4-Sewer Pipe Lining 2025 Project - Schedule of Work.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Lehi City 2025 Sewer Pipe Lining Project RFB
- Solicitation number
- Lehi 2025-21
- Issued by
- Utah County, Utah
About this file
This document is a Bid Schedule for the Lehi City Sanitary Sewer Lining Project 2025, located in Utah. The project involves the installation of a 12-inch UV CIPP (Cured-In-Place Pipe) liner for approximately 3,000 linear feet of sewer mainline, which includes 26 lateral reinstatements. The bid schedule outlines six primary line items: UV CIPP liner installation, mobilization, pipe preparation/cleaning and inspection, traffic control plan, sewer bypass, and resident notification. The contractor will be responsible for notifying residents 24-48 hours before beginning work in each section.
The bid schedule indicates a comprehensive municipal infrastructure rehabilitation project with estimated quantities and unit pricing for each project component. While specific pricing details are not fully disclosed in the document, the schedule provides a framework for bidders to understand the project scope and associated costs. The project appears to be focused on improving and maintaining the city's sanitary sewer infrastructure, with an emphasis on minimizing disruption to residents through detailed planning and communication protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Aerial Map.pdf | ||
| 1-Sewer Pipe Lining Project 2025 RFB.pdf | ||
| 5-Agreement-Template for Construction Related Services.pdf | ||
| 2-Inspection Sheets.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Bid Schedule |
| Lehi City Sanitary Sewer Lining Project 2025 |
| Item No. | Description | Est. Quantity | Units | Unit Price | Total |
| 1 | Installation of 12" UV CIPP Liner - Includes 26 lateral reinstatements | 3000 | feet | ||
| 2 | Mobilization | 1 | ea. | ||
| 3 | Pipe prep / Cleaning & Inspection | 1 | ea. | ||
| 4 | Traffic Control Plan | 1 | ea. | ||
| 5 | Sewer Bypass | 1 | ea. | ||
| 6 | Notification to all residents affected by project 24 -48 hours before project begins for each section of work. |
Grand Total
&D
File details come from the government source that posted it. Updated .