This document is a Schedule of Items for the Sayles Canyon Trail Bridge Repair project under the Placerville Ranger District/Eldorado National Forest. The project requires the repair of the metal stringers/nailers and replacement of the wooden decking and running planks on the trail bridge spanning Sayles Creek. The contractor must remove any temporary decking materials. The bridge must meet minimum width and railing height requirements. The project is valued between $25,000 and $100,000, and a pre-bid site visit will be held on May 16, 2024. Bonds are required for projects over $35,000, and Davis-Bacon wages apply. Requests for Information (RFIs) must be submitted by May 23, 2024. The Period of Performance is from August 15, 2024, through November 15, 2025.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15-Nov-24
ITEM
NUMBER DESCRIPTION UNIT QUANTITY
0001 15101 Mobilization LS 1
0002 20305 Removal of Structure and Obstructions LS 1
0003 55501 Steel Structures LS 1
0004 55701 Treated Structure, Timber & Lumber (Decking) MBFM 0.764
0005 55701 Untreated Structure, Timber & Lumber (Running Plank) MBFM 0.642
Anticipated Delivery Date (Required for Supply and Construction)
SCHEDULE OF ITEMS
Placerville Ranger District/Eldorado National Forest/Trail Bridge Construction
PROJECT TITLE: Sayles Canyon Trail Bridge Repair
FILL OUT THE AREAS IN RED BELOW
SCHEDULE OF ITEMS
Placerville Ranger District/Eldorado National Forest/Trail Bridge Construction
PROJECT TITLE: Sayles Canyon Trail Bridge Repair
WORKPLAN ACQUISITION PLAN/REQUISITION NO: 684297
Period of Performance (Required for Services and A&E)