4 CRSAW_REPORT.pdf

PDF 98 KB Posted

Attached to
Pump Assemblies
Solicitation number
FA851725RRepairofMechanicalTransmissionAssembly
Issued by

About this file

This is a Contract Repair Screening Analysis Worksheet (AFMC Form 762) for an axial piston pump (NSN 4320012169809VX, P/N 60244-40687) used in the B-1B/B-52 weapon systems and MHU-196/M and MHU-204/M end items.

The analysis, initiated on March 28, 2024, indicates an annual repair quantity of 6 units with a latest repair cost of $2,880 per unit and forecast unit price of $3,024, totaling an annual repair budget of $17,280. The item has previously been contract repaired by multiple vendors, including Motion Industries Inc. (most recent award FA851720P0008 on June 11, 2020) and Textron Systems Corporation. The worksheet confirms this is a commercial item that can be overhauled/repaired under FAR Part 12, does not require precontract qualification, and is not a critical safety item. No organic repair or DMISA repair capability currently exists. The RMC/RMSC code is R1/Z with an expiration date of October 11, 2028. Special tools, facilities, and government furnished materials are not required for repair.

View the file

Other files

File Type Posted
FA851725Q0014 02 061825.pdf PDF
25-00011 PWS Final042425.pdf PDF
Solicitation042425.pdf PDF
FA851725Q0014.pdf PDF
FA851725Q0014.pdf PDF
2 QAIRQMT_REPORT.pdf PDF
3 QAIRQMT_REPORT.pdf PDF
PWS_JAN2825.pdf PDF
3 CRSAW_REPORT.pdf PDF
2 CRSAW_REPORT.pdf PDF
3 ITMDESC_REPORT.pdf PDF
4075111_PKGRQMT_REPORT.pdf PDF
1 QAIRQMT_REPORT.pdf PDF
4 QAIRQMT_REPORT.pdf PDF
1 ITMDESC_REPORT.pdf PDF
1 CRSAW_REPORT.pdf PDF
2 ITMDESC_REPORT.pdf PDF
4 ITMDESC_REPORT.pdf PDF
4074969_TRNSPDATA_REPORT.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT REPAIR SCREENING ANALYSIS WORKSHEET

PART I (To be completed by PMS Seller)

1. FORM INITIATION DATE

28 MAR 2024

2. FORM PRIORITY

3. NSN

4320012169809VX

4. PART NUMBER

60244-40687

5. PART NUMBER CAGE CODE

97384

6. NOUN

PUMP,AXIAL PISTONS

7. ANNUAL REPAIR

QUANTITY

8. LATEST REPAIR COST

$2,880.0000

9. ANNUAL REPAIR

BUDGET VALUE

$17,280.00

10. FORECAST UNIT

PRICE

$3,024.0000

11. ERRC

T

12. WEAPON SYSTEM

B-1B/B-52

13. END ITEM APPLICATION

MHU-196/M and MHU-204/M

14. HISTORY

DOES ORGANIC REPAIR OR DMISA REPAIR CAPABILITY CURRENTLY EXIST? X NO YES (if yes, specify SOR)

HAS THE ITEM PREVIOUSLY BEEN CONTRACT REPAIRED?

IF YES, COMPLETE TABLE BELOW FOR LAST 5 YEARS (not to exceed last 3 contracts)

NO X YES

SOURCE NAME CAGE CONTRACT NUMBER AWARD DATE

MOTION INDUSTRIES, INC. 11 JUN 20204N240 FA851720P0008

SANDRA L COLLIER 30 JUN 201667V88 FA851716P0008

SANDRA L COLLIER 30 SEP 201367V88 FA851713M0043

TEXTRON SYSTEMS CORPORATION 29 JUL 201097384 FA851710D00030001

TEXTRON SYSTEMS CORPORATION 12 SEP 200897384 N0038308G004PRJ01

15. PMS SELLER NAME CODE OFFICE SYMBOL PHONE COMPLETION DATE

PART II (To be completed by Equipment Specialist)

16. TECHNICAL ORDERS REQUIRED NO YES (annotate required data and availability on RDL) X UNKNOWN

17. OTHER SPECIFICATIONS / SPECIAL REPAIR CRITERIA REQUIRED NO YES (annotate required data and availability on RDL) X UNKNOWN

18. THE DATA LISTED IN RDL COMPLETED SPECIFIES THE REPAIR REQUIREMENTS OR

X ADDITIONAL DATA IS REQUIRED (Coordinate with the engineer and screening office to determine information required. Document in Block 33)

19. SPECIAL TOOL / SPECIAL TEST EQUIPMENT IS X NOT REQUIRED REQUIRED REQUIRED BUT NOT AVAILABLE

SPECIAL FACILITIES ARE X NOT REQUIRED REQUIRED

GOVERNMENT FURNISHED MATERIAL IS X NOT REQUIRED REQUIRED REQUIRED BUT NOT AVAILABLE

20. EQUIPMENT SPECIALIST NAME

Rouse, Timothy

CODE

OE

OFFICE SYMBOL

410 SCMS / GULB

PHONE

478-222-0146

COMPLETION DATE

04 APR 2024

PART III (To be completed by Screening Technician if applicable)

21. REQUESTED ENGINEERING DATA

LISTED AND ANNOTATED ON RDL X NO DATA

22. SCREENING TECHNICIAN REMARKS

23. SCREENING TECHNICIAN NAME CODE OFFICE SYMBOL PHONE COMPLETION DATE

Page 1 of 2AFMC FORM 762, 20060201, V1 Version 9Generated by PRPS using Jasper Reports on 30 Jan 2025

CONTRACT REPAIR SCREENING ANALYSIS WORKSHEET

PART IV (To be completed by the Engineer)

24. CRITICAL SAFETY ITEM

X NO YES

25. CAN THIS ITEM BE COMMERCIALLY

OVERHAULED / REPAIRED (FAR Part 12)

NO X YES

26. PRECONTRACT QUALIFICATION

REQUIRED

X NO YES (JQR/QR, SQS, Waiver)

27. RDL REQUIRED FOR

SOLICITATION

X NO YES

28. RMC / RMSC CODE

R1 / Z

29. RMC / RMSC EXPIRATION DATE

11 OCT 2028

30. REASON FOR OTHER THAN G CODE AND ACTION TO REMEDY

Commercial off the shelf

31. APPROVED / POTENTIAL SOURCES

CAGE

CODE DATE APPROVED

32. ENGINEER NAME

Nichols, Zakary G

CODE

N/A

OFFICE SYMBOL

410 SCMS / GULB

PHONE

478-327-9552

COMPLETION DATE

12 APR 2024

PART V (Miscellaneous, if needed)

33. REMARKS (Remarks require Functional Responsibility / Name / Office Symbol / Phone)

Page 2 of 2AFMC FORM 762, 20060201, V1 Version 9Generated by PRPS using Jasper Reports on 30 Jan 2025

File details come from the government source that posted it. Updated .