402_OR0020401_MUNI_Seaside_Settlement_Worksheet.pdf

PDF 130 KB Posted

Attached to
RFQ - Sewer Master Plan
Solicitation number
S-KS0030-00016043
Issued by
Benton County, Oregon

About this file

This is a Settlement Worksheet document related to an NPDES (National Pollutant Discharge Elimination System) permit for the City of Seaside, Oregon, located in zip code 97138. The document appears to be part of a municipal stormwater or wastewater compliance framework, though specific project details, scope of work, quantities, response dates, or bidding procedures are not contained within the provided excerpt.

The worksheet includes adjustment factors used in permit calculations or fee determinations. The private entity adjustment factor is set at 1.0, indicating that Seaside is a publicly owned municipal entity rather than a private organization, which would have resulted in a 2.0 factor adjustment. A flow adjustment factor section is referenced but not detailed in the excerpt provided. No information regarding pricing terms, set-asides, incumbents, funding sources, or contract renewal options is available in this document fragment.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version 1 (updated April 2019)

NPDES Permit Number

Seaside, Oregon 97138

PRIVATE ENTITY ADJUSTMENT FACTOR

4 Is the entity privately owned? If yes, adjustment factor of 2.0 is applied. No 1.0

FLOW ADJUSTMENT FACTOR

A <0.050 mgd (no adjustment is applied) No adjustment factor is applied.

B ≥0.050 mgd and <0.250 mgd Adjustment factor of 1.5 is applied.

C ≥0.250 mgd and <1 mgd Adjustment factor of 3.0 is applied.

D ≥1 mgd and <5 mgd Adjustment factor of 6.0 is applied. X 6.0

E ≥5 mgd and <10 mgd Adjustment factor of 10.0 is applied.

F ≥10 mgd and <50 mgd Adjustment factor of 15.0 is applied.

G ≥50 mgd Adjustment factor of 20.0 is applied.

REPEAT VIOLATOR ADJUSTMENT FACTOR

6 A How many other state and federal formal enforcement actions has the responsible entity been subject to in the last three years? Include enforcement actions at this facility and any other facilities.

For each enforcement action, adjustment factor is increased 50%.

1.0

847/4+416 6.00

Necanicum River (303(d) listed)

Tony Biamont

Name of Authorized Official (40 CFR 122.22):

Inspection Date(s) (if applicable):

Name of Receiving Water Body (Indicate whether 303(d) listed):

No

Select the appropriate average volume of flow on a day of discharge in millions of gallons per day

(MGD). If a facility discharges only on a periodic basis, do not include days with zero flow when calculating the average flow:

TOTAL ADJUSTMENT FACTOR

Expedited Settlement Offer Worksheet

Violations Form For Wastewater

Consult instructions regarding eligibility criteria and procedures prior to use.

Walter Mills

LOCATION AND ADDRESS OF FACILITY

Acting Wastewater Treatment Plant Foreman

989 Broadway

Seaside, Oregon 97138

LEGAL NAME AND MAILING ADDRESS OF RESPONSIBLE ENTITY

1 OR0020401

1/1/2019

11/30/2023

Permit Effective Date:

Permit Expiration Date:

EPA Office:

EPA Contact Title:

Katrina ChambonEPA Contact Name:

Are any findings a result of an inspection?

Case Officer2 City of Seaside

1821 North Franklin Street Anchorage Operations Office

FACILITY DESCRIPTION / CONTACT NAMES

Name of Facility Contact (ESO Worksheet recipient):

Tony Biamont

Dollar

R No. of Amount

CWA / Permit C Viol- w/ Adjust.

Violation(s) / Corrective Action(s) A* actions Factor Total

MONITORING / REPORTING

Failure to submit compliance schedule report:

A Late but less than 30 days late $300 =

B Submitted more than 30 days late $450 =

C Not submitted $900 =

Failure to submit timely discharge monitoring report

(DMR) and/or DMR submitted with failure to conduct self-monitoring:

A DMR late but less than 30 days late $300 =

B DMR submitted more than 30 days late 1 $450 = $450

C DMR not submitted or DMR submitted with a failure to sample pollutants - conventional pollutants

(count each conventional pollutant not reported or not sampled as a violation; BOD, TSS, pH, oil and grease, e. coli, fecal coliform)

1 $450 = $450

D DMR not submitted or DMR submitted with a failure to sample pollutants - toxic pollutants

