT DAILY OPERATIONS WILL NOT
BE AFFECTED BY NEW CONSTRUCTION.
35. CONTRACTOR SHALL SUBMIT A PLAN FOR THE PROTECTION OF THE POLICE HEADQUARTERS AND RELATED FACILITIES
INCLUDING PROVIDING SAFE INGRESS / EGRESS TO AND FROM THE HEADQUARTERS.
MARK DATE DESCRIPTION
1 07/2022 BNL Review Revisions 2 09/2022 Addendum 1
36. EXISTING WATER MAIN VALVES MAY ONLY BE OPERATED BY BNL WATER OPERATORS. IF EXISTING WATER MAIN VALVES REQUIRE OPERATION 48 HOURS' NOTICE MUST BE PROVIDED TO BNL BEFORE THE REQUESTED OPERATION IS REQUIRED.
ALL AREAS DISTURBED BY THE WORK SHALL BE RESTORED TO PREEXISTING OR SPECIFIED NEW CONDITIONS INCLUDING
BUT NOT LIMITED TO ASPHALT PAVEMENT, CONCRETE CURBS, GRASS AREAS, ETC.
37.
| Sheets |
| G 001 - PROJECT SHEET LIST AND GENERAL NOTES |
| T 001 - GENERAL NOTES, ELEVATION, AND ISOMETRIC |