3. Schedule of Items.pdf

PDF 133 KB Posted

Attached to
Eldorado National Forest; Placerville Ranger District; 03 - CON - Disaster, Sayles Canyon Trail Bridge Repairs
Solicitation number
12970224R0034
Issued by

About this file

This document is a Schedule of Items for the Sayles Canyon Trail Bridge Repair project under the Placerville Ranger District/Eldorado National Forest. The project requires the repair of the metal stringers/nailers and replacement of the wooden decking and running planks on the trail bridge spanning Sayles Creek. The contractor must remove any temporary decking materials. The bridge must meet minimum width and railing height requirements. The project is valued between $25,000 and $100,000, and a pre-bid site visit will be held on May 16, 2024. Bonds are required for projects over $35,000, and Davis-Bacon wages apply. Requests for Information (RFIs) must be submitted by May 23, 2024. The Period of Performance is from August 15, 2024, through November 15, 2025.

View the file

Other files

File Type Posted
A10 1124265 SAM.gov Q&A.pdf PDF
A10 1124265 SAM.gov Q&A.pdf PDF
A10 1124265 SAM.gov Q&A.pdf PDF
A10 1124265 SAM.gov Q&A.pdf PDF
A10 1124265 SAM.gov Q&A.pdf PDF
CaldorTrailBridgeRelief_1.pdf PDF
CaldorTrailBridgeRelief_2.pdf PDF
10. Davis-Bacon Act WD# CA20240007 (El Dorado County).txt TXT text file
6. Project Map.pdf PDF
4. Drawings - Sheet 1.pdf PDF
2. Scope of Work.pdf PDF
5. As-Built Drawings - Sheet 1-3.pdf PDF
1. SF 1442_12970224R0034.pdf PDF
7. Fire Plan.pdf PDF
9. Specs FP-14.pdf PDF
8. Forest Service Supplemental Specifications.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15-Nov-24

ITEM

NUMBER DESCRIPTION UNIT QUANTITY

0001 15101 Mobilization LS 1

0002 20305 Removal of Structure and Obstructions LS 1

0003 55501 Steel Structures LS 1

0004 55701 Treated Structure, Timber & Lumber (Decking) MBFM 0.764

0005 55701 Untreated Structure, Timber & Lumber (Running Plank) MBFM 0.642

Anticipated Delivery Date (Required for Supply and Construction)

SCHEDULE OF ITEMS

Placerville Ranger District/Eldorado National Forest/Trail Bridge Construction

PROJECT TITLE: Sayles Canyon Trail Bridge Repair

FILL OUT THE AREAS IN RED BELOW

SCHEDULE OF ITEMS

Placerville Ranger District/Eldorado National Forest/Trail Bridge Construction

PROJECT TITLE: Sayles Canyon Trail Bridge Repair

WORKPLAN ACQUISITION PLAN/REQUISITION NO: 684297

Period of Performance (Required for Services and A&E)