(count each toxic pollutant not reported or not sampled as a violation)

$450 =

9 Failure to conduct self-monitoring in accordance with permit requirements, including but no limited to required sample type, sample location, representative sampling, meeting 40 CFR 136 or other permit requirements (count each pollutant with one or more failures)

$150 =

Failure to submit any other required report or notice

(e.g., biosolids report, pretreatment report, industrial user notification, planned changes, anticipated noncompliance, anticipated bypass, etc.):

A Late but less than 30 days late $300 =

B Submitted more than 30 days late $450 =

C Not submitted $900 =

24-Hour Noncompliance Notice

A Failure to provide notice of noncompliance $450 =

B Noncompliance notice late $300 =

5-Day Written Noncompliance Follow-up Report:

A Failure to provide report $450 =

B Report provided late and/or incomplete $300 =

Noncompliance Not Required Within 24 Hours:

A Failure to provide report with DMR $150 =

B Report provided late and/or incomplete $60 =

$900Subtotal Monitoring / Reporting Violations

ESA eligible if violations occurred within the 24 months immediately prior to the ESA offer.

September 2022 failed to submit toxicity sampling report due October 15, 2022. The report was submitted February 10, 2023.

November 2023 failed to sample for alkalinity.

Schedule B.1 and

Schedule B.3

OPERATIONS AND MAINTENANCE

14 Failure to conduct and document self-inspections of facility (count each month with one or more missed and/or undocumented inspection)

$240 =

15 Failure to document all required information in self-inspections or conduct a complete inspection (count each month with one or more partially documented/completed inspection unless the month is accounted for in #15)

$120 =

16 Failure to identify and document corrective actions $120 =

17 Failure to meet operation and maintenance requirement of the permit

$600 =

18 Failure to manage removed substances in accordance with the permit

$1,500 =

$0

EFFLUENT LIMITATIONS

Failure to meet effluent limitations:

A Months with effluent exceedance less than 40% above the limit - conventional pollutants

(count each conventional pollutant separately as a violation; BOD, TSS, pH, oil and grease, e. coli, fecal coliform)

Schedule A.1.a.i 2 $300 = $600

B Months with effluent exceedance 40% or more above the limit - conventional pollutants

(count each conventional pollutant separately as a violation; BOD, TSS, pH, oil and grease, e. coli, fecal coliform)

5 $450 = $2,250

C Months with effluent exceedance less than 20% above the limit - toxic pollutants

(count each toxic pollutant separately as a violation)

$600 =

E Months with effluent exceedance 20% or more above the limit - toxic pollutants

(count each toxic pollutant separately as a violation)

$1,200 =

$2,850

RECORDS

20 Failure to create/maintain sampling and/or analysis records (count each month with one or more failure)

$240 =

21 Failure to maintain other records required by the permit (count each month with one or more failure excluding records not maintained in #22)

$150 =

$0

INDUSTRIAL WASTE

22 Failure to meet industrial waste management/pretreatment requirement for POTWs without approved pretreatment programs (excluding failure to provide notice counted in #11)

$600 =

ECONOMIC BENEFIT ESTIMATE

$3,750Total Expedited Settlement

ESA eligible if violations occurred within the 24 months immediately prior to the ESA offer.

ESA eligible if violations occurred within the 12 months immediately prior to the ESA offer.

ESA eligible if violations occurred within the 24 months immediately prior to the ESA offer.

ESA eligible if violations occurred within the 60 months immediately prior to the ESA offer.

Subtotal Records Violations

Subtotal Effluent Limitations Violations

Subtotal Operations and Maintenance Violations

19 October 2023 and December 2023 exceedance of E.coli; the permit limit is 406 E.coli organisms/100 millilter (#/100 mL) and the results are 629/100mL and 2,419/100mL., respectively. December 2023 total suspended solids (TSS) exceedance of the monthly average of 560 pounds per day (lb./d) and weekly average of 840 lb./day; results are 599 lb./d, and 1,833 lbs./d, respectively. TSS exceedance of monthly average percent(%) removal of 85% , the result is 67%. TSS exceedance of weekly average of 45 milligrams per liter (mg/l), result is 134 mg/L. January

2024 exceedance of minimum pH of 6.0, the result is 5.8.

ESA eligible if estimated economic benefit of noncompliance is less than total ESA offer.

ESA eligibleEnter total estimate economic benefit calculated rounded up to the nearest $50

File details come from the government source that posted it. Updated .