Finished Grade -0' - 6"
Overflow Elevation 127' - 1 13/16"
Low Water Elevation 89' - 7 13/16"
HE
AD
R
AN
GE
6"
Lower Platform ± 28' - 5 1/4"
Upper Platform ± 74' - 9"
Top of Access Tube Cover 134' - 5 3/4"
ELEV. 110.13'
ELEV. 199.15'
ELEV. 237.65'
First Floor 0' - 0"
ELEV. 110.63'
55' - 10" Ø ±
7 3 /4"
Overall Height 137' - 9 1/2"
4'
- 5 3/
4"
7'
- 9 1/
2"
7'
- 4
0"
BROOKHAVEN NATIONAL LABORATORY LOGO,
ALTERNATE BID ITEM, LOGO SHALL BE FOUR (4)
DIFFERENT FINISH COAT COLORS IN ADDITION
TO THE BASE FINISH COLOR OF THE TANK
TANK ELEVATION GENERAL NOTES:
1. ALL ELEVATIONS PREFACED WITH "ELEV." ARE IN REFERENCE TO NAVD88.
2. THE TANK FIRST FLOOR, OR TOP OF RING WALL, ELEVATION OF 110.63' NAVD88
WAS PROVIDED BY BNL AS PER RECENT SURVEYING INFORMATION.
BLAST SSPC SP-10 AND PAINT ALL
EXTERIOR PIPE SURFACES, TYP.
BLAST SSPC SP-7 AND PAINT EXISTING
CONCRETE FOUNDATION, REMOVE LOOSE
MATERIAL AND APPLY NEW FOUNDATION
COATING SYSTEM T 500
BLAST SSPC SP-6 AND PAINT ALL
EXTERIOR SURFACES
EXISTING 6"Ø FLOOR DRAIN,
TYP., TANK NOTE 3
EXISTING TRENCH DRAIN GRATES,
TANK NOTE 3
CONNECT NEW 3/4"Ø SAMPLING LINE
AND 3/4"Ø PRESSURE SENSING LINE TO
EXISTING 3/4" BALL VALVES, LOCATED
BEFORE ACCESS TUBE
BLAST SSPC SP-10 AND PAINT ALL
INTERIOR DRY SURFACES
BLAST SSPC SP-10 AND PAINT ALL
INTERIOR WET SURFACES
BLAST SSPC SP-10 AND PAINT ALL
INTERIOR DRY RISER SURFACE AND
UNDERSIDE OF WATER CAVITY SURFACE
EXISTING ACCESS LADDER, TYP., TANK NOTE 6
TANK NOTES:
1. INSTALL AFTER PREPARATION AND PAINTING IS COMPLETED.
2. CONTRACTOR SHALL FURNISH AND INSTALL TWO (2) HEAT TRACE CABLES, ONE (1) PRIMARY AND ONE (1) BACK-UP
FOR EACH COPPER LINE. FURNISH AND INSTALL PIPE INSULATION AFTER INSTALLATION OF HEAT TRACE CABLES.
THE TWO COPPER LINES TO BE HEAT TRACED SHALL BE TRACED WITH ONE CONTINUOUS HEATING CABLE. CONNECT
TO THE HEAT TRACE CONTROLLER IN THE SAMPLING STATION.
3. REMOVE, PROTECT, AND STORE. REINSTALL AFTER PREPARATION AND PAINTING IS COMPLETED.
4. REMOVE, PROTECT, AND STORE EXISTING SAFETY CLIMB DEVICE. REINSTALL AFTER PREPARATION AND PAINTING IS
COMPLETED.
5. REMOVE, PROTECT, AND STORE LADDER HARDWARE CONNECTING THE LADDER TO THE CONCRETE TANK FLOOR
AND CONDENSATE PLATFORM. TEMPORARILY SUPPORT THE LADDER AS REQUIRED. REINSTALL AFTER PREPARATION
AND PAINTING IS COMPLETED.
6. AFTER ALL PREPARATION AND PAINTING IS COMPLETE, CONTRACTOR SHALL INSTALL NEW SAFETY CLIMB SYSTEMS
AS PROVIDED BY THE OWNER.
