4-SCHEDULE “C” — TURNKEY COST VALUE PRICING.pdf

PDF 93 KB Posted

Attached to
Lake Mountain School District Design-Build Services: Bus Maintenance & Transportation Facility
Solicitation number
LMSD07102026
Issued by
Utah County, Scipio Town, Utah

About this file

This is a Schedule C Turnkey Cost & Value Pricing document for the Lake Mountain School District's Design-Build Services project to construct a new Bus Maintenance & Transportation Facility in Saratoga Springs, Utah. The District is soliciting competitive proposals from qualified Design-Build Teams consisting of general contracting firms partnered with licensed architectural and engineering sub-consultants to provide comprehensive turnkey design, engineering, permitting, procurement, and construction services. The approximately 18,000 square foot facility will be constructed on existing district-owned property (Utah County Parcel No. 66:290:0008) at the Alpine School District Transportation West facility site, adjacent to Westlake High School. The facility will include eight service bays, a bus wash bay, a CTE classroom component serving as a satellite program for Westlake High School students, offices, restrooms, break room, tire storage, bulk fluid and chemical storage, and a parts room. The RFP closing date is Friday, July 10th, 2026, at 4:00 PM Mountain Time, with construction anticipated to commence on October 15, 2026, and substantial completion targeted for May 2027. A single contract award will be made to the responsive and responsible offeror with the highest evaluation score.

The pricing structure is organized in six phases with fixed design and construction costs: Pre-Construction (Schematic Design, Geotechnical, Structural, MEP Engineering, Permits & Stamped Plans); Phase I (Civil Site Work including selective demolition, re-grading, utility extensions, and Rocky Mountain Power 3-phase service); Phase II (Site Improvements including bus maneuvering aprons, ADA pathways, lighting, and fencing); Phase III (Structural Steel Frame & Foundations); Phase IV (Exterior Enclosure & Code Compliance including masonry wainscot and IMP cladding); and Phase V (Interior Build-Out). The proposal includes line items for construction overhead, general conditions, performance and payment bonds, and contingency costs, with a total project cost to be submitted by the bidder for authorization signature.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE “C” — TURNKEY COST & VALUE PRICING

Project Component / Phase Fixed Design &

Construction Cost

Pre-Construction (Schematic Design, Geotechnical, Structural, MEP Engineering, Permits & Stamped Plans)

Phase I: Civil Site Work (Selective Demolition, Re-Grading, Sub-Grade Prep, Utility Trenching & Extensions, Rocky Mountain Power 3-Phase Service)

Phase II: Site Improvements (Bus Maneuvering Aprons, ADA Pathways & Sidewalks, Pavement Repairs & Markings, Exterior LED Lighting, Perimeter Fencing)

Phase III: Structural Steel Frame & Foundations (Pre-Engineered Columns, Foundations & Reinforced Concrete 6″ Slab)

Phase IV: Exterior Enclosure & Code Compliance, Chapter 19.16 Masonry Wainscot, IMP Cladding, Mechanical Screening)

Phase V: Interior Build-Out (8 Service Bays, Bus Wash Bay, CTE Classroom, Offices, Restrooms, Break Room, Tire Storage, Bulk Fluid/Chemical Storage, Parts Room)

Construction Overhead, General Conditions, Performance/Payment Bonds, and Contingency

Authorized Signature: Date:

Total: (For purchasing department only)