This document appears to be a set of technical drawings for the repair of the Sayles Canyon Trail Bridge in the Eldorado National Forest in California. The drawings provide details on the decking and running planks, including the materials, dimensions, and hardware requirements. The key details include:

The bridge will be repaired by removing the existing temporary timber decking and replacing it with new 2x8 and 2x12 Douglas Fir deck planks, as well as new 2x12 run planks. The drawings specify the use of galvanized wood screws, bolts, and other hardware for installation. The existing prefabricated weathering steel truss bridge structure will be retained, with the contractor required to heat straighten and realign the HSS stringers and center nailer. The project is subject to AASHTO LRFD design specifications, with specific load requirements outlined. The contractor must submit shop drawings for all replaced timber and steel components. This technical drawing package is included as part of Solicitation No. 12970224R0034 issued by the USDA Forest Service for the Sayles Canyon Trail Bridge Repairs project, with a contract value range of $25,000 to $100,000 and a period of performance from 08/15/2024 to 11/15/2025.

View the file

Other files

File Type Posted
A10 1124265 SAM.gov Q&A.pdf PDF
A10 1124265 SAM.gov Q&A.pdf PDF
A10 1124265 SAM.gov Q&A.pdf PDF
A10 1124265 SAM.gov Q&A.pdf PDF
A10 1124265 SAM.gov Q&A.pdf PDF
CaldorTrailBridgeRelief_1.pdf PDF
CaldorTrailBridgeRelief_2.pdf PDF
10. Davis-Bacon Act WD# CA20240007 (El Dorado County).txt TXT text file
6. Project Map.pdf PDF
3. Schedule of Items.pdf PDF
2. Scope of Work.pdf PDF
5. As-Built Drawings - Sheet 1-3.pdf PDF
1. SF 1442_12970224R0034.pdf PDF
7. Fire Plan.pdf PDF
9. Specs FP-14.pdf PDF
8. Forest Service Supplemental Specifications.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AutoCAD SHX Text %%u DECKING AND RUN PLANK PLAN %%u

AutoCAD SHX Text Scale: 3/8" = 1'-0"

AutoCAD SHX Text ~C Deck plank, typ.

AutoCAD SHX Text 3" Typ., U.O.N.

AutoCAD SHX Text Run Plank joint centered on deck plank below, typ.

AutoCAD SHX Text #14 x 3" Long galvanized wood screw @ 2'-0" o.c. staggered except as noted and centered on deck plank below. Place 2 extra screws at each end of each run plank. Recess all heads 1/4" (typ.)

AutoCAD SHX Text 2 x 12 Run planks (Rough)

AutoCAD SHX Text ~C Bridge

AutoCAD SHX Text Abut. 2 (Existing)

AutoCAD SHX Text Bevel end runplanks

AutoCAD SHX Text

AutoCAD SHX Text 1~8

AutoCAD SHX Text Abut. 1 (Existing)

AutoCAD SHX Text 2 x 8 (S4S) Douglas Fir deck plank

AutoCAD SHX Text 2 x 12 (S4S) Douglas Fir deck plank, typ. (tot. 63)

AutoCAD SHX Text 2 x 8 (S4S) Douglas Fir deck plank at each end of bridge (tot. 2)

AutoCAD SHX Text ~C Span. Existing HSS 4x4x " stringer splice, 2 places below decking. Heat straighten 14" stringer splice, 2 places below decking. Heat straighten HSS to realign splice plate holes, typ both splice plates. Bolt each splice with two 3/4-10 x 2", F3125, Grade A325, type 3 bolts and nuts. See "Section at Stringer Splice" below.

AutoCAD SHX Text 2x8 x 5'-11 " (S4S) 14" (S4S) Douglas Fir deck plank, one at each end of bridge (tot. 2)

AutoCAD SHX Text 2x12 x 5'-11 " 14" (S4S) Douglas Fir deck plank, (tot. 63)

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text %%u PARTIAL DECK PLANK PLAN %%u

AutoCAD SHX Text Scale: 1/2" = 1'-0"

AutoCAD SHX Text (Symmetrical about ~C span)

AutoCAD SHX Text Run Planks not shown.

