2-Inspection Sheets.pdf
PDF 2 MB Posted
- Attached to
- Lehi City 2025 Sewer Pipe Lining Project RFB
- Solicitation number
- Lehi 2025-21
- Issued by
- Utah County, Utah
About this file
These documents are Infrastructure Technologies @pipes Defect Listing Plots for wastewater pipeline inspections conducted in Lehi City, Utah during July and September 2024. The inspections were performed on various sections of pipeline located on 1200 West, Trinnanman Lane, and other streets in the Central area, using a downstream inspection method. Each plot documents a specific pipe segment's characteristics, including start and end manholes, pipe material (concrete), shape (circular), diameter (12 inches), and inspection details such as length, depth, and lateral connections. The inspections were consistently performed by an operator named Weston S using truck SW-12 and camera T-76, with weather conditions noted as either clear or cloudy.
The defect listing plots systematically record pipeline conditions, with most inspections categorized as "Maintenance Related" and part of the "1500 North Project" or "Trinnanman Lane" project. The documents detail specific pipeline defects at various distances along each segment, including lateral active connections, infiltration issues, and in one instance, a medium-level collapse at 20.6 feet into the 1220 North pipeline segment. The inspection data includes continuous positioning, validation measurements, and qualitative assessments of pipeline integrity, which appear to be part of a comprehensive infrastructure assessment and maintenance planning effort for Lehi City's wastewater system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-Sewer Pipe Lining 2025 Project - Schedule of Work.xlsx | XLSX spreadsheet | |
| 3-Aerial Map.pdf | ||
| 1-Sewer Pipe Lining Project 2025 RFB.pdf | ||
| 5-Agreement-Template for Construction Related Services.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Infrastructure Technologies
@pipes Defect Listing Plot
4921 Alexander Blvd
Albuquerque, NM
877-lTpipes
Pipe ID City
LEHI CITY
Street
1200 WEST
Shape
Circular
Direction
SOUTH
Area
CENTRAL
Stari Ivlanhole
1300 NORTH
Material
Concrete
Year Laid Sectio'i Type
Wasteiwater
End Manhole
1271 NORTH
Inspectsd Length
137.4
Year Renewed MH Depth i2.3
MH Depth Joint Length Diameter
/ Cleaned LiveSewer Situation Reason
Maintenance Related Date 07/29/2024 Clean Date
Weathttr lear Dry
Project
150 € NORTH PROJECTStart Time 14:04
Operator
Weston S
Developer Truck
SW-1 2
Inspec ion Dir.
Downstream
Info
Operator Comment P.0. Number Present Flow Control Camera
T-76
's }
JJ% 1300 NORTH
" !" Code:
0 ft.
91 ft.
137.4 fk. Inspection Ends at Downstream Manhole
1271 NORTH
Continuous: Pos: Val 1 / 2 :
Lehi Master Page: 1 of 1
Defect Listing Plot
Infrastructure Technologies
4921 Alexander Blvd
Albuquerque, NM
877-lTpipes
Pipe ID City
LEHI CITY
Skree}
1200 WEST
Shape
Circular
Direction
SOUTH
Area
CENTRAL
Stari Manhole
1271 NORTH
Material
Concrete
Year Laid Sectioq Type
Wastewater
End Manhole
1220 NORTH
Inspected Length
271.6
Year Renewed MH Depth g.g
MH Depth Joint Length
I
Diame!er
, 12
/ Cleaned LiveSewer Situation Reason X
Maintenance Related Date 07/29/2024 Clean Date
Weather lear Dry
Project
1500 NORTH PROJECTStart Time 14:21
Operator
Weston S
Developer Truck
SW-12
Inspec :ion Dir.
Downstream
Info
Operator Comment p.o. Number Present Flow Control Camera
T-76
'y
1271 NORTH
Code:
0 ft.
Continuous: Pos: Val I / 2 :
173.4 ft. Lateral Active
3 74,5 jI. Infiltration Running
HT ABOVE LATERAL
l74.5ft.
174.5 ft. Lateral Capped
1238 NORTH?
271 .6 ft. Inspection Ends at Downstream Manhole
1220 NORTH
1220 NORTH
Defect Listing Plot
4921 Alexander Blvd
Albuquerque, NM
877-lTpipes
Pipe ID City
LEHI CITY
Street
1200 WEST
Shape
Circular
Direction
SOUTH
Area
CENTRAL
Siari Manhole
1220 NORTH
Material
Concrete
Year Laid Sectios Type
Wasteiwater
End Manhole
MANHOLE BEFORE TRAIN TRACKS
Inspected Length
249.3
Year Renewed MH Depth
8.6
MH Depth
Jo"en"' I Diameter
/ Clerined Jetting Situation Reason Xi
Maintenance Related Date 07/31/2024 Clean Date
Weather lear Dry
Project
150C NORTH PROJECTStart Time 14:36
Operator
Weston S
Developer Truck
SW-12
Inspec :ion Dir.
