CaldorTrailBridgeRelief_2.pdf
PDF 637 KB Posted
- Solicitation number
- 12970224R0034
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a solicitation for the repair of the Sayles Canyon Trail Bridge project in the Eldorado National Forest's Placerville Ranger District. The scope of work includes repairing metal stringers/nailers and replacing wooden decking and running planks on the 72-inch wide trail bridge. The location of the bridge is approximately 13.5 miles east of the Silver Fork Store in Kyburz, CA. The estimated price range for this contract is between $25,000 and $100,000. A pre-bid site visit is scheduled for May 16, 2024, and the period of performance is from August 15, 2024, through November 15, 2025. This contract is subject to Davis-Bacon wage requirements, and bonds are required for projects with a value of $35,000 or above. Requests for Information (RFIs) are due by May 23, 2024.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WILDERNESS
BOUNDARY
TA
HO
E
BA
SI
N
MANAGEMENT
UNIT
P L A C
E R V I
L L E
RANGER
DISTRICT
E L D O R A D O
N A T I O N A L
F O R E S T
SK
I
LI
FT
Phillips
Pinecrest Camp
SKI
LIFT
Nebelhorn
SK
I
LIFT
SKI LIFTSCamp Sacramento
SKI
LIFTS
Sierra at Tahoe
SK
I L
IF
T
Little Norway
Tamarack Creek
Lake Audrian
Bryan
Creek
Pyramid
Creek
So uth
Fork
Am eri ca n
River
Aspen
Creek
Sayles Flat
Huckleberry Flat
PYRAMID CREEK
SIERRA AT TAHOE
ECHO
LAKESD e s o la t i o nD e s o la t i o n
W i ld e r n e s sW i ld e r n e s s Lake
Audrian
Cup Lake
T11 N R17 E T11 N R18 E
12 7
13E19 13E19 1 7E
17E 14
17E
17E2 5
13E19
13E19
11NY32
11N 11 11N10
11N16A
11N
11N06
N0
9A
N0
11N06A
N1
11N
11N10 A
T:\FS\NFS\Eldorado\Program\2300Recreation\GIS\Workspace\Requests\TrailBridgeDistasterRelief\MXD\CaldorTrailBridgeRelief.mxd 0 0.5 1 1.5 20.25
Miles
Legend Bridge Point U.S. Highway Roads Open to All Vehicles, Seasonal Roads Open to Highway Legal Vehicles Only, Yearlong Roads Open to Highway Legal Vehicles Only, Seasonal State or US Highway Other Public Roads Trails Open to All Vehicles, Yearlong Non-Motorized Trail
Administrative Boundary Township Section Ranger District Boundary Stream/River: Perennial Stream/River: Intermittent Stream/River: Ephemeral Wilderness
USDA FOREST SERVICE
NON-FS
M o k e l u m n e W i l d e r n e s sM o k e l u m n e W i l d e r n e s s
D e s o la t i o n W i l d e r n e s sD e s o la t i o n W i l d e r n e s s
Pony Express Trail Bridges Page2 of 2 donomorrill Sticky Note Sayles Canyon trail bridge 13E19 elevation 6,600' complex 66' length 38.799290, -120.111170 Steel Side Truss Ground Snow Load is 368 PSI donomorrill Sticky Note Aspen Creek 13E19 elevation 7,000' major 22' length 38.807764, -120.081643 replace standard bridge design Ground Snow Load 422 PSI donomorrill Sticky Note Huckleberry Flat trail bridge 13E19 elevation 7200' minor 20' length 38.815951, -120.057104 replace standard bridge design Ground Snow Load 411 PSI
File details come from the government source that posted it. Updated .