AutoCAD SHX Text %%u SECTION AT STRINGER SPLICE %%u

AutoCAD SHX Text Scale: 1/2" = 1'-0"

AutoCAD SHX Text 1/4-20 x 2 " carriage bolt, 12" carriage bolt, w/ lock nut, 2 places on centerline each plank. Field drill " diameter holes in 516" diameter holes in plank. Template location from holes in heat straightened center nailer angle. Set bolt head flush with top of plank.

AutoCAD SHX Text 1/4-20 x 2 " hex head 12" hex head bolt, w/ lock nut, 1 place each end of plank. Drill " 516" diameter holes in plank. Template location from holes in plank support angle.

AutoCAD SHX Text Existing plank hold down steel bar. Existing plank support angle below. Typ. each end of plank.

AutoCAD SHX Text 2x12 Rough run planks

AutoCAD SHX Text 2x12 S4S Douglas Fir deck planks, center on bridge.

AutoCAD SHX Text Existing prefabricated weathering steel truss bridge

AutoCAD SHX Text 3/4-10 x 2", F3125, Grade A325 hex bolt, type 3, and nut, 2 places per splice. (tot. 4)

AutoCAD SHX Text 1/4-20 x 2 " 12" hex head bolt, w/ lock nut, each end of plank

AutoCAD SHX Text 1/4-20 x 2 " carriage bolt, 12" carriage bolt, w/ lock nut, 2 places on centerline each deck plank.

AutoCAD SHX Text Existing HSS 4x4x " 14" stringer, 2 places. Heat straighten to realign splice plate holes, typ both splice plates.

AutoCAD SHX Text Existing 3x2x " steel center 316" steel center nailer. Heat straighten to align with tops of plank supports and stringers.

AutoCAD SHX Text Existing steel plank support

AutoCAD SHX Text Existing steel plank hold down

AutoCAD SHX Text

DISREGARD PRINTS BEARING EARLIER DATES

AutoCAD SHX Text

AND DATE

AutoCAD SHX Text

STAFF ENGINEER TRANSPORTATION STRUCTURES

AutoCAD SHX Text

REGIONAL ENGINEER

AutoCAD SHX Text

REVISION MARK

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

U. S. DEPARTMENT OF AGRICULTURE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BRIDGE SHEET

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

OF

AutoCAD SHX Text

FOREST SERVICE

AutoCAD SHX Text

REGION FIVE

AutoCAD SHX Text

STATE

AutoCAD SHX Text

FOREST

AutoCAD SHX Text

TOTAL

AutoCAD SHX Text

SHEETS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SAYLES CANYON

AutoCAD SHX Text

TRAIL BRIDGE

AutoCAD SHX Text Deck Restoration

AutoCAD SHX Text As Noted

AutoCAD SHX Text R-1738

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text H. Dodini

AutoCAD SHX Text 1/30/24

AutoCAD SHX Text C. Shields

AutoCAD SHX Text 1/30/24

AutoCAD SHX Text

ELDORADO

AutoCAD SHX Text

CA

AutoCAD SHX Text D. Pereira

AutoCAD SHX Text 1/31/24

AutoCAD SHX Text Removal of Structures and Obstructions

AutoCAD SHX Text Lump Sum

AutoCAD SHX Text

* 20301

AutoCAD SHX Text Untreated Structural Timber and Lumber (run planks)

AutoCAD SHX Text Treated Structural Timber and Lumber (deck planks)

AutoCAD SHX Text 55702

AutoCAD SHX Text 55701

AutoCAD SHX Text

0.642 MBFM

AutoCAD SHX Text

0.764 MBFM

AutoCAD SHX Text

ITEM NO DESCRIPTION QUANTITY

AutoCAD SHX Text

ESTIMATED BRIDGE QUANTITIES

AutoCAD SHX Text

* Pay Item 20301 consists of removing the existing temporary timber decking and disposing off Forest Service land. Also includes removing soil and debris from bridge abutment seats.