Downstream
Info
Operator Comment P.0. Number Present Flow Control Camera
T-76
'1%
. ? 1220 NORTH
"" Code:
0 ft.
20.6 fk. Collapse medium
241,9 ft. Lateral Capped
243.8 ft.
249.3 ft.
MANHOLE BEFORE TRAIN TRACKS
Continuous: Pos: Val 1 / 2
Lehi Master Page: 1 of 4
Defect Listing Plot
Infrastructure Technologies
4921 Alexander Blvd
Albuquerque, NM
877-lTpipes
Pipe ID City
LEHI CITY
Sireet
TRINNANMAN LANE
Shape
Circular
Direction
SOUTH EAST
Area
CENTRAL
Stark Manhole
1545 NORTH
Material
Concrete
Year Laid Seciio* Type
Waste'water
End Manhole
1500 NORTH
Inspected Length
413.9
Year Renewed MH Depth
11.3
MH Depth
JointLengt" I Diameter
I
/ Cleaned LiveSewer Situation Reason 'i
Maintenance Related [)ate 08/29/2024 Clean Date
Weather lear Dry
Project
TRINNANMAN LANEStart Time 15:48
Operator
Weston S
Developer Truck
SW-1 2
Inspec 'ion Dir.
Downstream
Info
Operator Comment p.o. Number Present Flow Control Camera
T-76
'1%
1545 NORTH
Code:
0 ft.
64.7 ft.
158 ft.
220,5 ji. Lateral Active
237.8 ft.
268 ft.
3j7,j j(, Lateral Active
4l3.9ft.
1500 NORTH
Continuous:
ateral Active
Pos: Val 1 /2 :
Defect Listing Plot
4921 Alexander Blvd
Albuquerque, NM
877-lTpipes
Pipe In City
LEHI CITY
Street
TRINNANMAN LANE
Shape
Circular
Direction
SOUTH EAST
Area
CENTRAL
Start Manhole
1600 NORTH
Material
Concrete
Year Laid Sectioi Type
Wasteiwater
End Manhole
1545 MANHOLE
Inspected Length
289.5
Year Renewed MH Depth i2.7
MH Depth Joint Length Diameter
/ Cleaned LiveSewer Situation Reason
Maintenance Related Date 08/29/2024 Clean Date
Weather lear Dry
Project
TR NNANMAN LANEStart Time 4 5:40
Operator
Weston S
Developer Truck
SW-12
Inspec :ion Dir.
Downstream
Info
Opetalor Commem p.o. Number Present Flow Control Camera
T-76
< i
1600 NORTH
Code:
0 ft.
79.5 ft.
158.9 ft.
176 ft.
267,9 ft, Lateral Active
289.5 fk. Inspection Ends at Downstream Manhole
1545 MANHOLE
Continuous: Pos: Val I /2 : ol,, :
Defect Listing Plot
4921 Alexander Blvd
Albuquerque, NM
877-lTpipes
Pipe H) City
LEHI CITY
Street
TRINNANMAN LANE
Shape
Circular
Direction
SOUTH EAST
Area
CENTRAL
Slar! Manhole
1650 NORTH
Material
Concrete
Year Laid Sectioi Type
Wastewater
End Manhole
1600 NORTH
Inspected Length
126.1
Year Renewed MH Depth
12.7
MH Depth I Joint Length I
Diameter i2
/ Cleaned LiveSewer Situation Reason
Maintenance Related [)ate 08/29/2024 Clean Date
Weather lear Dry
Project
TRINNANMAN LANEStart Time 14:46
Operator
Weston S
Developer Truck
SW-1 2
Inspec ion Dir.
Downstream
Info
Operator Comment p.o. Number Prest.nt Flow Control Camera
T-76
's }
1650 NORTH
Code:
0 ft.
47.6 ff.
126.1 fk. Inspection Ends at Downstream Manhole
1600 NORTH
1600 NORTH
Continuous: Pos: Val 1 / 2 :
Defect Listing Plot
4921 Alexander Blvd
Albuquerque, NM
877-lTpipes
Pipe ID City
LEHI CITY
Street
TRINNANMAN LANE
Shape
Circular
Ditection
SOUTH EAST
Area
CENTRAL
Start Manhole
1749 NORTH
Material
Concrete
Year Laid Sectioq Type
Wastewater
End Manhole
1650 NORTH
Inspected Length
421.1
Year Renewed MH Depth
15.7
MH Depth Joint Length Diameter
, 12
/ Cleaned LiveSewer Situation Reason
Maintenance Related Date 08/29/2024 Clean Date
Weather lear Dry
Prolect
TR NNANMAN LANEStart Time 13:57
Operator
Weston S
Developer Truck
SW-12
Inspec ion Dir.
