A10 1124265 SAM.gov Q&A.pdf

PDF 72 KB Posted

Attached to
Eldorado National Forest; Placerville Ranger District; 03 - CON - Disaster, Sayles Canyon Trail Bridge Repairs
Solicitation number
12970224R0034
Issued by

About this file

This document consists of questions and answers related to a federal contract opportunity for the repair of the Sayles Canyon Trail Bridge in the Eldorado National Forest.

The contract requires repairing metal stringers/nailers and replacing wooden decking and running planks on the trail bridge. The bridge must have a minimum width of 72 inches between top railings, which shall be no less than 42 inches above the top of the deck. The maximum opening of the side railings shall be 8 inches. The contractor shall supply and install all dimensional lumber, associated hardware, and appurtenances as shown in the drawings. The price range for this contract is between $25,000 and $100,000. A pre-bid site visit will be held on May 16, 2024, and RFIs are due by 12:00 CDT on May 23, 2024. The period of performance is from August 15, 2024, through November 15, 2025. The contract has a NAICS code of 237310 (Other Heavy and Civil Engineering Construction), and bonds are required for projects valued at $35,000 or above. Davis-Bacon wages apply.

View the file

Other files

File Type Posted
A10 1124265 SAM.gov Q&A.pdf PDF
A10 1124265 SAM.gov Q&A.pdf PDF
A10 1124265 SAM.gov Q&A.pdf PDF
A10 1124265 SAM.gov Q&A.pdf PDF
CaldorTrailBridgeRelief_1.pdf PDF
CaldorTrailBridgeRelief_2.pdf PDF
10. Davis-Bacon Act WD# CA20240007 (El Dorado County).txt TXT text file
6. Project Map.pdf PDF
4. Drawings - Sheet 1.pdf PDF
3. Schedule of Items.pdf PDF
2. Scope of Work.pdf PDF
5. As-Built Drawings - Sheet 1-3.pdf PDF
1. SF 1442_12970224R0034.pdf PDF
7. Fire Plan.pdf PDF
9. Specs FP-14.pdf PDF
8. Forest Service Supplemental Specifications.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Received Answers Could you clarify who’s doing the final design? the highlighted lines attached below seem to conflict.

Is a geotechnical engineer required; will the government approve subgrade? There is not a need for a geotechnical engineer and the subgrade will be inspected by the project COR.

Could you provide the site visit date / time? The pre-bid site(s) visit will start at 9 AM at the staging area for the “Clubhouse” bridge on May 16th. Details, maps, and logistics were provided on SAM.gov.

I understand the conflict. “H” would supersede “A” since R-1739-01 (Plan & Elevation) and R-1739-02 (Abutment & Railing Details) have both been approved and signed by the USFS Regional Engineer, Leonard Job upon recommendation of the USFS Regional Bridge Engineer, Darrell Pereira.

Sheet1

File details come from the government source that posted it. Updated .