AutoCAD SHX Text Mobilization

AutoCAD SHX Text Lump Sum

AutoCAD SHX Text 15101

AutoCAD SHX Text GENERAL NOTES: SPECIFICATIONS: DESIGN: AASHTO LRFD Bridge Design Specifications, 9th edition, 2020, and the AASHTO LRFD Guide Specifications for the Design DESIGN: AASHTO LRFD Bridge Design Specifications, 9th edition, 2020, and the AASHTO LRFD Guide Specifications for the Design of Pedestrian Bridges. CONSTRUCTION: Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects (FP-14), with Forest Service Supplemental Specifications. DESIGN LOADS: Concrete = 150 PCF; Timber = 50 PCF; Pedestrian Live Load = 90 PSF; Earth pressure equivalent to a fluid weighing 36 PCF. Concrete = 150 PCF; Timber = 50 PCF; Pedestrian Live Load = 90 PSF; Earth pressure equivalent to a fluid weighing 36 PCF. Snow Load = 400 PSF. Snow load and Pedestrian Live Load are not combined. Equestrian Live Load = 1,000 pound single hoof load over a deck plank square area measuring 4 inches on a side. TIMBER: Deck planks shall be Douglas Fir-Larch No. 1 or better, S4S. Run Planks shall be Douglas Fir-Larch No. 2 or better, rough. Deck planks shall be Douglas Fir-Larch No. 1 or better, S4S. Run Planks shall be Douglas Fir-Larch No. 2 or better, rough. lMaximum moisture content for timber shall be 19%. All timber except run planks shall be pressure treated with copper naphthenate in heavy oil, in accordance with AASHTO M133; AWPA and AWPA U1-09, Use Category UC4B. Treated materials shall follow the post treatment requirements summarized in "Best Management Practices for the Use of Treated Wood in Aquatic Environments" (WWPI 1196), to ensure all surfaces are free of excess preservative, and chemicals are adequately fixated in the wood. All wood members shall be cut and drilled before treatment, UNO. When miscellaneous field drilled holes and cuts are required because of mis-alignment, they must be approved by the Engineer. All field drilled holes and cuts shall be treated with two applications of copper naphthenate 2% solution. Lead holes are required for all bolts and screws. Driving of lag bolts and screws will not be permitted. STRUCTURAL STEEL: All structural steel plate and shapes for the prefabricated bridge shall conform to AASHTO M270, Grade 50W (ASTM A709, All structural steel plate and shapes for the prefabricated bridge shall conform to AASHTO M270, Grade 50W (ASTM A709, Grade 50W or A588) and ASTM A847 for hollow structural sections (HSS). Minimum HSS wall thickness shall be ". This steel is intended for 14". This steel is intended for use in unpainted condition and shall not be painted. All weathering steel shall be blast cleaned to remove alll mill scale and permit even weathering as provided in SSPC-SP-6 Commercial Blast Cleaning. Bolts shall conform to ASTM F3125, Grade A325, type 3. MISCELLANEOUS STEEL: Deck hardware shall conform to ASTM A 307. All steel shall be hot dipped galvanized per AASHTO 232 (ASTM A153) Deck hardware shall conform to ASTM A 307. All steel shall be hot dipped galvanized per AASHTO 232 (ASTM A153) after fabrication. FABRICATION: Submit shop drawings for all replaced timber decking and steel bridge components. Show all dimensions and fabrication details Submit shop drawings for all replaced timber decking and steel bridge components. Show all dimensions and fabrication details for all cut or bored timber. Reference Continental Bridge shop drawing 2004209, dated 9/21/04, for existing prefabricated bridge dimensions not shown. Contractor shall verify all as-built dimensions before start of work.

AutoCAD SHX Text ** Pay Item 55501 consists of heat straightening the fire warped 3x2 x steel center 316 steel center nailer to be on the same plane as the tops of the two stringers and the two plank edge support angles. Also includes heat straightening the two steel HSS 4x4 x stringers, to 14 stringers, to realign and bolt the two stringer splices.

AutoCAD SHX Text Steel Structures

AutoCAD SHX Text **55501

AutoCAD SHX Text Lump Sum

Sheets and Views
Layout1
2024-02-01T11:21:29-0800
Darrell Pereira
2024-02-01T11:29:01-0800
LEONARD JOB

File details come from the government source that posted it. Updated .