NO SCALE
PIPE INSULATION ON WELDED STEEL
INLET / OUTLET PIPE, INSULATION
PROVIDED BY OWNER, INSTALLED BY
CONTRACTOR, NOTE 1
T 500
EXISTING 12"Ø INLET /
OUTLET PIPING
T 500
NEW 3/4"Ø SAMPLING LINE AND 3/4"Ø PRESSURE
SENSING LINE, AND ASSOCIATED BRACKETS (NOT
SHOWN FOR CLARITY), TANK NOTES 1 AND 2
EXISTING TANK SHAFT INLET /
OUTLET PIPE BRACKET, TYP. OF 6,
GENERAL TANK NOTE 16
T 500
4 EXISTING TANK SHAFT OVERFLOW
PIPE BRACKET, TYP. OF 6, GENERAL
TANK NOTE 16
T 500
4 EXISTING DRY RISER INLET / OUTLET
PIPE BRACKET, TYP. OF 1, GENERAL
TANK NOTE 16
T 500
4 EXISTING DRY RISER OVERFLOW
PIPE BRACKET, TYP. OF 2,
GENERAL TANK NOTE 16
NEW SAMPLE STATION
ENCLOSURE, SEE TANK NOTE 1
EXISTING 12"Ø OVERFLOW PIPING
T 500
EXISTING LOWER PLATFORM
ACCESS LADDER, TANK NOTE 6
EXISTING 24"Ø VENT, TANK NOTE 3
EXISTING 30"Ø DRY RISER HATCH
EXISTING 30"Ø WATER CAVITY HATCH EXISTING 36"Ø BOLTED EXHAUST MANHOLE
EXISTING MIXING SYSTEM
VALVES, TANK NOTE 3
EXISTING DRY RISER ACCESS
LADDER, TANK NOTE 4
EXISTING WATER CAVITY
ACCESS LADDER, TANK NOTE 6
EXISTING MIXING SYSTEM
VALVES, TANK NOTE 3
EXISTING 30"Ø MANWAY
EXISTING WATER CAVITY GRATING, TANK NOTE 3
EXISTING 30"Ø WATER CAVITY MANWAY
NEW TANK LIGHTING, SEE 'E' DRAWINGS
T 500
EXISTING WATER CAVITY, CONTRACTOR
SHALL FLUSH DRAIN LINE UPON
COMPLETION AND DISCONNECT AND STORE
DETACHABLE HOSE ACCORDINGLY
EXISTING CABLE RIGGING
COUPLINGS, TYP. AT EACH
PLATFORMT 500
NEW NETWORK RACK
ENCLOSURE, AS
MANUFACTURERED BY DDN
UNLIMITED, MODEL OD-30DDC,
CREAM COLOR, ON
EQUIPMENT PAD
EXISTING ANCHOR BOLT GREASE
BOX, TYP. OF 16, NOT SHOWN FOR
CLARITYT 500
GENERAL TANK NOTES:
1. THE ENGINEER WILL TAKE AND TEST SOIL SAMPLES FOR HEAVY METALS PRIOR TO AND AFTER CONSTRUCTION TO
CONFIRM THAT BACKGROUND HEAVY METAL LEVELS ARE NOT EXCEEDED FOLLOWING CONSTRUCTION. THE CONTRACTOR WILL BE REQUIRED TO REMEDIATE ALL AREAS WHERE HEAVY METAL LEVELS EXCEED THE
BACKGROUND LEVELS.
2. AIR MONITORING WILL BE REQUIRED AS OUTLINED IN SPECIFICATION SECTION 015719 - TEMPORARY ENVIRONMENTAL
CONTROLS (CONTAINMENT).
3. CONTRACTOR SHALL PROVIDE INSPECTING ENGINEER(S) WITH FULL FACE RESPIRATOR AND REPLACEMENT
CARTRIDGES.
4. THE CONTRACTOR SHALL PROVIDE FULL CONTAINMENT AS SPECIFIED AROUND TANK DURING ALL INTERIOR & EXTERIOR BLASTING, PREPARATORY WORK, AND PAINTING OPERATIONS TO COMPLY WITH STATE REQUIREMENTS
FOR PARTICULATE EMISSIONS.
5. PRIOR TO COMMENCING BLASTING THE CONTRACTOR SHALL INSTALL PROPERLY SIZED PIPE PLUGS OR CAPS IN TANK
FILL AND DRAIN PIPES WITHIN THE TANK TO PREVENT DEBRIS FROM ENTERING THE PIPES.
6. ALL TANK COATINGS SHALL BE LEAD FREE. REFER TO SPECIFICATION SECTION 099870 - STEEL TANK COATING
SYSTEM FOR PREPARATION AND COATING REQUIREMENTS FOR TANK SURFACES.
7. UPON COMPLETION OF PAINTING OPERATIONS, DISINFECT TANK IN ACCORDANCE WITH 331160 DISINFECTION OF
WATER STORAGE FACILITIES AND ANALYZE WATER QUALITY SAMPLES.