Downstream
Info
Operator Comment P.0. Number Present Flow Control Camera
T-76
1749 NORTH
Code:
0 ft.
'affix?
52.4 ft.
228.1 ft.
283.7 ft.
344.3 ff. Lateral Active
421.1 ft.
1650 NORTH
Continuous: Pos: Val "l / 2
Defect Listing Plot
492'i Alexander Blvd
Albuquerque, NM
877-lTpipes
Pipe ID City
LEHI CITY
Street
TRINNANMAN LANE
Shape
Circular
Diret.tion
SOUTH EAST
Area
CENTRAL
Start Manhole
1800 NORTH
Maienal
Concrete
Year Laid Sectioq Type
Wastciwater
End Manhole
1749 NORTH
Inspected Length
427.1
Year Renewed MH Depth
13.2
MH [)epth Joint Length Diameter
/ Clesned LiveSewer Situation Reason
Maintenance Related [)ate 08/29/2024 Clean Date
Weather lear Dry
Project
TRINNANMAN LANEStart Time 4 3:30
Operator
Weston S
Developer Truck
SW-1 2
Inspec :ron Dir.
Downstream
Info
Operator Comment P.0. Number Present Flow Control Camera
T-76
'1%
1800 NORTH
Code:
0 ft.
198,3ff, LateralActive
427,1 ff, Inspection Ends at Downstream Manhole
1749NORTH
Continuous: Pos: ValI / 2
Defect Listing Plot
4921 Alexander Blvd
Albuquerque, NM
877-lTpipes
Pipe ID City
LEHI CITY
Street
TRINNANMAN LANE
Shape
Circular
Direction
SOUTH EAST
Area
CENTRAL
Start Manhole
1870 NORTH
Material
Concrete
Year Laid Sectiot Type
Wastewater
End Manhole
1800 NORTH
Inspected Length
341 .8
Year Renewed MH Depth i3.8
MH Depth Joint Length
I
Diameter
/ Cleaned LiveSewer Situation Reason X
Maintenance Related Date 09/03/2024 Clean Date
Weather
Cloudy
Project
TR NNANMAN LANEStartTime 11:34
Operator
Weston S i)eveloper Truck
SW-12
Inspec xon [)ir.
Downstream
Info
Operator Comment p.o. Number Present Flow Control Camera
T-76
'y
1870 NORTH
Code:
0 ft. Inspection Begins at Upstream Manhole
1870 NORTH
306.6 ff.
341,8 ft, Inspection Ends at Downstream Manhole
1800 NORTH
Continuous: Pos: Val I /2 : % :
Defect Listing Plot
4921 Alexander Blvd
Albuquerque, NM
877-lTpipes
Pipe ID City
LEHI CITY
Street
TRINNANMAN LANE
Shape
Circular
Direction
SOUTH EAST
Area
CENTRAL
Start Manhole
1125WEST
Malarial
Concrete
Year Laid Sectio" Type
Wastewater
End Manhole
1870 NORTH
Inspected Length
65.9
Year Renewed MH Depth
13.5
MH Depth Joint Length
I
Diameter
/ Cleaned LiveSewer Situation Reason
Maintenance Related ' Date 09/03/2024 Clean Date
Weather
Cloudy
Prolect
TRINNANMAN LANEStartTime 11:30
Operator
Weston S
Developer Truck
SW-12
Inspec.ion Dir.
Downstream
Info
Operator Comment p.o. Number Present Flow Control Camera
T-76
61125WESCTOde, 0 ft.
'Qffi
65,9 ff, Inspection Ends at Downstream Manhole
1870 NORTH
Continuous: Pos: Val I /2
@pipei Defect Listing Plot
4921 Alexander Blvd
Albuquerque, NM
877-lTpipes
Pipe D City
LEHI CITY
Street
TRINNANMAN LANE
Shape
Circular
Direction
SOUTH EAST
Area
CENTRAL
Star! Manhole
1900 NORTH
Maietial
Concrete
Year Laid Sectio i Type
Waste:water
End Manhole
1125WEST
Inspected Length
232.8
Year Renewed MH Depth
12.3
MH Depth Joint Length Diameter
"12
/ Cleaned LiveSewer Situation Reason X
Maintenance Related Date 09/03/2024 Clean Date
Weather
Cloudy
Project
TRINNANMAN LANEStartTime 10:52
Operator
Weston S
Developer Truck
SW-12
Inspec :ion [)ir.
Downstream
Info
Operator Comment p.o. Number Present Flow Control Camera
T-76
< i
1900 NORTH
Code:
0 ft.
1900 NORTH
Continuous: Pos: Val I /2 :
165.6ff.
173.8 ft.
232.8 ft.
1125WEST
nspection Ends at Downstream Manhole
1125 WEST
Lehi Master Page: 4 of 1
File details come from the government source that posted it. Updated .