4-I. CBI Form 3.pdf

PDF 249 KB Posted

Attached to
Overhead Bay Door Maintenance
Solicitation number
269- 2026-182
Issued by
Mecklenburg County, Charlotte City, North Carolina

About this file

CBI Form 3 is a Subcontractor/Supplier Utilization Commitment document for Project 269.2026.182 issued by the City of Charlotte, North Carolina, in connection with an Overhead Bay Door Maintenance contract. The form requires proposers to identify all Minority/Women/Small Business Enterprise (M/W/SBE) subcontractors and suppliers, as well as non-M/W/SBE vendors, that will be utilized on the contract across all tiers. M/W/SBEs must be currently certified with the City as of the Proposal Opening Date to receive credit toward the Contract Goal. The form must be completed and submitted at the time of Proposal Opening; failure to properly complete and submit the form constitutes grounds for proposal rejection. The contract covers maintenance and repair services for approximately 250 sectional, rollup, rolling steel doors, rolling and bi-fold hangar doors, rolling grills, and commercial fire doors located at police stations, fire stations, Charlotte Area Transit System facilities, Airport facilities, and cultural facilities, with occasional replacement and installation of new doors.

Within three business days of receiving a request from the City, proposers must submit separate Letters of Intent (CBI Form 4) for each M/W/SBE listed on CBI Form 3, executed by both the M/W/SBE and the proposer; the City will not count proposed M/W/SBE utilization without receipt of the Letter of Intent by the deadline. Proposers must maintain the level of M/W/SBE participation stated in the contract throughout the duration of the contract and comply with Section 5 of the CBI Administrative Procedures Manual if terminating, replacing, or adding M/W/SBEs. All subcontractors and suppliers, regardless of M/W/SBE status, must be registered with the City of Charlotte's vendor database. The contract requires the company to respond to emergency calls for service within four hours and provide all labor, materials, equipment, and supervision for overhead door projects.

View the file

Other files

File Type Posted
6-E. References Form.pdf PDF
3-H. Anti Lobby Cert.pdf PDF
12-B. RFP 269.2026.182.pdf PDF
1-G. Debarment Cert.pdf PDF
11-F. Pricing Schedule.xlsx XLSX spreadsheet
7-D. Proposal Submission Form.pdf PDF
9-K. Background information.pdf PDF
2-J. Contract Exceptions Form.pdf PDF
5-C. Sample Contract.pdf PDF
10-L. License Information.pdf PDF
8-A. Bonfire Guide.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version 06-2023

CBI FORM 3: Subcontractor / Supplier Utilization Commitment Project 269.2026.182

This form MUST be submitted at the time of Proposal Opening. Copy this CBI Form 3 as needed.

Failure to properly complete and submit Form 3 with the Proposal constitutes grounds for rejection of the Proposal.

Per Section 3.5 of the CBI Administrative Procedures Manual, the Subcontractor/Supplier Utilization Commitment (CBI Form 3), captures information regarding the MWSBEs and other subcontractors and suppliers that the Proposer intends to use on the Contract FOR ALL TIERS.

M/W/SBEs must satisfy the requirements of Section 2 of the CBI Administrative Procedures Manual in order to count the work they intend to perform on the contract with its own current workforces towards the Contract Goal, and must list themselves below.

Proposer Name:

Project Name:

MWBE Goal: MBE Goal:

MSBE Goal: WBE Goal:

MWSBE Goal: SBE Goal:

List below all M/W/SBEs that you intend to use on this Contract. NOTE: You will only receive credit for M/W/SBEs that are currently certified with the City as of the Proposal Opening Date.

M/W/SBE Vendor Name (Non-Hauling Services) Description of work / materials NIGP Code

CBI FORM 3: Subcontractor / Supplier Utilization Commitment

List below all non-M/W/SBEs (subcontractors and suppliers) that you intend to use on this Contract

Vendor Name Description of work / materials NIGP Commodity Code

Version 06-2023

Letters of Intent submitted upon notice from the City Per Section 3.5 of the CBI Administrative Procedures Manual, within three (3) Business Days after receiving a request from the City (or within such longer time as may be communicated by the City in writing), Proposers must submit a separate Letter of Intent (CBI Form 4) for each M/W/SBE listed on CBI Form 3. Each Letter of Intent must be executed by both the M/W/SBE and the Proposer. The City shall not count proposed M/W/SBE utilization for which it has not received a Letter of Intent by this deadline. The Proposer is still obligated to pay the M/W/SBE the full amount listed on the Contract with the M/W/SBE regardless of what percentage is actually counted towards the M/W/SBE Goal.

Adding subcontractors or suppliers after submitting this form Nothing in this certification shall be deemed to preclude you from entering into subcontracting arrangements after submission of this form. However, per the CBI Administrative Procedures Manual, you must comply with the following:

• You must maintain the level of M/W/SBE participation stated in the Contract throughout the duration of the Contract, except as specifically allowed in Section 5

• If you need to terminate or replace a M/W/SBE, you must comply with Section 5.3

• If the scope of work on the Contract increases, or if you elect to subcontract any portion of work not identified on this form as being subcontracted, then you must comply with Section 5.4

• A Letter of Intent (CBI Form 4) must also be submitted for each M/W/SBE you add subsequent to contract award.

All Subcontractors and Suppliers must be registered with the City of Charlotte.

Pursuant to the City’s Vendor Registration Policy, each subcontractor or supplier (non-MBE/SBE, WBEs, SBEs and MBEs) that you use on this contract must be registered in the City’s vendor database.

Signature Your signature below indicates that the undersigned firm certifies and agrees that:

(a) It has complied with all provisions of the CBI Policy and Administrative Procedures Manual; and,

(b) Failure to properly document such compliance in the manner and within the time periods established by the CBI Policy and

Administrative Procedures Manual shall constitute grounds for rejection of your proposal.

Signature of Authorized Official Printed Name Title Submittal Date

File details come from the government source that posted it. Updated .