8. WATER QUALITY SAMPLES SHALL BE TAKEN IN ACCORDANCE WITH 331120 - WATER QUALITY SAMPLING.
9. UPON FILLING THE TANK, THE ENGINEER SHALL OBSERVE THE TANK AND APPURTENANT PIPES FOR LEAKAGE. THE
CONTRACTOR SHALL IMMEDIATELY TAKE STEPS TO ELIMINATE ANY LEAKS IN A MANNER APPROVED BY THE ENGINEER
AT NO ADDITIONAL COST TO THE OWNER.
10. CONTRACTOR IS RESPONSIBLE FOR RESTORATION OF SURROUNDING AREAS DAMAGED DURING CONSTRUCTION. AS PART OF SITE RESTORATION, CONTRACTOR SHALL GRADE PERIMETER OF TANK FOUNDATION TO ACHIEVE A MINIMUM OF 2% POSITIVE PITCH AWAY FROM TANK FOUNDATION. PLACE 4" OF TOPSOIL AND HYDROSEED ALL GRASS AREAS
DISTURBED BY CONSTRUCTION.
11. ALL TANK MODIFICATIONS SHALL CONFORM TO PART 7 OF THE 2018 EDITION OF THE RECOMMENDED STANDARDS FOR
WATER WORK.
12. ALL MATERIAL DEEMED HAZARDOUS SHALL BE HANDLED AND DISPOSED OF IN ACCORDANCE WITH SECTION 099870-
STEEL TANK COATING SYSTEMS.
13. THE CONTRACTOR SHALL SUBMIT FOR THE ENGINEER'S REVIEW ANY AND ALL PROPOSED PERMANENT OR TEMPORARY TANK ATTACHMENTS, CONSTRUCTION AIDS, ETC. THE ENGINEER SHALL DETERMINE WHETHER THESE PROPOSED ATTACHMENTS, CONSTRUCTION AIDS, ETC. SHALL BE PERMITTED TO BE PERMANENTLY INSTALLED OR BE REQUIRED TO BE REMOVED. THE INSTALLATION, REMOVALS, TOUCH-UP PAINTING, ETC. PROCESS SHALL BE
APPROVED BY THE ENGINEER PRIOR TO ANY INSTALLATIONS.
14. ALL INTERIOR PIPING AND CONDUIT SHALL BE PROPERLY SUPPORTED TO WALLS, CEILING AND OTHER STRUCTURES.
ALL MATERIALS USED FOR PIPE SUPPORT SHALL BE STAINLESS STEEL.
15. CONTRACTOR SHALL REMOVE AND PROTECT ALL EXISTING GASKETS AND HARDWARE ON ALL HATCHES OF THE TANK. CONTRACTOR SHALL REINSTALL THESE GASKETS AFTER PREPARATION AND PAINTING IS COMPLETED.
16. ALL U-BOLTS, NUTS, AND WASHERS SHALL BE REMOVED, PROTECTED, AND STORED FROM EXISTING BRACKETS AND
REINSTALLED AFTER PAINTING IS COMPLETED.
17. CONTRACTOR SHALL FURNISH AND INSTALL 1/4" THICK RUBBER ISOLATOR STRIPS FOR ALL SAFETY CLIMB TO
LADDER ATTACHMENTS.
architects engineers
538 Broad Hollow Road, 4th Floor East Melville, NY 11747
631.756.8000 ▪ www.h2m.com
SHEET No.
SHEET TITLE
"ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED
PROFESSIONAL IS ILLEGAL"
REVIEWED BY:DRAWN BY:DESIGNED BY:
PROJECT No: DATE:
CHECKED BY:
CONSULTANTS:
Q
CONTRACT
CLIENT
STATUS
SCALE:
AS SHOWN
DRAWING No.
OF9/
/2
:0 8:
P
M C
:\U se rs \a m an fre di
\D oc um en ts \B
N
LO
_C en tra l2
1_ Pa in tin g C on tra ct _a m an fre di
BR
6C
B.
rv t
T 001
FINAL BID DOCUMENT
Painting of New 500,000 Gallon Water Tower
Brookhaven National Laboratory
AMT
AUGUST 2022BNLO1804
JEK
Upton Road, Upton, New York 11973
GENERAL NOTES, ELEVATION,
AND ISOMETRIC
CONTRACT P - PAINTING
SCALE: 1/8" = 1'-0"1 Tank Elevation
SCALE:2 Tank Isometric
MARK DATE DESCRIPTION
1 07/2022 BNL Review Revisions 2 08/2022 BNL Review Revisions 2 3 09/2022 Addendum 1
| Sheets |
| T 001 - GENERAL NOTES, ELEVATION, AND ISOMETRIC |
| 2022-09-16T08:12:35-0400 | |
| JJT PE Stamp |